Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it
2.5.18 Old End-Dumped Clay-Fill Embankments: Fabric, Seasonal Movement and Delayed Failure
Clay is the soil whose behavior depends most on water and time: it is strong when dry and weak when wet, it consolidates for years under new fill, it swells and shrinks with the seasons, and in cut slopes it slowly loses strength until it slides.
2.5.18 Old End-Dumped Clay-Fill Embankments: Fabric, Seasonal Movement and Delayed Failure
Many clay embankments on older main lines were built by tipping clay from wagons onto the natural ground with no systematic compaction. The fill was unsaturated when placed, so it settled heavily when rain soaked it, and the settlement was made up over decades with locomotive ash and ballast. These “dumped” fills behave differently from both the parent clay and a modern compacted fill (O'Brien, 2013, pp. 19–21).
Fabric and hidden defects
Clod–matrix structure. Intact lumps of the parent clay sit in a softer matrix, with open voids between them. The structure raises the mass permeability well above that of the parent clay but has little effect on the fill's drained strength, which is close to that of the reconstituted clay.
Hidden defects. Old shear surfaces from earlier slips that were only partly repaired, sand or silt lenses that carry water, and topsoil or alluvium left at the base because the ground was not prepared before tipping.
Shape. Some embankments keep a uniform steep slope; others have a “coat-hanger” profile, with an oversteepened upper slope and a flatter lower slope with toe bulges, the mark of slow outward movement.
Geometry. On the UK network most clay embankments are about 6.5 to 26 ft (2 to 8 m) high with side slopes of 22° to 30°, steeper than the critical-state friction angle of high-plasticity clay (typically 20° to 25°).
Table 2.5-16. Index properties of dumped clay fills at three monitored UK railway embankments
Fill
Moisture content (%)
Liquid limit (%)
Plasticity index (%)
Clay fraction (%)
Sand and gravel (%)
Gault Clay fill
24.9 (SD 3.3)
57.4 (SD 10.9)
34.1 (SD 9.1)
30–60
5–40
London Clay fill
25.1 (SD 5.0)
53.8 (SD 12.5)
33.0 (SD 9.7)
25–50
10–40
London Clay fill, six metro sites
26.5–35.8
67.7–74.4
42.7–49.4
50–70
0–15
After O'Brien (2013), Table 2, p. 22. SD = standard deviation. Published research data; no client sites are identified.
Seasonal movement and vegetation
Monitoring of instrumented embankments shows that climate and vegetation, not train loading, drive most of the movement of high-plasticity clay fill:
At two areas of the same embankment less than about 330 ft (100 m) apart, built of the same clay (PI about 45 to 50), crest movement under oaks and poplars was more than ten times that under grass. Under the trees the crest settled as the soil moisture deficit rose in summer and heaved as it fell in winter, and the track followed the crest (O'Brien, 2013, p. 21).
Inclinometers in a Gault Clay fill showed the largest movement at the slope surface, little below about 13 ft (4 m), and a seasonal cycle: outward from February to July and back from August to November, with a net outward drift of about 0.4 to 0.6 in. (10 to 15 mm) a year. Outward movement coincided with a soil moisture deficit below about 0.4 in. (10 mm), and movement tracked soil moisture deficit better than rainfall (O'Brien, 2013, pp. 21–22).
Where large oaks were removed from a London Clay fill, the crest first settled, then swelled steadily to a depth of about 13 ft (4 m), and the slope moved outward in the following winter within its upper 6.5 ft (2 m): the fill wetting up once the trees stopped drying it (O'Brien, 2013, p. 22).
From seasonal movement to delayed failure
Each wet season pushes the slope out further than the dry season pulls it back. This “ratcheting” accumulates plastic strain near the toe, the clay there softens past its peak strength, and a slip surface grows back toward the crest. Numerical models of these fills reproduce the coat-hanger shape and the delayed, deep failure through the crest (O'Brien, 2013, pp. 25–28; McGinnity and Saffari, 2012, p. 1071). In the models the clay was given peak strength until about 0.2 in. (5 mm) of plastic displacement, post-rupture strength after that, and residual strength after about 4 in. (100 mm) (O'Brien, 2013, p. 30). Fills with permeability in an intermediate range let enough winter rain in to raise pore pressure and are the most prone to delayed failure (Chapter 6.4, Section 6.4.12).
The two mechanisms pull against each other. Large trees on the slope keep it dry and suppress delayed failure but cause the summer track movement; clearing them stops the track movement but can let the fill wet up and start a winter failure. Vegetation management on a clay embankment is therefore a stability decision, not only a maintenance one.
Example 2.5-4: Screening an old clay embankment for its likely failure mode
A 16-ft clay embankment on an older main line has a 1.5H:1V side slope with mature oaks on the lower half and grass above. Track geometry records show a dip that deepens every August and recovers partly each spring. The fill is a brown clay with LL = 58 and PI = 34; there is no record of compaction.
Given and required for Example 2.5-4.
Given
Variable
Value
Description
H
16 ft
Embankment height
β
33.7° (1.5H:1V)
Side slope angle
LL, PI
58, 34
Index properties of the fill
Vegetation
Oaks on lower half, grass above
High-water-demand trees on the slope
Track record
Dip deepens each August
Seasonal geometry defect
Required
The likely controlling mechanism
Whether a steady-state, saturated stability analysis answers the problem
The first investigation and monitoring steps
Equations
Table 2.5-16: compare LL and PI with the published dumped fills
Table 1.2 (Section IV): mechanism versus trigger and season
Steps
Step 1 · Fill type
Uses: Table 2.5-16
LL 58, PI 34 against Gault and London Clay fills (LL 54–57, PI 33–34)
Intermediate-to-high plasticity dumped clay fill
Spot check: An uncompacted fill of this plasticity is the type the UK studies describe.
↓
Step 2 · Mechanism
Uses: Section IV, failure mechanism table
Summer track dip + trees on the slope
Seasonal shrink–swell (serviceability) with possible ratcheting
Spot check: Delayed deep failures are usually on grassed slopes; tree-covered slopes usually show track movement first.
↓
Step 3 · Analysis choice
Slope 33.7° is steeper than a likely critical-state φ′ of 20° to 25°
A saturated steady-state analysis would show FS < 1 yet the slope stands: suction and seasonal pore pressure control
Spot check: Use Section 6.4.12 and the unsaturated-slope calculator for the seasonal case.
↓
Step 4 · Next steps
Inclinometer at mid-slope and crest; suction or pore pressure sensors at 3 and 6 ft; monthly readings through one full year
Monitoring before any tree removal
↓
Solution
Seasonal shrink–swell of a dumped clay fill, driven by the oaks; monitor through a full year before clearing.
Solution
The fill and the August dip match the pattern in the UK monitoring: summer drying by high-water-demand trees settles the crest and the track follows it. A conventional analysis with a hydrostatic water table would call a 33.7° slope in this clay unstable, so it cannot explain the observed behaviour and should not drive the decision.
Do not clear the oaks as a first step. Removing them stops the summer drying but can wet the fill and start outward movement or a delayed failure the following winter. Install inclinometers and pore pressure or suction sensors, read them through at least one dry and one wet season, and plan any clearance in stages with monitoring (Chapter 5.3).
Sources
Paraphrased from the published sources below; values are converted to English units. Individual railroads, clients and projects are not named.
O'Brien, A. S. (2013). The assessment of old railway embankments – time for a change? In Gallipoli (ed.), Partial Saturation in Compacted Soils, pp. 19–32. ICE PublishingFind source ↗
McGinnity, B. T. and Saffari, N. (2012). Earthworks asset management and remedial design. Chapter 71 in Burland, J., Chapman, T., Skinner, H. and Brown, M. (eds) (2012). ICE Manual of Geotechnical Engineering, Volume II: Geotechnical Design, Construction and Verification. ICE Publishing, London, pp. 1067–1086Find source ↗Library entry