Investigation Phase
- [ ] Confirm design train loading (Cooper E-80, GRL, DLF) with client project engineer
- [ ] Obtain existing as-built track structure details (ballast depth, tie type, subballast)
- [ ] Request GPR survey data (available from client or commission new survey)
- [ ] Plan borings at GPR anomaly stations and at representative clean locations
- [ ] Collect ballast samples for gradation and fouling index (sample at tie base level)
- [ ] Perform field vane shear tests or collect undisturbed subgrade samples for s_u
- [ ] Perform CBR tests on subgrade (field or lab per ASTM D1883)
- [ ] Measure groundwater depth; install piezometers at soft subgrade stations
- [ ] Assess frost susceptibility of subgrade (USACE FS classification; Chapter 1.3)
- [ ] Obtain historical geometry car data from client (geometry deviation trends)
Analysis and Design Phase
- [ ] Calculate σ_s for existing and proposed track section at each boring location
- [ ] Compute FS_shear at each station; flag stations with FS < 3.0
- [ ] Compute Fouling Index at each ballast sample location
- [ ] Design subballast filter (Terzaghi criteria, AREMA Ch. 1)
- [ ] Design blanket layer thickness (for CBR < 5 or frost-susceptible subgrade)
- [ ] Compute frost penetration depth (modified Berggren) for projects in seasonal-frost regions
- [ ] Design edge drain system (pipe size, outlet spacing, geotextile filter)
- [ ] Check track modulus adequacy (u ≥ client minimum)
Deliverable Phase
- [ ] Produce along-alignment subgrade characterization table (USCS, s_u, CBR, FI, σ_s, FS)
- [ ] Flag high-priority rehabilitation stations clearly on plan and profile
- [ ] Include ballast sampling data table with FI values and classification
- [ ] Include GPR interpretation map (color-coded fouling zones referenced to station)
- [ ] Include proposed track section diagram with layer thicknesses and materials
- [ ] Include GSP language for blanket layer construction, compaction, and testing
- [ ] PE seal calculations (commonly required)