↑ Parent Menu⌂ Main Menu
← Chapter 2.3 Track Substructure: Ballast, Subballast and Subgrade
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.3.2 Load Distribution — Talbot Method

Formerly Geo Rail Chapter 6.3 — Railroad Track Subgrade: Special Topics

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests.
Authors: Daniel P. Colwell and Mario Ruel
2.3.2 Load Distribution — Talbot Method

The Talbot (1920) equation estimates the vertical pressure at depth h below the tie from the average tie–ballast contact pressure p_a:

p_c = 16.8 p_a / h^1.25 (psi; h in inches below the tie base) [AREMA MRE Ch. 1, Part 2, Section 2.11.2.3]

For quick checks, this chapter also uses a simple load-spread approximation that treats the ballast and subballast as one bearing layer (Section 2.3.2.1). Section 2.3.2.3 applies the full Talbot method.

2.3.2.1 Stress at Top of Subgrade

The vertical stress at the top of subgrade beneath a single tie is estimated with a load-spread approximation:

σ_s = (P_d) / (A_eff) (psf)

where:

P_d = P_w × DLF (lb, dynamic wheel load)

A_eff = (B_t + 2 × d × tan θ) × (L_t + 2 × d × tan θ) (ft²)

  • P_w = static wheel load (lb); for Cooper E-80: P_w = 80,000 lb per axle = 40,000 lb per wheel (per AREMA Ch. 8)
  • DLF = dynamic load factor (1.2 to 1.5 by client; see Introduction)
  • B_t = tie base width ≈ 0.917 ft (11 in.) for concrete ties, 0.75 ft (9 in.) for timber
  • L_t = tie length = 8.5 ft
  • d = combined ballast + subballast thickness (ft)
  • θ = pressure distribution angle, assumed 35° in this chapter (not an AREMA value); tan(35°) = 0.700
Figure 2.3-12. Distribution of a wheel load over successive ties: 7%, 23%, 40%, 23%, 7%. Profillidis Fig. 8.10.
Figure 2.3-12. Distribution of a wheel load over successive ties: 7%, 23%, 40%, 23%, 7%. Profillidis Fig. 8.10.

For a single dynamic wheel load P_d = 40,000 × 1.3 = 52,000 lb, an 11-in. concrete tie and d = 2.0 ft (12 in. ballast + 12 in. subballast):

A_eff = (0.917 + 2 × 2.0 × 0.700) × (8.5 + 2 × 2.0 × 0.700)

= (0.917 + 2.80) × (8.5 + 2.80)

= 3.717 × 11.30 = 42.0 ft²

σ_s = 52,000 / 42.0 = 1,238 psf = 0.62 tsf

This is the design stress at the top of subgrade used for bearing capacity checks and to assess subgrade failure potential.

Which design variables actually move the stresses

Selig and Waters ran a multilayer model study (GEOTRACK, 32,900-lb wheel) to see which design choices change rail seat load, ballast pressure and subgrade stress most. Use it to decide where design effort pays.

Table 2-SW1. Sensitivity of track response to design variables (multilayer model)
ChangeEffect
Tie spacing 10 → 36 in.Rail seat load ×3; stress at ballast surface ×4; subgrade stress +50%
Rail moment of inertia 38.7 → 150 in.4Rail seat load −40%
Ballast depth 24 → 6 in.Subgrade stress more than doubles: the strongest lever on subgrade stress
Ballast modulus 100,000 → 8,000 psiBallast strain ×9
Tie stiffnessStiff ties act as rigid footings and push peak ballast pressure to the tie ends; flexible ties peak under the rail seat. Subgrade stress is similar either way.

Rail seat load is shared about 36% by the tie under the wheel, 22% by each adjacent tie and 10% by the next.

Quick hand checks.

  • Maximum rail seat load ≈ maximum rail support force per unit length × tie spacing.
  • Average pressure at the tie base ≈ 2 × rail seat load ÷ tie bearing area.

Measured values for comparison. At FAST, wheel loads of 14,000 to 32,900 lb gave the following:

  • Subgrade stress under concrete ties: 6.8–10.1 psi.
  • Subgrade stress under wood ties: 3.8–5.7 psi.
  • Resilient subgrade deflection: 0.025–0.033 in.

Ballast type (limestone, traprock or granite) had no detectable effect on the resilient response. These values are consistent with the roughly 10-psi subgrade stress in Table 2.3-1, which makes them a useful reasonableness check.

After Selig & Waters (1994), ch. 5. Full reference under Supplemental References.

Inputs for the equations in this section (9)
SymbolWhat it isComes fromHow to get itTypical range
σsintermediate value computed on this pageAnother equationComputed: σ_s = ( P_d ) / ( A_eff ) (psf)project-specific
Pdintermediate value computed on this pageAnother equationComputed: P_d = P_w × DLF (lb, dynamic wheel load)project-specific
Aeffintermediate value computed on this pageAnother equationComputed: A_eff = ( B_t + 2 × d × tan θ) × ( L_t + 2 × d × tan θ) (ft²)project-specific
Pwstatic wheel load (lb)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
DLFdynamic load factor (1.2 to 1.5 by clientChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Bttie width = 0.667 ft (8 in.) for concrete ties, 0.583 ft (7 in.) for timberProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Lttie length = 8.5 ftProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
dcombined ballast + subballast thickness (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
θpressure distribution angle = 35° (AREMA ChChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
2.3.2.2 Stress at Subgrade — Simplified Table
Table 2.3-1. Approximate σ_s at Top of Subgrade by the load-spread method of Section 2.3.2.1 (Cooper E-80 wheel, DLF = 1.3, 11-in. concrete tie, θ = 35°)
Ballast + Subballast Thickness (in.)σ_s (psf)σ_s (tsf)
181,6260.81
241,2380.62
309810.49
368000.40
426670.33
485660.28

Subgrade bearing capacity is checked against σ_s. For soft fine-grained subgrades (CBR < 4), ballast and subballast thickness ≥ 36 in. is typically required to reduce stress to manageable levels.

AREMA subgrade-pressure equations and allowable pressure by soil type

AREMA allows several equations for stress at the top of subgrade:

  • Talbot: Pc = 16.8 Pm / h1.25 (h in inches). It is empirical and was calibrated on lighter loads.
  • Japanese National Railways: Pc = 50 Pm / (10 + h1.35) (h in cm).
  • Boussinesq.
  • Love’s circular-area solution.

Here Pm = 2 × rail seat load × impact factor ÷ effective tie bearing area. The effective area and the limit on Pm depend on tie type:

  • Wood ties: about two-thirds of the tie bearing area; Pm ≤ 65 psi.
  • Concrete ties: the full bearing area; Pm ≤ 85 psi.

The traditional universal subgrade limit of 20 psi is too high for soft soils and too conservative for strong ones. Table 2-SW2 gives soil-specific values.

Table 2-SW2. Allowable subgrade pressure by soil type (0.6 × NAVFAC static allowable)
Subgradepsi
Compact till or hardpan65–100
Gravel, very compact / loose55–85 / 25–50
Coarse-to-medium sand, very compact / loose30–50 / 15–25
Fine sand, loose8–15
Clay, very stiff to hard25–50
Clay, medium to stiff8–25
Clay, soft4–8
Silt, very stiff / soft15–30 / 4–8

These values come from static bearing practice and may still be unconservative under millions of load repetitions. For soft or wet fine-grained subgrade, check the granular depth with the threshold-stress approach in Section 2.3.4.2.

After Selig & Waters (1994), ch. 10. Full reference under Supplemental References.

Load sharing between ties, dynamic increment and subgrade stress (finite-element results)

The classical assumption is that the tie under a wheel carries 50% of the wheel load and each neighbor 25%. Stress measurements and finite-element analysis give a different split: 40% on the tie under the load, 23% on each adjacent tie and 7% on each second tie, with negligible effect beyond.

Track and wheel defects add a dynamic load, so analysis should use Qtot = Qstat + Qdyn, where Qdyn can reach 50% of the static wheel load. For a 11-ton wheel at 124 mph the measured increment was 4.4–6.6 tons. The book separates three frequency bands: 0.5–15 Hz (sprung mass, rolling-stock dependent), 20–100 Hz (unsprung mass, governed by track quality and stiffness) and 100–2,000 Hz (rail corrugation). Empirical dynamic impact factors close to measured values range from 1.35 to 1.6 at 125 mph, and 1.5 is suggested near that speed. Compare these with the AREMA impact allowance used in this section, which remains the design basis.

Figure 2.3-13. Track defect producing an additional dynamic load Qdyn on top of the static load Qstat. Profillidis Fig. 8.14.
Figure 2.3-13. Track defect producing an additional dynamic load Qdyn on top of the static load Qstat. Profillidis Fig. 8.14.
Figure 2.3-15. Dynamic impact factor η vs. speed according to various theories and measurements. Profillidis Fig. 8.15.
Figure 2.3-15. Dynamic impact factor η vs. speed according to various theories and measurements. Profillidis Fig. 8.15.

Elastoplastic finite-element runs (Figure 2.3-14) show that stress at the top of subgrade depends mainly on subgrade quality and only secondarily on track-bed thickness. With all else equal, moving the subgrade up one class (S1→S2, S2→S3, S3→rock) increases the stress developed in the subgrade by about 50%: a stiffer subgrade attracts more load, but carries it with far less settlement.

Figure 2.3-14. Vertical stress at the subgrade level vs. track-bed thickness e (ballast + subballast) for subgrade classes S1–S3 and rock, by tie type. Profillidis Fig. 8.7.
Figure 2.3-14. Vertical stress at the subgrade level vs. track-bed thickness e (ballast + subballast) for subgrade classes S1–S3 and rock, by tie type. Profillidis Fig. 8.7.

After Profillidis (2014), §7.11.2, §8.4.7–8.4.8, §8.6–8.7, Figs. 8.7, 8.10, 8.14, 8.15. Full reference under Supplemental References.

How the track spreads a wheel load, and why no component can be designed alone

The track is a load-spreading system. It takes a concentrated wheel load at the rail head and spreads it along the track, across it and down through the section until the subgrade can carry it. Track that is well designed, built and maintained shares the load evenly, so each component carries its part. The designer’s job, on new track or on an upgrade of existing track, is to select a section that carries the design wheel load without overstressing any of the four main components: rail, ties, ballast and subgrade.

Along the track. When a wheel sits directly over a tie, that tie carries less than half of the wheel load. The rest goes to the two ties on each side (Figure 2-S5). For a 30,000-lb wheel on good track the UFC example split is 40% / 20% / 10%. That is close to the 40 / 23 / 7 finite-element split given above.

Example load sharing along the track: a 30,000-lb wheel centered over tie 3. UFC 4-860-01FA Fig. 3.1-10.
Figure 2-S5. Example load sharing along the track: a 30,000-lb wheel centered over tie 3. UFC 4-860-01FA Fig. 3.1-10.

Down through the section. Pressure at the wheel–rail contact, about 60,000 psi over roughly ½ sq in., falls to about 300 psi on the tie plate, about 40 psi at the base of the tie and about 10 psi (1,440 psf) at the top of subgrade (Figure 2-S6). That is the same order as the Table 2.3-1 values for 18 to 24 in. of ballast and subballast, so it is a quick reasonableness check on a Talbot calculation. Actual pressures vary with wheel load, track section and track condition.

Track Design Calculations
Track Design Calculations
Example vertical pressure reduction from rail head to subgrade under a 30,000-lb wheel. UFC 4-860-01FA Fig. 3.1-11.
Figure 2-S6. Example vertical pressure reduction from rail head to subgrade under a 30,000-lb wheel. UFC 4-860-01FA Fig. 3.1-11.

Design point. Track is simple to build, but its behavior under load is not. Strengthening one component can increase the load on another. When a rehabilitation changes one component (rail section, tie type or spacing, ballast depth), recheck the others, including the stress at top of subgrade in Section 2.3.2.1.

After UFC 4-860-01FA (2004), ch. 6, §5, Figs. 3.1-10 and 3.1-11. Comparison with Section 2.3.2 and Table 2.3-1 added by the authors. Full reference under Supplemental References.

Selecting the design wheel load from the car mix

Set the design wheel load from the heaviest loaded car that commonly runs over the track, not the rare heaviest movement. A locomotive usually puts down the heaviest single wheel. On most track, though, loaded-car wheels far outnumber locomotive wheels, so the car wheel load governs in most cases. Check both before the design is final.

The design wheel load is the static wheel load of that car plus an allowance for speed and for track and wheel irregularities. Table 2-S8 gives planning values for slow-speed track:

  • 10–25 mph: connecting track between the site and the serving railroad.
  • ≤ 10 mph: yard, industry-lead and terminal track.
  • Light use: track used mainly by a switch engine, for empty-car storage or only occasionally.
Table 2-S8. Planning design wheel loads by car type and track use (lb per wheel)
Most common heavy car10–25 mph≤ 10 mphLight use
Box, 40T20,00017,60016,000
Box, 50T26,25023,10021,000
Box, 70T34,37530,25027,500
Flat, 40T17,50015,40014,000
Flat, 50T23,75020,90019,000
Flat, 80T (6-axle)23,75020,90019,000
Flat, 100T (6-axle)32,50028,60026,000
Flat, 140T (6-axle)38,75034,10031,000
COFC, 70T30,00026,40024,000
COFC, double stack50,00044,00040,000
TOFC, 70T30,00026,40024,000
Gondola, 40T high side18,75016,50015,000
Gondola, 50T22,50019,80018,000
Tank, 7,500 gal16,25014,30013,000
Tank, 10,000 gal22,50019,80018,000
Tank, 20,000 gal36,25031,90029,000
Hopper, 50T21,25018,70017,000
Hopper, 70T30,00026,40024,000
Hopper, 100T (263K)41,12536,19032,900
Hopper, 120T (286K)44,75039,38035,800
Hopper, 125T (315K)49,25043,34039,400
Locomotive, EMD GP7 / GP937,50033,00030,000
Locomotive, EMD SW831,25027,50025,000
Locomotive, 80-ton industrial25,00022,00020,000
Locomotive, GE 65-ton20,00017,60016,000
Locomotive, GE 40-ton13,75012,10011,000

Authors' check: the Light use column equals the static wheel load (gross rail load ÷ 8 for a four-axle car; e.g., 286,000 ÷ 8 ≈ 35,800 lb). The ≤ 10 mph and 10–25 mph columns are the static value × 1.10 and × 1.25.

Limits on use. These speed allowances are lower than the 1.2 to 1.5 dynamic load factors used elsewhere in this manual because they assume slow operation. Use Table 2-S8 only for industrial, yard, terminal and light-density track. For mainline work, use Cooper E-80 or 286,000-lb loading with the client’s dynamic load factor (Chapter 1.0, §I.4).

After UFC 4-860-01FA (2004), ch. 2, §4, Table 1.4-2. Car and locomotive designations as given in the source; factor check added by the authors. Full reference under Supplemental References.

Dynamic loads, rare heavy impacts and the fourth-power rule

How large the dynamic load is depends on the traffic. North American static wheel loads range from about 12,000 lb (light rail) to 39,000 lb (heavy haul). Measured dynamic loads compare as follows:

  • FAST heavy-haul unit trains with good wheels: dynamic loads were close to static.
  • High-speed passenger corridor mixed traffic: dynamic loads ran well above static at the 2% exceedance level. Almost all of the excess came from passenger cars (23,000-lb static wheels) with wheel flats at 80–110 mph.
  • Continuous welded rail with good maintenance: dynamic loads typically run 10–20% above static.
  • Wheel and rail defects: loads near 3× static, with vibration above 100 Hz.

Rare heavy loads can control settlement. In box tests the order of loading did not change the final settlement. Once the largest load had been applied, smaller loads added almost nothing. A small share of heavy impacts, even 1 in 1,000, can therefore govern ballast settlement. Removing wheel flats, battered joints and rail defects is a substructure measure as well as a rail measure.

Uplift. The rail lifts the tie ahead of the wheel and then drives it back down. Where water is present, this pumps it.

Axle load and maintenance cost. German (DB) experience puts ballast maintenance cost roughly in proportion to the fourth power of ballast pressure, and British Rail concurs. By that rule, a 20% increase in axle load (for example, 100-ton to 125-ton cars) about doubles ballast maintenance. In box tests, raising the wheel load from 36 to 50 kips doubled the fines produced and tripled coarse breakage. DB responded with these changes:

  • 24-in. tie spacing.
  • 8.5-ft ties.
  • 121 lb/yd rail.

Together they stretched tamping intervals from 1–2 years to 4–5 years. British Rail found lab settlement roughly proportional to axle load and to tie spacing. Going from 113 to 131 lb/yd rail cut settlement about 20%. Use these figures when a client asks what a heavier car fleet will cost in substructure maintenance (Chapter 1.1).

After Selig & Waters (1994), chs. 2, 6 and 8. Full reference under Supplemental References.

2.3.2.3 Ballast and Subgrade Stress Calculator (Talbot Method)

The stress that reaches the subgrade decides whether a track section will hold its surface. The classic railroad method combines three steps: the share of a wheel load carried by the tie under it, the average pressure between that tie and the ballast, and Talbot's empirical decay of pressure with depth through the granular layers. The library's notes on stresses from surface loads give the elastic (Boussinesq) solutions that Talbot's equation is compared with.

2.3.2.3.1 Method

Equation 2.3-1. Tie-ballast pressure

qr = P (1 + IF/100) DF;  pa = 2 qr / Ab;  IF = 33 V / (100 D) percent

where P is the static wheel load, DF the distribution factor for the tie spacing, Ab the tie bearing area, V speed in mph and D the wheel diameter in inches.

Equation 2.3-2. Talbot equation and required granular depth

pc = 16.8 pa / h1.25  (psi, inches);  h = (16.8 pa / pallow)0.8
Table 2.3-20. Typical inputs
ItemTypical valueNote
Wheel load35.75 kips (286k car); 39.4 kips (315k car)Gross weight / 8 wheels
Distribution factorAbout 0.45 to 0.60Increases with tie spacing
Impact, roadbed method33V/(100D): 55% at 60 mph on 36-in. wheelsTie bending design uses larger factors
Allowable tie-ballast pressureAbout 85 psi (timber ties)Confirm against the governing standard
Allowable subgrade pressureAbout 20 psi for competent subgradeLower for soft or wet subgrade

2.3.2.3.2 Worked example: heavy-axle traffic

Table 2.3-21. 315,000-lb car at 60 mph, 9 in. × 102 in. ties (calculator output)
ResultValue
Rail-seat load qr30.54 kips
Tie-ballast pressure pa66.5 psi
Subgrade pressure under 24 in. of ballast and subballast21.0 psi
Granular depth for 20 psi25.0 in.

Twenty-four inches of granular material leaves the subgrade just over the 20-psi target under 315,000-lb cars at 60 mph, consistent with the common practice of 12 in. of ballast over 12 in. of subballast for heavy-haul main track on a competent subgrade. A weak subgrade needs either more depth or improvement (Chapter 7.2). The calculator also shows a Boussinesq curve under a single tie; it falls below Talbot because it ignores the overlap from adjacent ties.

Open the track substructure stress calculator →
Rail-seat load, tie-ballast pressure, Talbot stress at depth, required ballast plus subballast depth, and a Boussinesq comparison.

Example 2.3-6: Talbot Stress Under Heavy-Axle Cars

Table 2.3-21 gives calculator output for 315,000-lb cars at 60 mph. Worked by hand, the three steps of the Talbot method are: the share of the wheel load carried by one tie, the pressure under that tie, and the decay of pressure with depth.

Competent subgrade, pallow = 20 psiBallast + subballastD = 36 in., V = 60 mphP = 39.4 kipsh = 24 in.Ab = 9 × 102 in., DF = 0.50Rail-seat load, pa = ?p at 24 in. = ? h for 20 psi = ?GivenStatic wheel 39.4 kips (315,000-lb car)V = 60 mph; D = 36 in.DF = 0.50; tie 9 × 102 in.h = 24 in.; pallow = 20 psiRequiredRail-seat load, tie-ballast pressureSubgrade pressure at 24 in.Depth h for 20 psiBlack = given; red = required
Given and required for Example 2.3-6.

Given

VariableValueDescription
P39.4 kipsStatic wheel load: 315,000 lb / 8 wheels
V60 mphSpeed
D36 in.Wheel diameter
DF0.50Distribution factor used by the calculator for the tie spacing
Ab9 in. × 102 in. = 918 in.²Tie bearing area
h24 in.Ballast plus subballast depth
pallow20 psiAllowable subgrade pressure, competent subgrade

Required

  • Rail-seat load and tie-ballast pressure
  • Subgrade pressure under 24 in.
  • Granular depth for 20 psi

Equations

  1. Eq. 1: IF = 33V / (100D) — impact factor, as a fraction
  2. Eq. 2 (Equation 2.3-1): qr = P(1 + IF) DF; pa = 2qr / Ab — rail-seat load and tie-ballast pressure
  3. Eq. 3 (Equation 2.3-2): pc = 16.8 pa / h1.25; h = (16.8 pa / pallow)0.8 — Talbot, psi and inches

Steps

Step 1 · Impact factor (Eq. 1)
33 × 60 / (100 × 36)
IF = 0.55 (55%)
↓
Step 2 · Rail-seat load (Eq. 2)
39.4 × 1.55 × 0.50
qr = 30.5 kips
↓
Step 3 · Tie-ballast pressure (Eq. 2)
2 × 30,540 / 918
pa = 66.5 psi
Spot check: Below the 85-psi allowable for timber ties (Table 2.3-20).
↓
Step 4 · Subgrade pressure at 24 in. (Eq. 3)
241.25 = 53.1; 16.8 × 66.5 / 53.1
pc = 21.0 psi
↓
Step 5 · Depth for 20 psi (Eq. 3)
(16.8 × 66.5 / 20)0.8 = 55.90.8
h = 25.0 in.
Spot check: ln 55.9 = 4.02; 0.8 × 4.02 = 3.22; e3.22 = 25.0.
↓
Solution
pc = 21.0 psi at 24 in.; 25 in. needed for 20 psi.

Solution

Rail-seat load 30.5 kips, tie-ballast pressure 66.5 psi, subgrade pressure 21.0 psi under 24 in., and 25.0 in. of granular material for 20 psi.

The hand calculation reproduces the calculator. Twenty-four inches leaves the subgrade just over the target, which is consistent with the common heavy-haul section of 12 in. of ballast over 12 in. of subballast on a competent subgrade. A weaker subgrade with a lower allowable pressure needs more depth or improvement (Chapter 7.2).

2.3.2.3.3 Sources in the library

These documents are in the reference library. The method summaries above are paraphrased; equations are standard forms.

  • Stresses in Soil due to Surface Loads, Stresses in Soil and Stresses and Strains (course notes), Shear Stress folder.Find source ↗Library entry
  • Boussinesq and Westergaard Stresses (ENCE 361 lecture 9), Shear Stress folder.Find source ↗
  • Chapter 2.3 of this manual for ballast and subballast specifications.Find source ↗
← Previous · 2.0 The Underworld Chapter 2.2 — Soil and Rock Classification
Next · 2.0 The Underworld → Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction