Author and Sources

Clay is the soil whose behavior depends most on water and time: it is strong when dry and weak when wet, it consolidates for years under new fill, it swells and shrinks with the seasons, and in cut slopes it slowly loses strength until it slides.
Author: Daniel P. Colwell
Author and Sources

Author: Daniel P. Colwell. This chapter was written and compiled by Daniel P. Colwell for Railway Ground Hazard Risk Management from the published sources below; credit for that material belongs to their authors and publishers. It contains no client- or project-specific data.

Sources

  • Bjerrum, L. (1972). “Embankments on Soft Ground.” Proc. ASCE Specialty Conf. on Performance of Earth and Earth-Supported Structures, Vol. 2Find source ↗
  • Bjerrum, L. and Simons, N. E. (1960). Comparison of shear strength characteristics of normally consolidated clays. Proc. ASCE Research Conf. on Shear Strength of Cohesive SoilsFind source ↗
  • Chen, F. H. (1988). Foundations on Expansive Soils. ElsevierFind source ↗
  • Duncan, J. M. and Buchignani, A. L. (1976). An Engineering Manual for Settlement Studies. University of California, BerkeleyFind source ↗
  • Holtz, R. D., Kovacs, W. D. and Sheahan, T. C. (2011). An Introduction to Geotechnical Engineering, 2nd ed. PearsonFind source ↗
  • Koppula, S. D. (1981). Statistical estimation of compression index. Geotechnical Testing Journal, 4(2)Find source ↗
  • Kulhawy, F. H. and Mayne, P. W. (1990). Manual on Estimating Soil Properties for Foundation Design. EPRI EL-6800Find source ↗
  • Ladd, C. C. (1991). “Stability Evaluation during Staged Construction.” J. Geotech. Eng., 117(4); Ladd, C. C. and Foott, R. (1974). J. Geotech. Eng. Div., 100(GT7)Find source ↗
  • Morris, P. H. and Williams, D. J. (1994). “Effective Stress Vane Shear Strength Correction Factor Correlations.” Canadian Geotechnical Journal, 31(3)Find source ↗
  • Mayne, P. W. (2007). Cone Penetration Testing. NCHRP Synthesis 368, Transportation Research BoardFind source ↗
  • Mesri, G. (1975). Discussion. J. Geotech. Eng. Div., 101(GT4); Mesri, G. and Godlewski, P. M. (1977). J. Geotech. Eng. Div., 103(GT5)Find source ↗
  • Mitchell, J. K. and Soga, K. (2005). Fundamentals of Soil Behavior, 3rd ed. WileyFind source ↗
  • Nelson, J. D. and Miller, D. J. (1992). Expansive Soils: Problems and Practice in Foundation and Pavement Engineering. WileyFind source ↗
  • Seed, H. B., Woodward, R. J. and Lundgren, R. (1962). “Prediction of Swelling Potential for Compacted Clays.” J. Soil Mech. Found. Div., ASCE, 88(SM3)Find source ↗
  • Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. Thomas TelfordFind source ↗Library entry
  • Skempton, A. W. (1953). “The Colloidal Activity of Clays.” Proc. 3rd ICSMFE; (1957) Proc. ICE, 7; (1964) “Long-Term Stability of Clay Slopes.” Géotechnique, 14(2)Find source ↗
  • Stark, T. D. and Eid, H. T. (1994, 1997). J. Geotech. Eng., 120(5); J. Geotech. Geoenviron. Eng., 123(4); Stark, T. D., Choi, H. and McCone, S. (2005). 131(5)Find source ↗
  • Terzaghi, K., Peck, R. B. and Mesri, G. (1996). Soil Mechanics in Engineering Practice, 3rd ed. WileyFind source ↗
  • USACE EM 1110-3-138, Pavement Criteria for Seasonal Frost ConditionsOfficial page ↗
  • ASTM D2435, D4186, D4318, D4327, D4546, D4767, D6467, D7608, D2573, D2487, D2488Official page ↗
  • O'Brien, A. S. (2013). The assessment of old railway embankments – time for a change? In Gallipoli (ed.), Partial Saturation in Compacted Soils, pp. 19–32. ICE PublishingFind source ↗
  • McGinnity, B. T. and Saffari, N. (2012). Earthworks asset management and remedial design. Chapter 71 in Burland, J., Chapman, T., Skinner, H. and Brown, M. (eds) (2012). ICE Manual of Geotechnical Engineering, Volume II: Geotechnical Design, Construction and Verification. ICE Publishing, London, pp. 1067–1086Find source ↗Library entry

Photograph credits

The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.

  1. Photo 2.5.7-1 — Placement of geosynthetic reinforcement for a column-supported embankment. From FHWA (2004). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  2. Photo 2.5.7-2 — Placement of select fill for a column-supported embankment. From FHWA (2004). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  3. Photo 2.5.7-3 — Fill placement to tension the geosynthetic. From the files of Joel Sloan. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  4. Photo 2.5.7-4 — Placement and compaction of fill for a column-supported embankment. From the files of Joel Sloan. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  5. Photo 2.5.7-5 — Column-supported T-Wall installation. From FHWA (2004). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  6. Photo 2.5.7-6 — Completed T-Wall column-supported embankment for the Rancocas Bridge approach. From FHWA (2004). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  7. Photo 2.5.7-7 — Geosynthetic placement for a column-supported embankment. From the files of Jim Collin. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  8. Photo 2.5.7-8 — Geosynthetic placement with alternate roll direction from the previous layer. From the files of Jim Collin. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  9. Photo 2.5.7-9 — Base layer of geosynthetic reinforcement for a column-supported embankment. From the files of Jim Collin. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  10. Photo 2.5.8-1 — Cross section of partial encapsulation on Interstate 37 in Texas. Figure courtesy of Wyoming Department of Transportation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  11. Photo 2.5.8-2 — Moisture barrier installation. Wyoming DOT. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  12. Photo 2.5.7.2-1 — Embankment on Weak Foundation (after Bonaparte and Christopher 1987). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  13. Photo 2.5.7.2-2 — Reinforced embankment failure modes (Holtz et al. 2008). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  14. Photo 2.5.7.2-3 — Reinforcement required to provide rotational stability (a) after Christopher and Holtz (1985) after Wager (1981); (b) after Bonaparte and Christopher (1987) for the case in which the reinforcement does not increase soil strength (Holtz et al. 2008). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  15. Photo 2.5.7.2-4 — Reinforcement required to limit lateral embankment spreading (a) embankment sliding on reinforcement; (b) rupture of reinforcement and embankment sliding on foundation soil (from Bonaparte, R., and B. Reproduced with permission of the Transportation Research Board). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  16. Photo 2.5.7.2-5 — Placing geosynthetic reinforcement prior to filling. From the files of Ryan Berg. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  17. Photo 2.5.7.2-6 — Placing granular material over geosynthetic reinforcement. From the files of Ryan Berg. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
← Previous · 2.0 The Underworld Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction
Next · 2.0 The Underworld → Chapter 2.6 — Peats and Organic Soils: Properties, Typical Values and Behavior