For long-term stability of cut slopes and embankments, use effective-stress strength. Stiff, overconsolidated and fissured clays lose strength in cuts and compacted fills over years to decades, as swelling and weathering break down their structure. That is why many clay cut slopes stand for decades and then fail without any obvious trigger.
| Strength | Where it applies | How to obtain it |
|---|---|---|
| Peak (c′, φ′) | Intact, unweathered clay that has not been unloaded or softened; first-time analyses of new fills in lean clay | CU triaxial with pore pressure (ASTM D4767) or direct shear (D3080) on undisturbed samples |
| Fully softened (c′ ≈ 0, φ′fs) | Cut slopes in stiff clay; compacted clay embankments; any slope where the clay has been through wetting and drying cycles | Direct shear or triaxial on normally consolidated reconstituted samples; torsional ring shear (ASTM D7608); Stark correlations |
| Residual (c′ = 0, φ′r) | Slip surfaces of previous slides; bedding shears in clay shale; reactivated landslides | Torsional ring shear (ASTM D6467); repeated direct shear; Stark correlations |
Eq. 2.5-6 (Bjerrum and Simons 1960; peak, normally consolidated)
| Liquid limit | Clay fraction (%) | Peak φ′ (deg) | Fully softened φ′fs (deg) | Residual φ′r (deg) |
|---|---|---|---|---|
| 30–40 | < 20 | 30–34 | 30–33 | 24–32 |
| 40–60 | 25–45 | 26–30 | 24–30 | 15–24 |
| 60–100 | > 50 | 22–26 | 18–25 | 9–16 |
| 100–200 (smectitic clay shale) | > 50 | 18–22 | 12–18 | 5–9 |
Fully softened and residual ranges after Stark and Eid (1994, 1997) and Stark, Choi and McCone (2005), for effective normal stress of about 1,000 to 4,000 psf. Both envelopes are curved: at the low normal stresses of shallow slides the secant angle is higher than at 4,000 psf. Use the stress-dependent envelope, not one angle, for shallow failures.
For railroad cut slopes in stiff clay and clay shale, design long-term stability with fully softened strength and c′ = 0, and analyze any slope with past movement using residual strength along the existing slip surface. See Chapter 6.3, Section 6.3.6.