Clays rich in smectite take up water between their mineral layers and swell; they shrink when they dry. Under track, the seasonal cycle causes heave in wet seasons, shrinkage and longitudinal cracking of the embankment shoulders in dry seasons, and recurring surface and cross-level defects. Damage is greatest where moisture changes unevenly: at the edges of embankments, near trees, at culverts and at transitions between cut and fill.
| Percent passing No. 200 | Liquid limit | SPT N (blows/ft) | Probable expansion (%) | Swelling pressure (ksf) | Degree of expansion |
|---|---|---|---|---|---|
| > 95 | > 60 | > 30 | > 10 | > 20 | Very high |
| 60–95 | 40–60 | 20–30 | 3–10 | 5–20 | High |
| 30–60 | 30–40 | 10–20 | 1–5 | 3–5 | Medium |
| < 30 | < 30 | < 10 | < 1 | < 1 | Low |
Probable expansion is the total volume change from air-dry to saturated under 1 ksf. Index classification is a screen only.
Eq. 2.5-11 (Seed, Woodward and Lundgren 1962; compacted soils at optimum moisture under 1 psi surcharge)
Eq. 2.5-11 gives about 3% swell at PI = 20, 9% at PI = 30, 23% at PI = 45 and 47% at PI = 60. It overestimates swell of natural undisturbed clays; use it to rank soils, then measure swell with ASTM D4546 (one-dimensional swell or collapse) under the design overburden.
Eq. 2.5-12 (oedometer method; σ′sw = swelling pressure, σ′f = final vertical stress, Cs = swell index)

