2.3.14 Practical Recommendations

Formerly Geo Rail Chapter 6.3 — Railroad Track Subgrade: Special Topics

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests.
Authors: Daniel P. Colwell and Mario Ruel
2.3.14 Practical Recommendations
  1. Always compute σ_s before assessing subgrade adequacy. The rail load reaches the subgrade modified by DLF, tie geometry, and layer thickness. Do not use static wheel load alone. With typical dynamic load factors, the dynamic stress is 20–50% higher than the static value.
  2. Use GPR as a screening tool, not a definitive diagnostic. GPR identifies anomalies efficiently over long distances but cannot replace borings for confirmation. Recommend correlation borings at all GPR anomaly stations before designing subgrade remediation.
  3. Design subballast as a filter, not just a filler. Verify Terzaghi filter criteria between subballast and subgrade. A subballast layer that fails the piping criterion will allow subgrade fines to migrate upward, accelerating fouling regardless of its thickness.
  4. Specify ballast quality by procurement source, not just gradation. Los Angeles abrasion and soundness test results are material-specific. Do not assume that any crusher-run angular stone meets AREMA requirements. Require pre-construction materials testing for all ballast sources and track compliance with client engineering standards.
  5. Address drainage first in all subgrade rehabilitation designs. A high fouling index in a well-drained section is a maintenance problem. The same fouling index in a poorly drained section is a structural problem. Restoring drainage often resolves ongoing pumping and progressive shear without requiring additional layer thickness.
  6. For freeze-thaw climates, treat frost blanket design as a geotechnical deliverable, not a construction detail. Submit PE-sealed frost blanket designs with supporting freezing index calculations. Confirm the jurisdiction's seal requirements.
  7. Track modulus data is a valuable project diagnostic. Where the client has track geometry car data or rail deflection measurements, obtain and include this data in the investigation report. Low track modulus zones correlate strongly with subgrade problems and improve boring location selection.
Supplemental reference

Geosynthetics and resilient layers in the trackbed

  • Long-term geogrid performance (a Class I railroad located in Mobile, Alabama). In 1988 a Class I railroad installed multi-layer punched-and-drawn polypropylene geogrid in the ballast and subballast of a 1,000-ft elevated curve that had needed resurfacing every six months or less. The resurfacing interval tripled. Samples exhumed in 2020 — after more than 2 billion gross tons and several floods, including Hurricane Katrina’s 12 ft of water — showed no loss of carbon black and a 45% increase in rib stiffness (Herbert and Gee, 2021).
  • Where geogrid is (and is not) worth it. The USACE WES literature review (Coleman, 1990) concluded that geogrid in ballast can reduce the rate of settlement and differential settlement, but warned against using it simply to reduce ballast thickness on low-density, low-speed track without site-specific justification. Place geogrid deep enough to stay below the tamping tines.
  • Sub-ballast mats. Resilient polyurethane mats placed under the ballast (for example on bridge decks or in tunnels) reduce structure-borne vibration and ballast breakdown on rigid bases. They are a structural/vibration measure and do not substitute for a drained subballast on soil subgrade.

Source: Herbert, D. and Gee, B. (2021). “Durability and Performance of Geogrid-Stabilized Ballast and Sub-ballast Track Section in Mobile, Alabama.” AREMA 2021 Annual Conference · Coleman, D. M. (1990). Use of Geogrids in Railroad Track: A Literature Review and Synopsis. U.S. Army Engineer Waterways Experiment Station, Misc. Paper GL-90 · Getzner Werkstoffe. Sub-Ballast Mats (product technical brochure)

Project management · ASCE (2012)

Resident Representative Duties and Acceptance of In Situ and Procured Materials

ASCE (2012) describes the owner’s resident project representative (RPR) as the person or firm that administers the construction contract on the owner’s behalf. RPR duties may include performing or directing QA, monitoring expenditures and progress payments, pushing timely review of submittals by the designer, evaluating and deciding on unforeseen conditions, coordinating owner site activities such as safety monitoring and testing, building the project record, and negotiating change orders.

The Manual divides materials into two classes. In situ materials are the native soil and rock; their suitability is established by laboratory testing and engineering evaluation, and the results and any retesting go into the project file. Procured materials include natural products such as earth fill and aggregates as well as manufactured items. For each procured material the file should record the qualification procedure and acceptance criteria, test type and date, the signature of the person testing, results, any nonconformance reports and, where specified, where in the structure the tested material was placed. Where workmanship is critical, the contractor may build a mock-up that, once accepted, becomes the standard for the remaining work. Substitutions are accepted only after the designer confirms they meet project objectives, and are then formalized by change order.

On unit-price contracts, common where quantities cannot be known precisely, the RPR and contractor jointly measure completed quantities. The Manual acknowledges that unknown soil conditions can change quantities enough that a unit price must be renegotiated, sometimes with a change in contract time. On lump-sum work the RPR checks that the schedule of values is not unbalanced.

For railroad work: Ballast, subballast, geosynthetics and select fill are procured materials and should be accepted against the railroad’s specification with traceable test records tied to stockpile, delivery ticket and placement station. Native subgrade exposed by undercutting is an in situ material whose acceptance (or further undercut) depends on the engineer’s evaluation at the time, which is a natural role for the RPR. A short test section at the start of a subgrade rehabilitation, accepted on proof rolling and density, can serve as the mock-up that sets the standard for the rest of the work.

Source: American Society of Civil Engineers (2012). Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors, 3rd ed. ASCE Manuals and Reports on Engineering Practice No. 73. Reston, VA: ASCE, pp. 169–175. Summarized and paraphrased. Full reference under Supplemental References.

Project management · Kelly et al. (2004)

Function Analysis and FAST Diagramming for Substructure Remedies

Function analysis is the core of value management. It describes what a project or element must do, as two-word verb–noun pairs, before anyone discusses what it should be. Kelly, Male and Graham have a team brainstorm functions, sort them from high-order needs down to low-order wants, and arrange them in a FAST (Function Analysis System Technique) diagram. Read left to right, the diagram answers “how?”; read right to left, it answers “why?”. A scope line separates the project’s mission from the functions open to brainstorming. In their technical FAST for a river crossing in a park, the mission “facilitate passage across river” leads to the primary function “support people,” with the parallel function “span river” and secondary functions such as “protect people” and “control people.” Design objectives such as “non-slip surface” and “reduce downtime due to flooding” sit above the diagram. Because the team works from functions, the solutions it considers range beyond bridge types: the authors note the answer might be a cable ferry rather than a bridge. For elements, element function analysis has five stages: pick the cost-dominant elements; list every function the element can perform; delete the functions not needed in this context; brainstorm against the functions that remain; and evaluate.

Technical FAST diagram for a river crossing, arranging verb–noun functions along how/why logic with primary, parallel and secondary objectives and design objectives above.
Figure 2-PM1. Technical FAST diagram for a river crossing, arranging verb–noun functions along how/why logic with primary, parallel and secondary objectives and design objectives above. Source: Kelly et al. (2004), Fig. 3.8.

For railroad work: Apply element function analysis to the track substructure before choosing a remedy for a chronic soft spot. The candidate functions of ballast, subballast and subgrade include “distribute load,” “resist shear,” “drain water,” “separate layers,” “restrain track,” “limit frost penetration” and “provide resilience.” Keep only those the investigation shows are failing. If the evidence points to failed “drain water” and “separate layers,” that is, mud-pumping fines with a sound deeper subgrade, the brainstorm should center on drainage and filter or separation solutions, not a deep undercut. If “resist shear” is failing in the subgrade itself, the option set changes. Stating the needed functions explicitly ties the recommendation to the diagnosis and gives reviewers a clear reason why other remedies were set aside.

Source: Kelly, J., Male, S. and Graham, D. (2004). Value Management of Construction Projects. Oxford: Blackwell Science, pp. 62–69, 75–77. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.

Project management · Jacob and Müller (2017)

Building an Earthwork Unit Price from Crew, Equipment and Haul Cycle

Passeck’s chapter in Jacob and Müller builds earthwork unit prices from the bottom up. The direct cost of each bid item is split into five parts: labor, equipment (including fuel and lubricants), materials, third-party services and transport, and site facilities. Percentage surcharges are then added. The example uses 8% general overhead, 6% site overhead, 3% risk and 3% profit, a total of 20%.

The cost components are built up as follows:

  • Labor. The all-in operator wage is the base wage plus premiums, ancillary costs, social costs and imputed costs. In the book’s example these add-ons total 140%, so the all-in rate is 2.4 times the base wage.
  • Equipment. The hourly rate is depreciation, interest and repair, from an equipment register at 170 hours per month, adjusted to market (60% in the example). Fuel and lubricants are added from rated power and specific consumption, plus the operator with a 10% maintenance allowance. For a 77,000-lb excavator the components were about 48% ownership and repair, 24% fuel and 28% operator.
  • Equipment choice by haul distance. Dozer up to about 230 ft, loader up to about 490 ft, scraper up to about 820 ft. Beyond that, excavator, haul units and spreader/compactor work separately. Articulated dumpers suit rough haul roads up to about 1.5 mi, and trucks suit longer hauls on better roads.

Worked haul example (book values converted to US units):

  • Loader output is 327 BCY/hr.
  • Each truck carries 10.5 BCY (13.1 LCY at 25% swell).
  • The one-way haul is 16,400 ft at 13 mph, which is 70% of the 18.6 mph site limit.
  • The cycle is 3 min to load, 2 min to dump and 28.6 min to travel, 33.6 min in all, so each truck makes 1.79 loads/hr, or 18.7 BCY/hr.
  • 327 ÷ 18.7 = 17.5, so 18 trucks are needed.
  • Haul cost per BCY is (18 × truck rate) ÷ 327.
Example 2.3-5: Truck Fleet for a Long Haul

The haul example from Jacob and Müller, in US units. Matching the truck fleet to the loader is the core of an earthwork unit price, and the same arithmetic sizes the haul for undercutting spoil and imported subballast.

Loader327 BCY/hrDumpHaul 16,400 ft at 13 mphReturn 16,400 ft at 13 mphload 3 mindump 2 minTruck: 10.5 BCY (13.1 LCY at 25% swell)Cycle time = ? Output per truck = ? Trucks = ?GivenLoader 327 BCY/hrTruck 10.5 BCYOne-way haul 16,400 ftSpeed 13 mphLoad 3 min, dump 2 minRequiredCycle time, output per truckTrucks to keep the loader busyBlack = given; red = required
Given and required for Example 2.3-5.

Given

VariableValueDescription
QL327 BCY/hrLoader output
c10.5 BCY per truckTruck capacity (13.1 LCY at 25% swell)
L16,400 ft one wayHaul distance
v13 mphHaul speed (70% of the 18.6-mph site limit)
tload, tdump3 min and 2 minFixed times per cycle

Required

  • Cycle time and output per truck
  • Number of trucks to keep the loader busy

Equations

  1. Eq. 1: ttravel = 2L / (88 v) — round-trip travel time in minutes (1 mph = 88 ft/min)
  2. Eq. 2: tcycle = tload + tdump + ttravel
  3. Eq. 3: q = (60 / tcycle) × c — truck output, BCY/hr
  4. Eq. 4: N = QL / q, rounded up — trucks needed

Steps

Step 1 · Travel time (Eq. 1)
2 × 16,400 / (88 × 13) = 32,800 / 1,144
28.7 min
↓
Step 2 · Cycle time (Eq. 2)
3 + 2 + 28.7
33.7 min (33.6 in the source)
↓
Step 3 · Output per truck (Eq. 3)
60 / 33.6 = 1.79 loads/hr × 10.5
q = 18.7 BCY/hr
↓
Step 4 · Number of trucks (Eq. 4)
327 / 18.7 = 17.4
N = 18 trucks
Spot check: 18 × 18.7 = 337 BCY/hr ≥ 327.
↓
Solution
18 trucks.

Solution

Each truck cycles in about 33.6 min and moves 18.7 BCY/hr; 18 trucks keep the loader working.

Travel is 85% of the cycle, which is why haul dominated the unit price in the source. On a railroad the same calculation is made per effective work-window hour, after setup, flagging and clearing, and with on-track or hi-rail haul where trucks cannot cross the live track.

The excavate-haul-place-compact item then added loading (14%), haul (57%), spreading and compaction with one dozer and two rollers (25%), and fine grading (4%). Haul dominated the cost.

The authors stress pricing all earthwork items together, using a mass haul diagram to minimize haul distance and stockpiling, and adjusting manufacturer production figures for soil class, swell and site constraints.

Example mass haul diagram plotting cumulative cut and fill volume against station, used to balance earthwork and find average haul distances (SI units in the original).
Figure 2-PM2. Example mass haul diagram plotting cumulative cut and fill volume against station, used to balance earthwork and find average haul distances (SI units in the original). Source: Jacob and Müller (2017), Figure 1.4.7.

For railroad work: Undercutting and subgrade rehabilitation estimates should be built the same way. The cycle is constrained by track-window length, the number of access points, and on-track or hi-rail haul instead of open haul roads. Haul units cannot cross or foul the live track without protection. Use productivity per effective window hour after setup, flagging and clearing time, not per shift hour. Show spoil disposal (especially fouled ballast) and imported subballast as separate cost lines.

Source: Jacob, D. and Müller, C. (Eds.) (2017). Estimating in Heavy Construction: Roads, Bridges, Tunnels, Foundations. Berlin: Ernst & Sohn, pp. 36–50. Summarized and paraphrased; figures reproduced for internal reference. Full reference under Supplemental References.

Project management · Pratt (2011)

Pricing Undercut, Haul and Imported Subballast: Crew Rates, Fixed Costs and Truck Fleet Size

Pratt prices excavation from productivity and crew cost, and keeps the two separate. Unit cost equals crew-hours per unit times cost per crew-hour. That way a change in wage rates and a change in productivity can each be applied on its own. Applied separately, an 8% wage increase and a 10% productivity loss raise the unit price by 18.8%, not the 18% you get by adding them.

Fixed costs depend heavily on job size. A backhoe that digs 60 CY/h, with $4,000 for transport and set-up, comes to $2.73/CY for equipment on a 3,000-CY job but $14.73/CY on a 300-CY job.

For hauling, Pratt sizes the truck fleet so that the excavator or loader never waits:

Number of trucks = (round-trip travel time + unloading time) / loading time + 1, always rounded up

Loading time is the truck’s bank-measure capacity divided by the loader output. Bank capacity is the loose capacity divided by (1 + swell). In his gravel example, the pit is 16 miles away, trucks average 20 mph and take 5 minutes to unload, so the cycle away from the loader is 101 minutes. A 12-CY truck with 12% swell carries 10.71 bank CY. At 50 BCY/h the loader fills it in 12.85 minutes, so the fleet is 101/12.85 + 1 = 8.86, rounded up to 9 trucks. With a $2.50/CY pit royalty, the delivered gravel costs $16.34 per bank CY. A price quoted per ton is converted using the weight of a compacted cubic yard: $/CY = $/ton × (lb/CY) / 2,000.

Table 2-PM2. Table: Loose and bank weights and compaction factors (after Pratt 2011, Figure 10.2)

MaterialLoose (lb/CY)Bank (lb/CY)Compaction factor
Clay, dry2,5003,10024.0%
Gravel, pit-run, dry2,5502,85011.8%
Sand, dry2,4002,70012.5%
Sand and gravel, dry2,9003,25012.1%

For railroad work: on undercutting and subgrade rehabilitation, the track window usually sets the production rate, not the excavator. Estimate the cubic yards that can be removed and replaced per window. Then size the spoil trucks, side-dump cars or ballast cars with Pratt’s formula, so the machine never waits during a window that has already been paid for. On short jobs, fixed costs (mobilization, work-train set-up, flagging) are spread over a small quantity and dominate the unit price, as Pratt’s 300-CY case shows. Price imported subballast in bank measure, with explicit compaction and waste allowances.

Source: Pratt, D. J. (2011). Fundamentals of Construction Estimating, 3rd ed. Clifton Park, NY: Delmar Cengage Learning, pp. 224–235. Summarized and paraphrased. Full reference under Supplemental References.