Clay subgrade failures under track develop in stages (Selig and Waters 1994; Chapter 2.3, Section 2.3.5):
| Mode | Mechanism | Signs | Remedies |
|---|---|---|---|
| Progressive shear failure | Repeated wheel loads exceed the strength of wet clay just below the subballast | Heaving of the shoulder; ballast in the ditch line; recurring surface defects | Thicker granular layer; improve drainage; lime or cement stabilization |
| Excessive plastic deformation (ballast pocket) | Accumulated permanent strain forms a trough that traps water and ballast | Water-filled pockets of ballast found when trenching across the track; soft spots | Drain the pocket (lateral drains through the shoulder); undercut and rebuild with a blanket layer |
| Subgrade attrition and mud pumping | Wet clay surface abrades and slurries under ballast or subballast and is pumped upward | Fines and mud at the ballast surface; white or gray stains on ties | Sand blanket or geotextile separation; restore drainage |
| Consolidation settlement | Clay foundation under new or raised fill continues to consolidate | Long, smooth dips over soft ground | Surcharge, wick drains, lightweight fill |
| Shrink and swell | Seasonal moisture change in expansive clay | Seasonal cross-level and surface variation; shoulder cracking | Section 2.5.8 |
Design the granular layer thickness above clay subgrade so that the deviator stress at the subgrade is well below its strength under repeated loading (Chapter 2.3, Section 2.3.4). Soaked CBR of CL is typically 3 to 8 and of CH 1 to 5 (Chapter 7.3, Section 7.3.2).