↑ Parent Menu⌂ Main Menu
← Chapter 2.3 Track Substructure: Ballast, Subballast and Subgrade
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.3.11 Worked Calculation Examples

Formerly Geo Rail Chapter 6.3 — Railroad Track Subgrade: Special Topics

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests.
Authors: Daniel P. Colwell and Mario Ruel
2.3.11 Worked Calculation Examples
The three examples cover the three questions most often asked of a track section: is the subgrade overstressed, how fouled is the ballast, and will frost reach the subgrade. Each is laid out as Given, Required, Equations, a flow chart of the steps with a spot check at each, and the Solution with what it means for the track.
Example 2.3-1: Stress at the Top of Subgrade Under a Heavy-Haul Main Line

A main line on a Class I railroad located in the Powder River Basin of Wyoming carries unit coal trains at 286,000-lb gross rail load. The client asks whether the subgrade is adequate for the existing section. The method spreads the wheel load through the ballast and subballast to the subgrade and compares the stress there with what the subgrade can carry under repeated loading.

Clay subgrade, su = 350 psfballastsubballastPw = 40,000 lb, DLF 1.4Lt = 8.5 ft, Bt = 11 in.θ = 35°d = 2.0 ftσ at subgrade = ?d needed = ?GivenCooper E-80 wheel 40,000 lbDLF = 1.4Ballast 18 in. + subballast 6 in.Concrete tie 11 in. × 8.5 ftθ = 35°su = 350 psf; FS = 3.0RequiredDynamic load, σ at subgradeAllowable stress; adequate?Granular thickness if notBlack = given; red = required
Given and required for Example 2.3-1.

Given

VariableValueDescription
Pw40,000 lbCooper E-80 wheel load
DLF1.4Dynamic load factor (assumed for heavy tonnage)
db, dsb18 in. and 6 in.; d = 2.0 ftBallast and subballast thickness
Bt0.917 ft (11 in.)Concrete tie width
Lt8.5 ftTie length
θ35° (tanθ = 0.700)Load spread angle through the granular layers
su350 psfSubgrade undrained strength, average of five vane tests
FS3.0Factor of safety for cyclic loading

Required

  • Dynamic wheel load and stress at the top of subgrade
  • Allowable subgrade stress and whether the subgrade is adequate
  • The granular thickness needed if it is not

Equations

  1. Eq. 1: Pd = Pw × DLF — dynamic wheel load
  2. Eq. 2: Aeff = (Bt + 2d tanθ)(Lt + 2d tanθ) — area at the top of subgrade (Section 2.3.2)
  3. Eq. 3: σs = P / Aeff — average vertical stress at the top of subgrade
  4. Eq. 4: σallow = (π + 2) su / FS — allowable stress from undrained bearing capacity
  5. Eq. 5: Solve (0.917 + 1.4d)(8.5 + 1.4d) = Pw / σallow for d — required total granular thickness

Steps

Step 1 · Dynamic wheel load Pd (Eq. 1)
40,000 × 1.4
Pd = 56,000 lb
↓
Step 2 · Effective area Aeff (Eq. 2)
Uses: Bt, Lt, d, tanθ
2d tanθ = 2 × 2.0 × 0.700 = 2.80 ft
(0.917 + 2.80)(8.5 + 2.80) = 3.717 × 11.30
Aeff = 42.0 ft²
Spot check: The load spreads 1.4 ft on each side of the tie, so the area grows from 7.8 to 42 ft².
↓
Step 3 · Stress at the top of subgrade (Eq. 3)
Uses: Pd, Pw, Aeff
Dynamic: 56,000 / 42.0; static: 40,000 / 42.0
σs = 1,333 psf dynamic; 952 psf static
↓
Step 4 · Allowable stress (Eq. 4)
Uses: su, FS
5.14 × 350 / 3.0
σallow = 600 psf
Spot check: 5.14 × 350 = 1,799; 1,799 / 3 = 600.
↓
Step 5 · Adequacy
σallow / σs,static = 600 / 952
Ratio 0.63 < 1.0: overstressed even under static load
↓
Step 6 · Required thickness d (Eq. 5)
A needed = 40,000 / 600 = 66.8 ft²; (0.917 + 1.4d)(8.5 + 1.4d) = 66.8
d = 3.1 ft (37 in.)
Spot check: Check the recommended 38 in. (3.17 ft): A = 5.35 × 12.93 = 69.2 ft²; 40,000 / 69.2 = 578 psf < 600 psf.
↓
Solution
Subgrade overstressed (ratio 0.63); about 37 in. of granular material is needed.

Solution

The subgrade is overstressed: 952 psf static against 600 psf allowable, a ratio of 0.63. About 3.1 ft (37 in.) of ballast, subballast and blanket is needed.

A common section of 12 in. of ballast over 8 in. of subballast (20 in.) is far short. One solution is 24 in. of ballast over a 14-in. granular blanket (38 in. total), which brings the static stress to 578 psf. Where that much section is impractical, improving the subgrade itself, for example by wick drains and preloading (Chapter 7.2), is the alternative. The example compares the allowable stress with the static load because the factor of safety of 3 already allows for repeated loading; using the dynamic stress as well would count the dynamic effect twice.

Example 2.3-2: Ballast Fouling Assessment Along a Segment

A main line segment on a Class I railroad located in Georgia was reported for track geometry deviations. Ballast was sampled at 500-ft intervals over two miles. A single sample says how fouled the ballast is at one point; the pattern along the line says where to clean, where to undercut and where to look deeper.

0102030P4 (No. 4)14.2%P200 (No. 200)3.8%Percent passing (crib sample)FI = P4 + P200 = ? Class = ? Length to clean = ?Six stations at 0.3-mile spacingGivenP4 = 14.2%, P200 = 3.8%Six stations, 0.3 mile apartClasses (Table 2.3-5):moderately fouled 10–20,fouled 20–40, highly fouled ≥ 40RequiredFouling Index and classExtent needing cleaningor undercuttingBlack = given; red = required
Given and required for Example 2.3-2.

Given

VariableValueDescription
P414.2%Percent passing the No. 4 sieve, representative sample
P2003.8%Percent passing the No. 200 sieve, same sample
SamplesSix stations at 0.3-mile spacing (table in Step 3)Along-alignment results
ClassesTable 2.3-5Clean, moderately clean, moderately fouled (10 to 20), fouled (20 to 40), highly fouled (40 or more)

Required

  • Fouling Index and class for the representative sample
  • The extent of ballast needing cleaning or undercutting

Equations

  1. Eq. 1 (Selig): FI = P4 + P200 — Fouling Index

Steps

Step 1 · FI of the representative sample (Eq. 1)
14.2 + 3.8
FI = 18.0: moderately fouled, approaching the cleaning threshold of 20
↓
Step 2 · FI at every station
9.7, 18.0, 27.8, 40.6, 23.0, 13.7 (stations 1 to 6)
Moderately clean, moderately fouled, fouled, highly fouled, fouled, moderately fouled
Spot check: Station 4: 31.4 + 9.2 = 40.6; station 3: 22.1 + 5.7 = 27.8.
↓
Step 3 · Extent above the threshold
Stations 3 to 5 have FI ≥ 20
0.6 mile needs cleaning or undercutting; station 4 (FI 40.6) needs a subgrade investigation
↓
Solution
Representative FI = 18.0; 0.6 mile fouled, peaking at FI 40.6.

Solution

The representative sample has FI = 18.0, moderately fouled. Three consecutive stations are fouled or highly fouled, a 0.6-mile reach that needs ballast cleaning or undercutting.

The peak at station 4 is highly fouled and is the place to look for a ballast pocket or pumping subgrade; three borings there would tell whether undercutting alone is enough. Fouling that rises to a peak and falls again usually has a local source, such as a pumping subgrade or a drainage low point, rather than ballast wear, which is more uniform. At highly fouled locations track modulus often falls below 2,000 psi (Table 2.3-23); confirm it with a deflection measurement before designing the repair.

Example 2.3-3: Frost Blanket for a Frost-Susceptible Subgrade

A main line on a Class I railroad located on the Manitoba prairie crosses lacustrine clay and till, and track geometry defects appear every spring. The aim is to keep the freezing front out of the frost-susceptible subgrade. The example uses a simplified form of the modified Berggren equation; a full design uses the method of Chapter 7.3.

Frost-susceptible till (F3)12 in. ballast + 6 in. subballast = 1.5 ft2 in. XPS insulation (option)32°F isotherm depth = ?Blanket needed = ?FIair = 2,800 °F·daysGivenFI = 2,800 °F·daysExisting NFS cover 1.5 ftSubgrade: F3 tillλ = 0.5 (granular fill)2 in. XPS ≈ 2.5 ft fill (option)Keep 32°F above subgradeRequiredFrost penetration depthBlanket thickness, with andwithout insulationBlack = given; red = required
Given and required for Example 2.3-3.

Given

VariableValueDescription
FIair2,800 °F·daysDesign freezing index (assumed from climate data)
Existing section12 in. ballast + 6 in. subballast = 1.5 ftNon-frost-susceptible cover over the subgrade
SubgradeFrost-susceptible till, group F3Chapter 7.3
λ1.50 in./(°F·day)0.5Assumed coefficient for granular fill; check against Chapter 7.3
Insulation2 in. XPS, equivalent to about 2.5 ft of granular fill (assumed)Optional
CriterionThe 32°F isotherm stays above the top of the subgradeDesign requirement (assumed)

Required

  • Frost penetration depth
  • Blanket thickness needed, with and without insulation

Equations

  1. Eq. 1: X = λ √FI — simplified frost penetration
  2. Eq. 2: dblanket = X − existing cover − insulation equivalent — additional non-frost-susceptible thickness

Steps

Step 1 · Frost penetration X (Eq. 1)
1.50 × √2,800 = 1.50 × 52.9
X = 79.4 in. = 6.6 ft
Spot check: 52.9² = 2,798.
↓
Step 2 · Blanket without insulation (Eq. 2)
6.6 − 1.5
5.1 ft of additional blanket: impractical
↓
Step 3 · Blanket with 2 in. of XPS (Eq. 2)
6.6 − 1.5 − 2.5
2.6 ft (31 in.) of granular blanket
Spot check: 1.5 + 2.5 + 2.6 = 6.6 ft, the full penetration depth.
↓
Solution
31 in. of non-frost-susceptible blanket over 2 in. of XPS insulation.

Solution

Frost penetrates about 6.6 ft. Provide 31 in. of non-frost-susceptible (NFS or F1) granular blanket over 2 in. of XPS insulation board, below the existing subballast.

Without insulation the blanket would have to be over 5 ft thick, which is rarely possible under an operating track. Insulation trades thickness for cost and for a stiffness discontinuity at its ends, which needs tapering. The stress at the top of subgrade must still be checked with the new section (Example 2.3-1). Frost blanket designs are normally submitted under a professional engineer’s seal.

← Previous · 2.0 The Underworld Chapter 2.2 — Soil and Rock Classification
Next · 2.0 The Underworld → Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction