| Parameter | Soft CL | Soft CH | Stiff CL (OC) | Sensitive clay |
|---|---|---|---|---|
| Compression ratio, Cc/(1 + e0) | 0.10–0.20 | 0.15–0.30 | 0.05–0.12 (beyond σ′p) | 0.2–0.5 (beyond σ′p) |
| Recompression ratio, Cr/(1 + e0) | 0.01–0.03 | 0.02–0.05 | 0.005–0.02 | 0.005–0.02 |
| Coefficient of consolidation, cv (ft2/day) | 0.1–1 | 0.02–0.3 | 0.3–3 | 0.05–0.5 |
| Cα/Cc | 0.04 ± 0.01 | 0.04 ± 0.01 | 0.04 ± 0.01 | 0.025–0.035 |
After Terzaghi, Peck and Mesri (1996), Mesri and Godlewski (1977) and Holtz, Kovacs and Sheahan (2011). cv from laboratory tests is often lower than field values, where sand seams and fissures shorten drainage paths.
Eq. 2.5-7 (Terzaghi and Peck 1967; Koppula 1981)
Eq. 2.5-8
Eq. 2.5-9 (Tv = 0.197 at 50% and 0.848 at 90% consolidation)
Knowing the preconsolidation stress matters more than any other parameter: the worked example in Section 2.5.12 shows a lightly overconsolidated clay settling about half as much as the same clay assumed normally consolidated. Measure σ′p with consolidation tests (ASTM D2435 or D4186) on high-quality samples; sample disturbance flattens the curve and hides σ′p. See Chapter 6.2, Sections 6.2.4 to 6.2.6.