| Property | Soft CL/CH (normally consolidated) | Stiff CL (overconsolidated) | CH (fat clay) | Glacial till (CL matrix) | Sensitive glacial marine clay |
|---|---|---|---|---|---|
| Liquid limit, LL | 30–80 | 25–45 | 50–100 | 20–35 | 30–60 |
| Plasticity index, PI | 12–50 | 10–25 | 30–70 | 8–18 | 10–30 |
| Natural water content, w (%) | 30–70 (near or above LL) | 15–25 (near PL) | 25–60 | 8–15 | 40–80 (above LL) |
| Liquidity index, LI | 0.6–1.2 | 0–0.3 | 0.1–0.8 | < 0.2 | 1.0–2.5 |
| Total unit weight, γ (pcf) | 95–115 | 120–130 | 100–120 | 130–145 | 95–110 |
| Void ratio, e | 0.9–2.0 | 0.4–0.7 | 0.7–1.6 | 0.2–0.4 | 1.0–2.2 |
| Specific gravity, Gs | 2.65–2.80 | 2.68–2.75 | 2.70–2.80 | 2.68–2.75 | 2.70–2.80 |
| Permeability, k (ft/day) | 0.00003–0.003 | 0.00003–0.003 (higher through fissures) | 0.000003–0.0003 | 0.0003–0.03 (sand lenses higher) | 0.0003–0.003 |
| USACE frost group | F3 (PI > 12) or F4 (PI < 12) | F3 (PI > 12) or F4 (PI < 12) | F3 | F2–F3 | F4 (varved) |
Ranges compiled from Holtz, Kovacs and Sheahan (2011), Terzaghi, Peck and Mesri (1996), Kulhawy and Mayne (1990) and USACE EM 1110-3-138.
Moisture content relative to the Atterberg limits is the quickest indicator of clay condition: a clay with w near or above its liquid limit is soft and normally consolidated (or sensitive); a clay with w near its plastic limit is stiff and overconsolidated or desiccated. The liquidity index (LI = (w − PL)/PI) and its relation to strength are given in Appendix D, Section D.4.