Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.5.0 Executive Summary

Clay is the soil whose behavior depends most on water and time: it is strong when dry and weak when wet, it consolidates for years under new fill, it swells and shrinks with the seasons, and in cut slopes it slowly loses strength until it slides.
Author: Daniel P. Colwell
2.5.0 Executive Summary

Clays are fine-grained soils whose behavior is controlled by clay minerals: plate-shaped particles finer than about 0.00008 in. with large surface areas and electrical charges that bind water. Clays are classified CL (lean) or CH (fat) under the USCS, and they dominate the subgrade, embankment and cut-slope problems of many railroad lines.

The engineering problems come from five properties:

  • Low permeability and slow consolidation. Fills over soft clay settle for months to decades, and soft clay can fail in undrained shear while the fill is being placed.
  • Strength depends on drainage and stress history. The same clay has an undrained strength for rapid loading and a different drained strength for the long term. Overconsolidated clay is much stronger than normally consolidated clay at the same depth.
  • Strength loss with time. Stiff, overconsolidated and fissured clays in cut slopes soften toward their fully softened strength over decades, and once a slide has moved, the slip surface drops to residual strength.
  • Volume change with moisture. Clays rich in smectite (montmorillonite) swell when wetted and shrink when dried, heaving and cracking track, slabs and structures.
  • Pumping under traffic. Wet clay subgrade softens under repeated wheel loads, forms ballast pockets and pumps slurry into the ballast.

This chapter gives typical values, correlations and equations for clays, and the screening and design steps for each problem. Use Appendix D for first-pass values from blow counts and Atterberg limits.

Use of the values in this chapter. The ranges are typical values from the published sources listed under Author and Sources, for screening and preliminary design. Site-specific testing governs final design.