↑ Parent Menu⌂ Main Menu
← Chapter 2.5 Clays: Properties, Typical Values and Behavior
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.5.16 Practice Questions

Clay is the soil whose behavior depends most on water and time: it is strong when dry and weak when wet, it consolidates for years under new fill, it swells and shrinks with the seasons, and in cut slopes it slowly loses strength until it slides.
Author: Daniel P. Colwell
2.5.16 Practice Questions
Each question is worked in the same five parts as the examples. Question 2.5-3 is a reasoning question, so its steps are a chain of reasoning rather than equations.
Question 2.5-1: Group, Activity and Liquidity Index of a Clay

Problem Statement

A clay sample from the cut slope of a Class I railroad has the Atterberg limits, water content and clay fraction shown. The engineer must classify the clay, compute its activity and liquidity index, and say what they suggest about the clay’s history and behavior in the cut.

Three index properties that together say what kind of clay this is and what state it is in.

102030405060708090102030405060A-lineU-lineCLCHMLMH or OHLL = 50Liquid limit, LL (%)Plasticity index, PI (%)Cut clay: LL 52, PI 28Group, A, LI = ?GivenLL 52; PL 24wn = 30%CF = 40%RequiredUSCS groupActivityLiquidity index and meaningBlack = given; red = required
Given and required for Question 2.5-1.

Given

VariableValueDescription
LL, PL52 and 24Atterberg limits
wn30%Natural water content
CF40%Finer than 2 μm

Required

  • USCS group
  • Activity
  • Liquidity index and what it suggests

Equations

  1. Eq. 1: PI = LL − PL
  2. Eq. 2.4-1: PIA = 0.73 (LL − 20) — A-line
  3. Eq. 2.5-2: A = PI / CF
  4. Eq. 3: LI = (wn − PL) / PI

Steps

Step 1 · PI and A-line
PI = 28; PIA = 0.73 × 32 = 23.4; PI > PIA; LL ≥ 50
CH
↓
Step 2 · Activity
28 / 40
A = 0.70: inactive to normal
↓
Step 3 · LI
(30 − 24) / 28
LI = 0.21: very stiff
↓
Solution
CH; A = 0.70; LI = 0.21.

Solution

CH (fat clay); activity 0.70; liquidity index 0.21.

A water content this close to the plastic limit suggests the clay is overconsolidated or desiccated. It will be stiff in its present state but can soften if it gets wetter, which matters for cut slopes and subgrades exposed to water (Question 2.5-3).

Question 2.5-2: Design Undrained Strength From a Vane Test

Problem Statement

A Class I railroad embankment over normally consolidated clay is to be raised. Field vane tests gave the strength shown at a depth where the effective stress is known. The engineer must find the design undrained strength for the stability analysis and check it against a SHANSEP estimate.

Field vane tests in plastic clays overestimate the strength that is mobilized in an embankment failure. Bjerrum’s correction reduces the vane value; SHANSEP gives an independent estimate from the effective stress.

EmbankmentNC clay, PI 400510152025303540Depth (ft)su,VST = 600 psf; σ′v0 = 2,500 psfDesign su = ? SHANSEP check?Field vane at the embankment raiseGivenPI = 40su,VST = 600 psfσ′v0 = 2,500 psfOCR = 1.0; S = 0.22RequiredDesign su (Bjerrum)Agreement with SHANSEPBlack = given; red = required
Given and required for Question 2.5-2.

Given

VariableValueDescription
PI40Plasticity index
su,VST600 psfField vane strength
σ′v02,500 psfEffective stress at the test depth
OCR1.0Normally consolidated
S0.22SHANSEP strength ratio

Required

  • Design su, and whether it agrees with SHANSEP

Equations

  1. Eq. 2.5-5: μ = 1.7 − 0.54 log PI — Bjerrum correction (Morris and Williams fit)
  2. Eq. 2.5-4: su = S σ′v0 OCRm — SHANSEP

Steps

Step 1 · Bjerrum μ (Eq. 2.5-5)
1.7 − 0.54 × 1.602
μ = 0.83
↓
Step 2 · Corrected vane strength
0.83 × 600
su = 500 psf
↓
Step 3 · SHANSEP (Eq. 2.5-4)
0.22 × 2,500 × 1.0
su = 550 psf
Spot check: 550 / 500 = 1.10: within 10%.
↓
Solution
Use about 500 psf; SHANSEP gives 550 psf.

Solution

Design su ≈ 500 psf. SHANSEP gives 550 psf, within 10%.

Two independent methods agreeing within 10% is good confirmation. Use the lower, vane-based value for design; the agreement shows the vane results are not disturbed or affected by sand layers.

Question 2.5-3: Which Strength for a Failed Cut in Stiff Fissured Clay?

Problem Statement

A cut in stiff fissured clay on a Class I railroad stood for 40 years and then failed onto the track. The railroad needs a repair design and asks why the original cut failed. The engineer must say which drained strength the original design should have used and which the repair must use.

A reasoning question about the three drained strengths of a stiff clay: peak, fully softened and residual. Each applies to a different stage in the life of a slope.

Stood 40 years, then failedStiff fissured clayLL 75, CF 55%Original design strength = ?Repair strength = ?GivenStiff fissured clay, LL 75, CF 55%Cut stood 40 years, then failedFully softened φ′ 18°–25°Residual φ′ 9°–16° (c′ = 0)RequiredStrength for the original designStrength for the repairBlack = given; red = required
Given and required for Question 2.5-3.

Given

VariableValueDescription
SoilStiff fissured clay; LL = 75, clay fraction 55%High plasticity
HistoryThe cut stood 40 years, then failedDelayed failure
StrengthsFully softened about 18° to 25°; residual about 9° to 16° (c′ = 0)Table 2.5-7

Required

  • Strength the original design should have used
  • Strength the repair should use

Equations

No equation is needed; the answer follows from the criteria listed under Given.

Steps

Step 1 · Why did the slope stand 40 years?
Negative pore pressures and peak strength held it while the fissured clay slowly softened toward its fully softened strength.
↓
Step 2 · Original long-term design
Fully softened strength, because swelling and fissuring destroy the peak strength over decades.
↓
Step 3 · Repair
Residual strength on the existing slip surface, because movement has aligned the clay particles along it.
↓
Solution
Original design: fully softened. Repair: residual.

Solution

The original design should have used the fully softened strength (about 18° to 25°, c′ = 0). The repair must use the residual strength on the existing slip surface (about 9° to 16°).

The 40-year delay is typical of cuts in stiff plastic clay and is the reason peak strengths are not used for permanent cuts. Once a slip surface exists, it does not regain strength, so a repair that assumes the fully softened strength will fail again on the same surface.

← Previous · 2.0 The Underworld Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction
Next · 2.0 The Underworld → Chapter 2.6 — Peats and Organic Soils: Properties, Typical Values and Behavior