↑ Parent Menu⌂ Main Menu
← Chapter 2.5 Clays: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.5.10 Other Clay Hazards

Clay is the soil whose behavior depends most on water and time: it is strong when dry and weak when wet, it consolidates for years under new fill, it swells and shrinks with the seasons, and in cut slopes it slowly loses strength until it slides.
Author: Daniel P. Colwell
2.5.10 Other Clay Hazards
HazardRecognitionEngineering response
Sensitive and quick claySt > 8; LI > 1; low salt content in marine clay; history of flow slides along the valleyAvoid unloading the toe or cutting into slopes; check retrogressive flow-slide potential; restrict vibration and pile driving
Dispersive clayTunnels, jug holes and gullies after first rains; cloudy water in ditchesCrumb (ASTM D6572), double hydrometer (D4221) and pinhole (D4647) tests; filters and lime treatment
Desiccation cracks and fissuresPolygonal cracks at the surface; slickensided fissures in samplesMass strength lower than small-sample strength; water enters cracks and adds pressure at the back of slides
Frost in clayPI > 12 clays are F3; lean clays with PI < 12 and varved clays are F4Frost protection depth per Chapter 7.3, Section 7.3.5
Clay over karstSinkholes, closed depressions, pinnacled rockGeophysics and probing; see Chapter 2.7
← Previous · 2.0 The Underworld Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction
Next · 2.0 The Underworld → Chapter 2.6 — Peats and Organic Soils: Properties, Typical Values and Behavior