2.3.9 Ground-Penetrating Radar (GPR) for Ballast Assessment

Formerly Geo Rail Chapter 6.3 — Railroad Track Subgrade: Special Topics

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests.
Authors: Daniel P. Colwell and Mario Ruel
2.3.9 Ground-Penetrating Radar (GPR) for Ballast Assessment

GPR is an efficient, non-destructive tool for mapping ballast fouling, subballast thickness, and subgrade moisture conditions along track. It is common practice for mainline rehabilitation investigations.

2.3.9.1 GPR Method Overview

GPR uses an antenna (typically 400 MHz or 1 GHz) mounted on a hi-rail vehicle to transmit and receive electromagnetic pulses through the track structure. Reflections at material boundaries provide:

  • Ballast/subballast interface depth
  • Subballast/subgrade interface depth
  • Areas of fouled or wet ballast (higher dielectric constant)
  • Subgrade anomalies (mud pockets, voids, wet zones)
2.3.9.2 GPR Interpretation — Dielectric Constant

The depth to a reflector:

d_GPR = (v × t_twtt) / 2 (ft)

where:

  • v = electromagnetic wave velocity in ballast (ft/ns); v = c / √ε_r
  • c = speed of light = 0.984 ft/ns
  • ε_r = relative dielectric constant of ballast (clean ballast: ε_r ≈ 3–4 measured, 5–6 often assumed; fouled/wet ballast: ε_r ≈ 10–30; see Table 2.3-25)
  • t_twtt = two-way travel time (ns) from radar trace
Ground Penetrating Radar
Ground Penetrating Radar
Table 2.3-6. GPR Dielectric Constants for Track Materials
Materialε_rWave Velocity (ft/ns)
Clean ballast, dry to moist (measured)3–40.492–0.568
Clean granite ballast (value often assumed in practice)5–60.402–0.440
Moderately fouled ballast8–120.284–0.348
Highly fouled/saturated15–300.180–0.254
Subballast (granular, dry)6–90.328–0.402
Clay subgrade (moist)20–400.156–0.220
Ballast voids/air10.984

Note: the clean-ballast row was revised to the measured values of 3 to 4 (Table 2.3-25 at the end of this section). The 5 to 6 often assumed is kept for comparison. Calibrate each survey at crib digs or by CMP.

Inputs for the equations in this section (4)
SymbolWhat it isComes fromHow to get itTypical range
velectromagnetic wave velocity in ballast (ft/ns)Field test (geophysics)From the dielectric constant, v = c/√εr, or measured directly by a common-midpoint (CMP) or wide-angle GPR survey (ASTM D6432).project-specific
cspeed of light = 0.984 ft/nsConstantPhysical constant or standard value.project-specific
εrrelative dielectric constant of ballast (clean ballast: ε_r ≈ 3–4 measured, 5–6 often assumed)Field test (geophysics)Back-calculated at a crib dig or boring of known depth, εr = (c·t/2d)2, or from a CMP survey. Laboratory values by ballast type, fouling and moisture are in Table 2.3-26.≈ 3–4 clean (measured); calibrate
ttwtttwo-way travel time (ns) from radar traceField test (geophysics)Read from the GPR record (ASTM D6432). Where the fouled zone has no sharp interface, use the depth of the energy drop on a short-time Fourier transform (STFT) plot.project-specific
2.3.9.3 GPR Deliverables

Standard GPR deliverables for railroad geotechnical investigations:

  • Continuous color-coded fouling index map along alignment (1 ft spatial resolution)
  • Ballast depth profiles (both rails and center)
  • Subballast thickness profile
  • Anomaly log (GPS-referenced stations flagging mud pockets, thin layers, wet zones)
  • Correlation borings recommended at anomaly stations (typically 1 boring per 5 anomaly locations)

Correlate GPR survey results with field-verified boring data before design recommendations are finalized.

Supplemental reference · Saarenketo, in Jol (ed.) (2009)

Railway GPR Practice: Antennas, Dielectric Values and Survey Lines

GPR on track is harder than on pavement. The rails and ties, especially concrete ties, and nearby electrical wires interfere with the signal, and dense sampling at track speed was long a problem for scheduling (Saarenketo, in Jol 2009). Experience summarized from North America and Europe:

  • Antenna choice varies. 1-GHz air-coupled horn antennas have worked well in North America. UK and Finnish work got the best thickness data with 400 to 500 MHz antennas. High frequencies scatter in ballast with stones larger than about 2 in. Antennas carried well above the ballast act at a somewhat higher effective frequency than the same antennas on the ground.
  • Dielectric value is the key to ballast quality, and it changes with both fouling and moisture (Table 2.3-25). The surface-reflection method used on pavements to measure the dielectric constant does not work on ballast, so use a CMP or wide-angle survey, or calibrate at crib digs.
  • Survey in frozen conditions where only ballast thickness is wanted. In Finland, freezing removes most of the moisture variation and with it the error in the dielectric value.
  • Run three lines: track center and outside each rail. Where the three records agree the substructure is usually uniform. Where they differ sharply, suspect a problem with track stability on that side (Olhoeft and Selig).
  • Combine methods. The best results came from combining GPR with other measurements: infrared thermography, track stiffness from a loading vehicle, ballast sampling and falling-weight deflection. One early comparison found no link between track stiffness and average GPR amplitude, but later combined analysis was more promising.
  • Detectable geosynthetics. On new construction over karst or old mine workings, a radar-detectable geosynthetic placed in the trackbed lets later GPR surveys show any settlement of that layer.
  • GPR is also used on railroad bridge decks and in tunnels to locate reinforcement, delamination, voids behind linings and water.
Table 2.3-25. Published dielectric values of ballast (as compiled by Clark et al. 2003, in Saarenketo 2009)
ConditionClark et al. (2001)Sussmann et al. (2002), granite
Dry clean ballast33.6
Moist clean ballast3.54
Dry spent (fouled) ballast4.33.7
Moist spent ballast7.85.1
Wet spent ballast38.57.2

These measured values for clean ballast (3 to 4) are now the clean-ballast row of Table 2.3-6, which previously gave 5 to 6. Using 5 to 6 for clean, dry ballast underestimates the velocity and therefore the ballast thickness by roughly 10 to 30%. Use crib-dig or CMP calibration for each survey rather than either table. The two studies also differ widely for wet spent ballast (7 to 39), which shows how much the value depends on the fines, the water and the measurement.

For railroad work: Ask the GPR contractor which antennas will be used and why, how the dielectric value will be calibrated (CMP, crib digs or both), and whether lines will be run outside both rails as well as at the center. Schedule ballast-thickness surveys for frozen, dry or at least stable moisture conditions, and repeat surveys in the same season so the results can be compared. Treat a sharp difference between the three lines as a reason for a crib dig or boring at that location.

Source: Saarenketo, “NDT Transportation,” in Jol (ed.) (2009), Ch. 13, Section 13.8 and Table 13.3. Summarized and paraphrased; particle size converted. Full reference under S19.

Supplemental reference · Leng and Al-Qadi (2010)

What Controls the GPR Signal in Ballast: Laboratory Calibration and Field Check

A GPR depth is only as good as the dielectric constant used to convert travel time to depth. In practice that value is rarely known, and the change from clean to fouled ballast is usually gradual, so it may give no reflection at all. The study summarized here measured the dielectric constant of two ballast types in the laboratory, then used a time–frequency method to find fouling that does not show as a reflector.

Laboratory set-up. Two wooden boxes, 5 × 5 × 4 ft, were built with fiberglass screws so that no metal disturbed the signal. Each was filled with uniformly graded 2.5-in. granite or limestone ballast, oven-dry, compacted to 36.3% air voids (granite) and 37.8% (limestone). Data were collected with 2-GHz air-coupled horn antennas. The ballast was placed in 12-in. lifts. Dry clay was worked into the bottom lift at 10, 25, 40 and 50% of its void volume, clean lifts were added on top to a total of 36 in., and water was then sprayed into the bottom lift at up to 50% of its void volume. The layer thickness was measured at the box corners, so the dielectric constant could be back-calculated from the two-way travel time:

εr = (c · t / 2d)2

where c = 0.984 ft/ns, t = two-way travel time through the layer (ns) and d = layer thickness (ft). This is the depth equation of Section 2.3.9.2 solved for εr, and it is the same calculation used to calibrate a survey at a crib dig (Example 2.3-8).

Table 2.3-26. Laboratory dielectric constant of granite and limestone ballast vs. clay fouling and moisture (2-GHz air-coupled antennas)
BallastCondition variedFitted lineR2εr over the tested range
GraniteDry clay fouling F = 0 to 0.50εr = 3.24 + 1.04 F0.9873.24 to 3.76
LimestoneDry clay fouling F = 0 to 0.50εr = 3.73 + 1.63 F0.9933.73 to 4.55
Granite, 13% fouledWater W = 0 to 0.15εr = 3.96 + 31.9 W0.939about 3.9 to 9.1
Limestone, 13% fouledWater W = 0 to 0.15εr = 4.57 + 39.9 W0.980about 4.2 to 10.5

F = volume of dry clay as a fraction of the ballast void volume; W = volume of water as a fraction of the void volume. The ranges in the last column for moisture are those reported in the text of the paper; the fitted lines give 3.96 to 8.7 for granite and 4.57 to 10.6 for limestone. The paper’s conclusions give 3.96 to 4.84 for dry limestone over 0 to 50% fouling, which does not agree with its own fitted line (3.73 to 4.55); the granite range (3.25 to 3.77) does agree. Use the fitted lines, and read the 0.3 difference as a guide to how closely these values can be relied on. The moisture series also starts higher than the fouling line gives at 13% (3.37 granite, 3.94 limestone) because it was measured on the full 36-in. layered box. All of this is another reason to calibrate each survey rather than take a value from a table.

What the measurements show:

  • Ballast type matters. Limestone has a higher dielectric constant than granite at every fouling level. Calibrate to the rock type on the line; do not carry a value from one quarry source to another.
  • Dry fouling changes the value only a little. Filling half the voids with dry clay raised εr by about 0.5 (granite) to 0.8 (limestone), so dry fouled ballast and clean ballast can look much the same in velocity.
  • Water changes it a lot. The value more than doubles as water rises to 15% of the void volume. Water at only about 2% of the void volume moves εr as much as the whole 0 to 50% fouling range. Wet, fouled ballast is the case GPR finds most easily; dry fouled ballast is the case it can miss.
  • The ballast must be nearly clean for the clean-ballast values to apply. These are bulk values for the whole layer. Table 2.3-6 gives the higher values typical of moist and fouled field ballast.

Reading fouling from a time–frequency plot. A short-time Fourier transform (STFT) breaks the radar trace into short time windows and plots the energy at each frequency against travel time, which converts to depth with the calibrated εr. Three signatures were found (Figure 2.3-74):

  • Clean ballast: the energy fades gradually and smoothly with depth.
  • Fouled ballast: a sudden drop in energy at the top of the fouled zone. In the box, 24 in. of clean ballast over a lift with half its voids filled with clay showed the drop at about 26 in. The clay had settled into the bottom 10 to 11 in. of the lift, filling about 60% of the voids there, rather than filling the top 6 in. completely. The drop therefore marks where fouling becomes heavy, not where fines first appear.
  • Trapped water: a zone of high energy, from the strong reflection at the wet layer.
Depth (in.) 0122436 (a) Clean ballast(b) Fouled zone(c) Trapped water gradual fade sudden energy drop high-energy zone Frequency (low to high) →Frequency (low to high) →Frequency (low to high) → high energylow energySchematic, after the 36-in. laboratory boxes
Figure 2.3-74. The three STFT signatures: (a) gradual attenuation in clean ballast; (b) sudden energy drop at the top of a fouled zone; (c) high-energy zone at trapped water. Schematic drawn for this manual after Leng and Al-Qadi (2010), Fig. 9.

Antenna frequency. The voids in clean 2.5-in. ballast are about the size of the wavelength at 2 GHz (about 3.3 in. in clean, dry granite, where v ≈ 0.55 ft/ns), so the voids scatter the 2-GHz signal and that scatter is itself a sign of clean ballast. At 1 GHz the wavelength is about twice as long and the void scatter is barely visible. Choose 2 GHz where ballast condition is the question and lower frequencies (400 MHz to 1 GHz) where layer thickness and the subgrade are the question.

Field check. Data were collected on a main line of a Class I railroad located in eastern Wyoming, with granite ballast, using 2-GHz air-coupled antennas on a hi-rail vehicle. To reduce reflections from the rails and ties the antennas were carried 2 ft outside the rails, so the records are of the ballast shoulder. Shoulder samples were taken at 6-in. depth intervals for moisture and gradation, and the STFT depths were computed with the laboratory dielectric constant for the measured moisture. Table 2.3-27 compares the two.

Table 2.3-27. Fouling Index by depth from shoulder samples vs. the STFT signature, four field cases (granite ballast)
Case0–6 in.6–12 in.12–18 in.18–24 in.24–30 in.30–36 in.STFT signature
11.71.12.87.87582Energy drop from about 25 in. to 36 in.
200.210687––Energy drop at about 15 in.; high-energy zone at about 20 in. (rain before the survey)
39.25.919.3–––Energy drop at about 17 in.
45.65.013.834.8––Small drop at 11 to 14 in.; large drop at about 18 in.

FI = P4 + P200 (Table 2.3-5). The paper classes FI below 10 as clean, 10 to 20 as moderately fouled and above 20 as seriously fouled. FI can exceed 100 because the No. 200 fraction is also counted in P4. A dash means no sample at that depth.

In every case the energy drop fell in or at the top of the first sample interval classed as moderately or seriously fouled. Because each sample covers 6 in., a high FI shows fouling somewhere in that interval, not at its top. The GPR energy drop may locate the top of the fouling more closely than the samples do.

Limits. The authors warn against overselling the method. Noise from rails, ties and radio signals can hide the ballast information, and the STFT reading assumes a clean record. The laboratory fouling was dry clay; fines from ballast breakdown, coal dust or a pumping subgrade will give other values. The field records were taken on the shoulder, not under the ties. And without a good dielectric constant the depth of the energy drop is no better than the assumed value.

For railroad work: Ask the GPR contractor what dielectric constant was used for each reach and why, and require it to be calibrated at crib digs in each ballast type and moisture condition on the job. Ask for STFT (or similar time–frequency) plots where the clean-to-fouled change is gradual, and have energy drops and high-energy zones entered on the anomaly log (Section 2.3.9.3), with the high-energy zones treated as trapped water and a drainage question. Compare dry-season and wet-season surveys only if the calibration was repeated. Before setting an undercut depth from GPR, confirm the depth at a crib dig or boring, sampling in intervals of 6 in. or less.

Source: Leng, Z. and Al-Qadi, I. L. (2010). “Railroad Ballast Evaluation Using Ground-Penetrating Radar: Laboratory Investigation and Field Validation.” Transportation Research Record 2159, 110–117, Eqs. 1–5, Figs. 7–9, 11, Table 1. Summarized and paraphrased; fitted lines rounded and moisture and fouling expressed as fractions of void volume. Full reference under S5.

Example 2.3-8: Calibrating a GPR Survey at a Crib Dig

A Class I railroad located in Nebraska is planning an undercutting program on a granite-ballasted main line, and a 2-GHz hi-rail GPR survey has been run. Where the fouling is gradual there is no clear reflector, so the depth to the top of the fouled ballast is read from the energy drop on the STFT plot. The contractor converted travel time to depth with an assumed dielectric constant of 5.5. A crib dig at Station A found 14 in. of clean ballast over fouled ballast, and the energy drop there is at a two-way travel time of 4.5 ns. At Station B the drop is at 6.2 ns. The engineer must calibrate the dielectric constant at the dig, find the depth to fouling at Station B, and say how far the contractor’s depth is off.

ties and rail clean granite ballast fouled ballast antennaantenna Station A (crib dig)Station B d = 14 in.t = 4.5 ns dig d = ?t = 6.2 ns GivenCrib dig: d = 14 in., t = 4.5 nsStation B: t = 6.2 nsContractor’s εr = 5.5c = 0.984 ft/nsGranite ballast, 2-GHz antennas RequiredCalibrated εr and velocityDepth to fouling at Station BError in the contractor’s depthIs the calibrated εr reasonable? Black = given; red = required
Given and required for Example 2.3-8.

Given

VariableValueDescription
dA14 in. = 1.167 ftClean ballast thickness measured in the crib dig at Station A
tA4.5 nsTwo-way travel time to the energy drop at Station A
tB6.2 nsTwo-way travel time to the energy drop at Station B
εr,assumed5.5Dielectric constant assumed by the GPR contractor
c0.984 ft/nsSpeed of light
Reference valuesTables 2.3-25 and 2.3-26Measured dielectric constants of clean ballast

Required

  • (a) Calibrated dielectric constant at the crib dig
  • (b) Wave velocity in the clean ballast
  • (c) Depth to the top of the fouled ballast at Station B
  • (d) The depth the contractor reported with εr = 5.5, and its error
  • (e) Whether the calibrated value is reasonable

Equations

  1. Eq. 1: εr = (c t / 2d)2 — back-calculation at a known depth
  2. Eq. 2: v = c / √εr
  3. Eq. 3: d = v t / 2 — two-way time, so halve

Steps

Step 1 · (a) εr at the crib dig (Eq. 1)
(0.984 × 4.5 / (2 × 1.167))2 = (4.428 / 2.333)2 = 1.8982
εr = 3.60
↓
Step 2 · (b) Velocity (Eq. 2)
0.984 / √3.60 = 0.984 / 1.898
v = 0.518 ft/ns
Spot check: back at the dig, 0.518 × 4.5 / 2 = 1.167 ft = 14.0 in.
↓
Step 3 · (c) Depth at Station B (Eq. 3)
0.518 × 6.2 / 2
dB = 1.61 ft = 19.3 in.
↓
Step 4 · (d) Contractor’s depth (Eqs. 2 and 3)
v = 0.984 / √5.5 = 0.420 ft/ns; d = 0.420 × 6.2 / 2 = 1.30 ft
15.6 in.: 3.7 in. (19%) too shallow
Spot check: depth scales with 1/√εr: 19.3 × √(3.60/5.5) = 19.3 × 0.809 = 15.6 in.
↓
Step 5 · (e) Check against measured values
Dry clean granite in the laboratory: 3.24 (Table 2.3-26); moist clean ballast: 3.5 to 4 (Table 2.3-25)
3.60 fits clean, slightly moist granite ballast
↓
Solution
εr = 3.60; v = 0.518 ft/ns; fouling at 19.3 in. at Station B, not 15.6 in.

Solution

(a) εr = 3.60. (b) v = 0.518 ft/ns. (c) The top of the fouled ballast at Station B is 19.3 in. below the top of ballast. (d) With the assumed 5.5 the contractor reports 15.6 in., 3.7 in. (19%) too shallow. (e) The calibrated value is within the range measured for clean, slightly moist ballast.

An error of this size matters for undercutting: a cut set from the contractor’s depth would leave about 4 in. of fouled ballast in place. Because depth scales with 1/√εr, every survey reach needs its own calibration where the ballast type or moisture changes. Granite and limestone differ, and a rain before the survey can raise the value sharply (Table 2.3-26). Here a higher value than 3.60 would make the depth at Station B shallower, and a lower value deeper. The calibration only holds for the clean layer above the energy drop. Below it the fouled ballast has a higher value, so do not use 3.60 to convert deeper reflectors such as the subballast interface. Confirm Station B with a second crib dig before the undercut depth is fixed.