For rapid loading of saturated clay (embankment construction, train loading, end-of-construction cut slopes), stability is controlled by the undrained shear strength su. su is not a single property: it depends on the stress history, the mode of shear and the rate of loading.
Eq. 2.5-3 (σ′p from consolidation tests, or from CPTu after Mayne)
Eq. 2.5-4 (Ladd and Foott 1974; Ladd 1991)
Where:
Eq. 2.5-5 (fit by Morris and Williams 1994 to Bjerrum 1972; μ ≈ 1.0 at PI = 20 and 0.83 at PI = 40)
| Parameter | Typical value | Notes |
|---|---|---|
| su/σ′v0, normally consolidated (DSS) | 0.20–0.25 | Mesri (1975): su/σ′p ≈ 0.22 for field-vane-corrected strength |
| su/σ′p from PI | 0.11 + 0.0037 PI | Skempton (1957); normally consolidated clays |
| Sensitivity, St = su/su,remolded | 2–4 most clays; 4–16 sensitive to extra-sensitive; > 16 quick | Quick clays occur mainly in glacial marine deposits of eastern Canada and Scandinavia |
| Undrained modulus, Eu/su | 200–500 (CL); 100–300 (CH) | Duncan and Buchignani (1976); lower at high OCR and high PI |
| Rate effect | +5% to +10% per log cycle of strain rate | Rapid train loading sees higher su than slow fill placement |