↑ Parent Menu⌂ Main Menu
← Chapter 2.5 Clays: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.5.15 Clay Investigation and Design Checklist

Clay is the soil whose behavior depends most on water and time: it is strong when dry and weak when wet, it consolidates for years under new fill, it swells and shrinks with the seasons, and in cut slopes it slowly loses strength until it slides.
Author: Daniel P. Colwell
2.5.15 Clay Investigation and Design Checklist

Checklist · Part X · Problem Soils

Clay Investigation and Design Checklist

Investigation0 of 6
Laboratory Testing0 of 6
Analysis and Design0 of 6
Construction and Reporting0 of 4
Ticks are saved in this browser.
← Previous · 2.0 The Underworld Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction
Next · 2.0 The Underworld → Chapter 2.6 — Peats and Organic Soils: Properties, Typical Values and Behavior