Formerly Geo Rail Chapter 6.3 — Railroad Track Subgrade: Special Topics
Subballast serves as a transition filter between ballast and subgrade, provides drainage, and distributes load. AREMA Chapter 1, Part 2, Section 2.11 designs subballast as a filter between ballast and subgrade (Table 1-2-4 in the 2019 edition) and notes that standard dense-graded aggregate and aggregate base gradations may meet it. A typical gradation is shown below; confirm it against the filter check and the project specification.
| Sieve | % Passing |
|---|---|
| 1½ in. | 100 |
| ¾ in. | 55–85 |
| No. 4 | 30–60 |
| No. 10 | 20–50 |
| No. 40 | 10–25 |
| No. 200 | 0–7 |
Filter compatibility between subballast and subgrade must be verified using Terzaghi filter criteria:
D₁₅(subballast) / D₈₅(subgrade) < 5 (piping criterion)
D₁₅(subballast) / D₁₅(subgrade) > 5 (permeability criterion, for drainage)
Material. Selig and Waters base North American subballast requirements on ASTM D1241 (withdrawn 2024):
Under saturated repeated loading, crushed rock with no plastic fines performed best and natural rounded gravel performed worst.
Filter criteria. The subballast must satisfy these against the subgrade below and against the ballast above:
For medium- to high-plasticity clay with no silt or sand, D15 of the filter may be up to 0.016 in., provided Cu ≤ 20 to limit segregation. Confirm with a repeated-load filter test, because the criteria were developed for steady seepage.
Permeability balance. Subballast should be at least 10 times less permeable than the ballast, with a sloped surface, so that rain sheds sideways instead of soaking the subgrade. It still needs to be more permeable than the subgrade so upward seepage can escape. In frost areas, do not add fines to lower the permeability.
When one gradation will not work. A single layer between AREMA No. 4 ballast and a fine subgrade would have to span fine gravel to silt. In that case, use two layers. The upper, coarser layer is matched to the ballast. The lower layer is a blanketing sand matched to the subgrade (Table 2-SW3).
| Sieve | % passing |
|---|---|
| ½ in. | 100 |
| No. 8 | 80–100 |
| No. 16 | 70–90 |
| No. 30 | 48–76 |
| No. 50 | 24–60 |
| No. 100 | 5–42 |
| No. 200 | 0–10 |
Frost. Where frost and water can reach the subballast, keep silt plus clay below about 5%.
Placement. Shape and compact the subgrade to drain before placing subballast. Then:
After Selig & Waters (1994), ch. 9. Full reference under Supplemental References.
Where native subgrade is soft (CBR < 3) or frost-susceptible, a blanket layer of select granular material is required between the subgrade and subballast. This is often called a "capping layer" or "sub-base" in international railroad practice.
Minimum blanket thickness to reduce σ_s to acceptable level:
From Table 2.3-1, select d (ballast + subballast + blanket total) to achieve σ_s ≤ σ_allow(subgrade).
For soft clay subgrade with q_u = 1,200 psf (s_u = 600 psf), a bearing check with FS = 3.0 for cyclic loading gives:
σ_allow = (π + 2) × s_u / FS, with s_u = q_u / 2 and FS ≥ 3.0 for cyclic loading
σ_allow = 5.14 × 600 / 3.0 ≈ 1,028 psf
From Table 2.3-1, this requires d of about 29 in. (use 30 in., σ_s ≈ 981 psf), or supplemental ground improvement (see Chapter 7.2).
Typical minimums. North American practice has used the following:
These values set ballast depth for tamping, fines storage and filtering. They do not, by themselves, protect a weak subgrade. Size the combined ballast and subballast (the “granular layer”) separately, to prevent progressive shear and excessive cumulative plastic settlement.
Threshold stress. Repeated-load triaxial tests show a cyclic deviator stress that separates two behaviors:
The threshold rises roughly linearly with confining stress. British Rail sets the granular depth where the traffic-induced stress drops to the threshold stress. For example, a 35-kip axle on a subgrade with a 8.7-psi threshold needs about 24 in..
British Rail practice.
Field validation. Subgrade movement (in. per million axles) was rapid where the actual granular depth was less than the design depth and slow where it was greater. Deepening the ballast stabilized a previously unstable site.
This method complements the Li–Selig method above. Use the threshold check as a quick screen, and use Li–Selig where the design tonnage and cumulative deformation must be shown explicitly.
After Selig & Waters (1994), ch. 10. Full reference under Supplemental References.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| σallow | intermediate value computed on this page | Another equation | Computed: σ_allow = (π + 2) × s_u / FS, with s_u = q_u / 2 and FS ≥ 3.0 for cyclic loading | project-specific |
The Talbot equation in AREMA (h = (16.8 p a /p c ) 0.8 in inches, about 0.24 (p a /p c ) 0.8 in meters, with a universal allowable subgrade stress of 20 psi) dates from field tests in the 1910s–1920s. Li et al. note it ignores subgrade type, repeated loading and material quality, so it is unconservative on soft soils and overly conservative on good ones. They compare four methods:
Table 2-S7. Comparison of granular layer design methods (Li et al., 2016, Table 5.1)
| Feature | AREMA equations | Raymond | British Rail | Li–Selig |
|---|---|---|---|---|
| Traffic | Single wheel | Single wheel | Single wheel | Multiple wheel loads and total tonnage |
| Subgrade property | None | Soil type | Threshold strength | Resilient modulus and compressive strength |
| Ballast property | None | None | None | Resilient modulus |
| Design criteria | 20 psi allowable | Allowable stress by soil class | Progressive shear | Progressive shear and cumulative deformation |
| Stress model | Empirical | Homogeneous | Homogeneous | Multilayer |


For heavy-haul mainline work on soft subgrade, the Li–Selig method (which checks both progressive shear and cumulative plastic deformation over the design tonnage) is the most defensible of the four; the Talbot result can be shown alongside it for comparison with the owner railroad's standards.
Source: Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press / Taylor & Francis
UIC Code 719R classes the subgrade by its expected behavior: S3 good (low settlement, very good support), S2 medium, S1 poor (large settlement), and S0 very poor, plus R for sound rock, which later UIC editions fold into S3. The class follows from fines content, plasticity, Los Angeles value for rock, and whether hydrogeological conditions are good or bad.
| Soil or rock description | Hydrogeological conditions | Subgrade class |
|---|---|---|
| Rock of very good quality | – | R |
| Well-graded soils with < 5% fines; hard rock with LA < 30 | – | S3 |
| Soils with 5–15% fines; sand with < 5% fines; moderately hard rock (30 < LA < 40) | good / bad | S3 / S2 |
| Soils with 15–40% fines; rock moderately susceptible to weathering; soft rock (LA > 40); silty sand and schist with PI > 7 | good / bad | S2 / S1 |
| Rock very susceptible to weathering; soils with > 40% fines; slightly plastic silt | – | S1 |
| Organic soils; soils with > 15% fines at high moisture; soluble soils (rock salt, gypsum); thixotropic soils (quick clay); mixed material / organic; contaminated ground | – | S0 |

Fines = particles smaller than 60 µm. Some railways place the mixed/organic soils in S1.
S0 soils settle heavily, are inhomogeneous, change with time and let ballast punch in. Avoid them in alignment where possible or replace them; where neither is possible, especially under high embankments, combine ground improvement with thicker ballast and subballast and a geotextile.
On S1 and S2 subsoil, UIC practice adds a formation layer of better material compacted to 100% Standard Proctor, against the 95% usually specified for embankment subsoil. It only works if the subsoil has a low water content (otherwise fines migrate up and spoil the crossfall) and the layer is homogeneous, without pockets of fine material.
| Subsoil class | Formation layer quality | Thickness (in.) |
|---|---|---|
| S1 | S2 | 12–22 |
| S1 | S3 | 8–16 |
| S2 | S3 | 8–12 |
After Profillidis (2014), §9.5–9.7, Tables 9.2–9.3, Fig. 9.5; after UIC Code 719R (1994). Full reference under Supplemental References.
UIC sizes the total track bed (ballast + subballast) by adding corrections to a base value for subgrade class. The formula comes from the finite-element stress results in Figure 2.3-14:
| Term | Depends on | Values (in.) |
|---|---|---|
| N | Subgrade class | S1: 27.6 · S2: 21.7 · S3: 17.7 |
| a | UIC group | Groups 1–2 or V > 99 mph: 0 · 3–4: −2.0 · 5: −3.9 · 6: −5.9 |
| b | Tie type and length L | Timber (8.5 ft): 0 · concrete: (98.4 − L)/2, with tie length L in inches |
| c | Maintenance volume | Medium: 0 · high, groups 1–5: −3.9 · high, group 6: −2.0 |
| d | Axle load | 22 tons: 0 · 25 tons: +2.0 · 28 tons: +4.7 · 33 tons: +9.8 |
| f | Speed | V < 99 mph: 0 · high speed on S3: 0, on S2: +2.0, on S1: +3.9 |
| g | Geotextile | Geotextile thickness, or 0 if none |
Book example. UIC group 4 line, 8.5-ft monoblock concrete ties, S2 subgrade, 22-ton axles, medium maintenance, 124 mph, 0.2-in. geotextile: e = 21.7 − 2.0 − 2.0 + 0 + 0 + 2.0 + 0.2 = 19.9 in. (about 20 in.). With the usual 6-in. subballast, the ballast is 14 in., close to the 15 in. that British practice would give. The same site with a frost index of 540 °F-days needs 31 in. of track bed for frost protection (Figure 2.3-29), and the larger value governs.

North American check. The formula's axle loads are metric tonnes. A 286k car on 4 axles carries about 32.4 t (35.75 short tons) per axle, at the top of the formula's range (d = +9.8 in. at 33 t). Treat the formula as a cross-check on the AREMA/Talbot thickness in this chapter, not as a substitute.
UIC subballast is usually 6 in. of well-graded gravel with Micro-Deval < 15–20 and LA < 20–25 depending on the line’s importance; some railways require at least 30% crushed stone on new lines. Some railways omit subballast and use a thicker formation layer instead.
After Profillidis (2014), §12.1.2, §12.5.1–12.5.5, Eq. 12.8. Full reference under Supplemental References.
Sub ballast is a compacted, well-graded sand–gravel layer 6–12 in. thick between ballast and subgrade. It is often missing on century-old mainline. It drains as part of the lateral path, adds vertical strength, and separates ballast from fine-grained subgrade in both directions. Course specification: crushed or screened pit-run gravel graded 0–3 in. or 0–¾ in., less than 8% fines, no organics, well graded, and ideally at least 50% fractured faces. Watch for contractors offering fill with more fines than specified: it compacts well dry but performs poorly once wet.

After Geotechnology for Railroaders Program, Module 3, Module 2; Module 3 §08; Module 2 §09. Full reference under Supplemental References.
Case study: 2.3.18.1 Zoning the best subgrade material, and losing it in the stockpile (Look 2023), in Section 2.3.18 Case Studies.