Clays plot on or above the A-line on the Casagrande plasticity chart: CL for LL < 50 and CH for LL ≥ 50 (ASTM D2487). Soils with 4 ≤ PI ≤ 7 above the A-line are CL-ML and often behave like silt (Chapter 2.4).
Eq. 2.5-1
The activity (Skempton 1953) relates plasticity to the amount of clay-size material and indicates the clay mineral:
Eq. 2.5-2 (Skempton 1953)
| Mineral | Activity, A | Typical LL | Typical PI | Swell potential | Residual φ′r (deg) |
|---|---|---|---|---|---|
| Kaolinite | 0.3–0.5 | 30–110 | 25–40 | Low | 12–18 |
| Illite | 0.5–1.3 | 60–120 | 35–60 | Low to moderate | 8–12 |
| Ca-montmorillonite (smectite) | 1.5 | 100–200 | 50–120 | High | 5–8 |
| Na-montmorillonite (smectite) | 4–7 | 300–700 | 250–650 | Very high | 4–6 |
Ranges compiled from Mitchell and Soga (2005) and Holtz, Kovacs and Sheahan (2011) for pure minerals; natural clays are mixtures and fall between these values.
| Activity | Class | Meaning |
|---|---|---|
| < 0.75 | Inactive | Kaolinite or illite-rich; low volume change |
| 0.75–1.25 | Normal | Mixed mineralogy |
| > 1.25 | Active | Smectite-rich; check for swell and low residual strength |
Clay has no to slow dilatancy, medium to very high dry strength and medium to high toughness. Fat clay (CH) feels sticky and greasy and dries to hard lumps that cannot be crushed with the fingers. Record the consistency (very soft to hard) from the thumb test or a pocket penetrometer on every sample.