Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.
Primary sources
- Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure ManagementFind source ↗Library entry
- Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway GeotechnicsFind source ↗
- AREMA Manual for Railway Engineering (MRE), Chapter 1 — Roadway and BallastFind source ↗
- ASTM C29, C88, C127, C535, D1883, D4694 (ballast, subballast and subgrade tests)Official page ↗
Supplemental references
- Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press / Taylor & FrancisFind source ↗
- Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0)Find source ↗
- McHenry, M. and Rose, J. (2012). Railroad Subgrade Performance Indicators — A Review of Available Testing Methods. University of KentuckyFind source ↗Library entry
- Herbert, D. and Gee, B. (2021). “Durability and Performance of Geogrid-Stabilized Ballast and Sub-ballast Track Section in Mobile, Alabama.” AREMA 2021 Annual ConferenceFind source ↗
- Leng, Z. and Al-Qadi, I. L. “Railroad Ballast Evaluation Using Ground-Penetrating Radar: Laboratory Investigation and Field Validation.” Transportation Research RecordFind source ↗
- Coleman, D. M. (1990). Use of Geogrids in Railroad Track: A Literature Review and Synopsis. U.S. Army Engineer Waterways Experiment Station, Misc. Paper GL-90Find source ↗
- Getzner Werkstoffe. Sub-Ballast Mats (product technical brochure)Find source ↗Library entry
- Martland, C. D. (2013). “Introduction of Heavy Axle Loads by the North American Rail Industry.” Journal of the Transportation Research Forum 52(2): 103–125Find source ↗
- Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case studies §14.13, §14.15Find source ↗Library entry
File locations for these documents are listed under Supplemental References.
Project management sources
- Seeley, I. H. (1993). Civil Engineering Quantities, 5th ed. Basingstoke: The Macmillan PressFind source ↗
- American Society of Civil Engineers (2012). Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors, 3rd ed. ASCE Manuals and Reports on Engineering Practice No. 73. Reston, VA: ASCEFind source ↗
- Kelly, J., Male, S. and Graham, D. (2004). Value Management of Construction Projects. Oxford: Blackwell ScienceFind source ↗
- Jacob, D. and Müller, C. (Eds.) (2017). Estimating in Heavy Construction: Roads, Bridges, Tunnels, Foundations. Berlin: Ernst & SohnFind source ↗
- Pratt, D. J. (2011). Fundamentals of Construction Estimating, 3rd ed. Clifton Park, NY: Delmar Cengage LearningFind source ↗