↑ Parent Menu⌂ Main Menu
← Chapter 2.3 Track Substructure: Ballast, Subballast and Subgrade
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.3.3 Ballast Specification

Formerly Geo Rail Chapter 6.3 — Railroad Track Subgrade: Special Topics

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests.
Authors: Daniel P. Colwell and Mario Ruel
2.3.3 Ballast Specification
2.3.3.1 AREMA Ballast Gradations

AREMA MRE Chapter 1, Table 1-2-2 defines the standard ballast gradations. Numbers 24, 25, 3, 4A and 4 are main-line gradations; Numbers 5 and 57 are yard gradations. Two of the main-line gradations:

Table 2.3-2. AREMA Ballast Gradations No. 4 and No. 24 (after AREMA MRE Ch. 1, Table 1-2-2)
Sieve SizeAREMA No. 4, 1½–¾ in. (% Passing)AREMA No. 24, 2½–¾ in. (% Passing)
3 in.—100
2½ in.—90–100
2 in.100—
1½ in.90–10025–60
1 in.20–55—
¾ in.0–150–10
½ in.—0–5
⅜ in.0–5—

AREMA No. 24 (2½–¾ in.) and No. 4A (2–¾ in.) are the coarser main-line gradations commonly used for heavy-axle freight. No. 4 (1½–¾ in.) is the smallest main-line gradation. Confirm the gradation against the owner railroad's specification.

2.3.3.2 Ballast Quality Requirements

Per AREMA Chapter 1, Part 2, Table 1-2-1 (Section 2.3.3):

  • Los Angeles abrasion (degradation): ≤ 25% to 40% by rock type (traprock 25%; quartzite, limestone and dolomitic limestone 30%; granite 35%; blast furnace slag 40%). Owner railroads often set tighter limits for main track.
  • Sodium sulfate soundness (5 cycles, ASTM C88): ≤ 5.0%
  • Flat and/or elongated particles (ASTM D4791): ≤ 5.0%
  • Material passing No. 200 sieve (ASTM C117): ≤ 1.0%
  • Clay lumps and friable particles (ASTM C142): ≤ 0.5%
  • Absorption (ASTM C127): ≤ 1.0% for granite, traprock and quartzite; 2.0% for limestones and steel furnace slag; 5.0% for blast furnace slag
  • Bulk specific gravity (ASTM C127): ≥ 2.60 for natural rock

These requirements vary by owner railroad. Confirm them against the owner railroad's current standards when the work is scoped, and record the edition used.

Screening a ballast source beyond LA Abrasion

Petrography first. A thin-section examination flags rock that will break down in track whatever the index tests say. Selig and Waters list these “fatal flaws” (after Watters et al.):

  • High content of soft minerals (clay, mica, chlorite).
  • Argillaceous sedimentary rock (mudstone, shale).
  • Mica-rich metamorphic rock (slate, phyllite, schist).
  • Igneous rock with altered feldspar.
  • Sulfide content above 2–3%; pyrite oxidizes to acid.
  • Poor consolidation, or porosity above 5%.
  • Vesicular volcanics.
  • Friable crystalline rock.
  • Closely spaced joints, bedding or foliation.
  • Smooth particle surfaces, or tabular or elongated particles.

Abrasion tests measure different things.

  • LA Abrasion measures toughness. Its fines are mostly coarser than the No. 200 sieve.
  • Mill Abrasion (wet, 10,000 revolutions) measures hardness. Over 90% of its fines pass the No. 200 sieve, which is closer to what track produces.
  • The railroad combines the two as the Abrasion Number, AN = LAA + 5 × MA. The railroad pairs AN with gradation to estimate ballast life in MGT.

In an AAR test on a Class I railroad at about 300 MGT per year, fouling (minus No. 4) grew 0.4–0.6% per year, and 75–90% of it came from ballast breakdown. Fouling correlated with AN.

Aggregate Testing
Aggregate Testing

Shape. AREA adopted the Corps definitions in 1986: flat means thickness ÷ width < 1/3, and elongated means length ÷ width > 3, with a limit of 5% by weight. Flaky, angular particles raise shear strength, but they also break more, accumulate more permanent strain and lower stiffness.

Gradation. In laboratory tests, uniform ballast (Cu 1.14) showed about twice the plastic strain and 4–5 times the degradation of a broader gradation (Cu 4.1). The broader grading is stronger and settles less. But it has less void space to store fines, it can segregate, and it is more susceptible to fouling. The railroad ranks coarse uniform gradations best for fouling life, then fine uniform, then broad. The book finds no basis for a single optimum size. Durability and room to store fines govern.

Other indicators. Higher specific gravity goes with durability. Low absorption goes with weathering resistance. Higher rodded unit weight goes with lateral stability. Where limestone or other soft stone sits in wet track, a wet attrition (Deval) test is worth requesting. British Rail limited it to 4%.

After Selig & Waters (1994), chs. 3, 7 and 8. Full reference under Supplemental References.

Supplemental reference

Additional ballast quality screens

Section 2.3.3.2 gives the AREMA limits. Li et al. (2016) add two screens that are worth requesting when qualifying a new quarry: the Mill Abrasion test (Selig & Waters, 1994), which wears the stone in water and is more sensitive than LA Abrasion to the soft, clay-bearing rocks that turn to mud in track, and petrographic analysis of the parent rock. The railroad's limits show how far a freeze–thaw railroad tightens the AREMA values:

Table 2-S2. AREMA vs. Class I railroad ballast limits (Li et al., 2016, Table 3.3)

TestProcedureAREMAClass I railroad
Los Angeles AbrasionASTM C53535% max.45% max. (paired with Mill Abrasion)
Mill AbrasionSelig & Waters (1994)–9% max.
AbsorptionASTM C1271.0% max.0.5% max.
Sulfate soundnessASTM C885.0% max.1.0% max. (mainline)
Los Angeles Abrasion Test for Aggregate
Los Angeles Abrasion Test for Aggregate

Table 2-S3. Rock properties that lead to poor ballast performance (after Watters et al., 1987)

Rock propertyDeterioration problem
Soft minerals (e.g., clay shale)Rapid wear and crushing
Minerals that weather or deteriorate rapidlyWeathering of the stone in track
Poorly consolidated textureRapid abrasion
High porosityFreeze–thaw deterioration
Smooth particle surfacePoor stability
Long, flat particle shapePoor stability; breakage of elongated pieces

Li et al. recommend petrographic analysis of the parent rock whenever a new source is being qualified, because it shows secondary minerals and textures that the index tests can miss.

Source: Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press / Taylor & Francis

European ballast categories (EN 13450) for comparison with AREMA

The European standard designates ballast by a pair of sieve sizes, 1¼ in. lower and 2 in. or 2½ in. upper, and lets the supplier declare a category for each property. The Los Angeles test is the reference hardness test (in the EN version: 22-lb sample, 1,000 revolutions at 31–33 rpm). Many older regulations simply require LA < 25.

Figure 2.3-17. Gradation of railway ballast by grading category, EN 13450 (1¼–2 in. and 1¼–2½ in.). Profillidis Table 12.2.
Figure 2.3-17. Gradation of railway ballast by grading category, EN 13450 (1¼–2 in. and 1¼–2½ in.). Profillidis Table 12.2.
Table 2.3-9. EN 13450 ballast categories by Los Angeles and Micro-Deval coefficient
Los Angeles coefficientCategoryMicro-Deval coefficientCategory
≤ 12LARB12≤ 5MDERB5
≤ 14LARB14≤ 7MDERB7
≤ 16LARB16≤ 11MDERB11
≤ 20LARB20≤ 15MDERB15
≤ 24LARB24> 15declared
> 24declared
Table 2.3-10. EN 13450 limits on fines, fine particles and flakiness
PropertyCategory limits
Fine particles (passing No. 35)A: 0.6%  ·  B: 1.0%  ·  declared > 1.0%
Fines (passing No. 230)A: 0.5%  ·  B: 1.0%  ·  C: 1.5%  ·  declared > 1.5%
Flakiness index≤ 15, ≤ 20, ≤ 35, declared > 35
Shape index≤ 10, ≤ 20, ≤ 30, 5–35, declared > 30
Particles ≥ 4 in. long (sample > 88 lb)A: 4%  ·  B: 6%  ·  C: 8%  ·  D: 12%

Deval requirements in older regulations range from a coefficient greater than 12 (limestone) or 14 (hard rock) to greater than 16, which may exclude limestone and push a railway toward granite. French practice requires the LA and Deval results to plot together inside an acceptance band (Figure 2.3-18).

Figure 2.3-16. Typical gradation of normal ballast with “excellent” and rejection limits, French regulations. Profillidis Fig. 12.1.
Figure 2.3-16. Typical gradation of normal ballast with “excellent” and rejection limits, French regulations. Profillidis Fig. 12.1.
Figure 2.3-18. Acceptable combination of Los Angeles and Deval coefficients, French regulations. Profillidis Fig. 12.5.
Figure 2.3-18. Acceptable combination of Los Angeles and Deval coefficients, French regulations. Profillidis Fig. 12.5.

After Profillidis (2014), §12.2–12.4, Tables 12.2–12.9, Figs. 12.1, 12.5; after EN 13450 (2002). Full reference under Supplemental References.

Ballast shoulder, crib fill and lateral track resistance

Lateral (transverse) track resistance has three parts: friction under the tie (proportional to tie weight), friction along the tie sides from crib ballast, and passive resistance at the tie ends from the shoulder. The crib component is about 40–50% of the total for timber ties, 30% for monoblock concrete and 15–25% for twin-block ties, so under-filled cribs cost timber track the most.

Figure 2.3-22. Lateral resistance by tie type (timber, steel, monoblock, twin-block). Profillidis Fig. 13.7.
Figure 2.3-22. Lateral resistance by tie type (timber, steel, monoblock, twin-block). Profillidis Fig. 13.7.
Figure 2.3-47. Exposed tie ends with no standard shoulder: a lateral-restraint deficiency.
Figure 2.3-47. Exposed tie ends with no standard shoulder: a lateral-restraint deficiency.
  • Widening the shoulder and heaping it above tie level gives more resistance than widening alone; the shoulder slope matters less (Figure 2.3-20).
  • Immediately after tamping, lateral resistance is about 50% of its stabilized value. It is almost fully recovered after about 2 million tons of traffic; dynamic stabilization and crib compaction shorten the recovery (Figure 2.3-21).
  • Fully stabilized twin-block concrete track resists more than twice as much as timber; monoblock concrete sits between. Lengthening ties from 8 ft to 8.5 ft (German practice) added 15–20%. Hard, smooth tropical-hardwood ties give about 15% less than other timber; grooving their seat adds 20–25%.
  • Closer tie spacing slightly lowers resistance per tie but raises it per unit length of track.
Figure 2.3-19. Tie end, ballast shoulder width c and shoulder heap height h. Profillidis Fig. 13.2.
Figure 2.3-19. Tie end, ballast shoulder width c and shoulder heap height h. Profillidis Fig. 13.2.
Figure 2.3-20. Lateral resistance vs. shoulder width c, with and without a heaped shoulder. Profillidis Fig. 13.3.
Figure 2.3-20. Lateral resistance vs. shoulder width c, with and without a heaped shoulder. Profillidis Fig. 13.3.
Figure 2.3-21. Recovery of lateral resistance after maintenance vs. traffic, with and without crib compaction. Profillidis Fig. 13.6.
Figure 2.3-21. Recovery of lateral resistance after maintenance vs. traffic, with and without crib compaction. Profillidis Fig. 13.6.

These numbers explain why slow orders follow surfacing and undercutting, and why shoulder width and crib fill should be checked wherever a ground-hazard repair has disturbed the ballast section.

After Profillidis (2014), §13.3–13.6, Figs. 13.2, 13.3, 13.6, 13.7. Full reference under Supplemental References.

The six functions of ballast and what good ballast requires

Ballast does six jobs: drainage, load distribution, vertical stiffness, longitudinal hold, lateral hold, and making surfacing practical. Failure of a function shows in the geometry: 2.5 in. or more of rail deflection at a joint means load distribution has failed, uneven support shows as cross-level, and ballast plowed in the direction of travel means it is too fine to hold the track. Judge ballast by digging, not by the surface.

Figure 2.3-46. Cross-level deviation, the visible symptom of uneven substructure support.
Figure 2.3-46. Cross-level deviation, the visible symptom of uneven substructure support.

Ballast shear strength comes from friction, which depends on size, angularity and interlocking. Prefer hard, dark, fine-grained extrusive rock (andesite, basalt, micro-diorite). Limestone, quartz, metamorphic rock and shale are unsuitable, and soft rock can grind into a mud spot within 2–3 years. Ballast life is roughly 200–900 MGT depending on rock type: some limestone lasts about 300 MGT, andesite about 900 MGT.

Figure 2.3-45. Angular, dark, extrusive rock: the preferred ballast material.
Figure 2.3-45. Angular, dark, extrusive rock: the preferred ballast material.

Shoulder width is a standard to enforce, not tolerate. A minimum 12-in. shoulder is what holds the ties laterally, and inadequate shoulders can contribute to derailments.

After Geotechnology for Railroaders Program, Module 3, Module 2; Module 3 §04–05, §11; after Selig & Waters (1994). Full reference under Supplemental References.

Project management · Seeley (1993)

Taking Off Ballast, Ties and Track: A Worked Example

Seeley’s chapter on measuring rail track (CESMM3 Class S) sets out conventions that carry over to North American work:

  • Supply and laying are separate items, because the owner often furnishes track materials. Track foundations (ballast) are the exception: one item covers both supplying and placing them.
  • Bottom ballast and top ballast are separate items. Bottom ballast is placed before the track is laid; top ballast is placed after.
  • No deduction for ties. The volume of top ballast is measured without deducting the space the ties occupy. The ballast rate includes boxing, trimming to line and level, and tamping.
  • Ties are counted as track length divided by tie spacing, plus one.
  • Track laying is measured along the centerline, including the length through turnouts and diamonds. Turnouts and diamonds are also enumerated by type, and curves are “extra over” items split at a radius of about 984 ft (roughly a 5.8° curve).
  • Lifting, packing and slewing existing track is enumerated, stating the track length, the maximum lift and the maximum slew.

His example is 492 ft of straight single track with ballast 10.33 ft wide, a 6-in. bottom ballast layer and about 5 in. of top ballast, timber ties at 29.5-in. centers, and 113 lb/yd rail.

Table 2-PM1. Table: Take-off for 492 ft of single track (after Seeley 1993, Example XVIII, converted to US units)

ItemCalculationQuantity
Bottom ballast492 × 10.33 × 0.49 ft92.7 CY
Top ballast (no deduction for ties)492 × 10.33 × 0.43 ft80.3 CY
Ties492 ft / 2.46 ft + 1201 each
Rail, supply only2 rails × 492 ft at 113 lb/yd18.5 tons
Track layingcenterline length492 ft
Example 2.3-4: Ballast and Tie Take-Off for Single Track

Seeley’s example, converted from metric, shows the measurement conventions in Section 2.4 applied to a short length of track. The take-off is the first step of any ballast or tie cost estimate (Chapter 3.7).

top ballast tt = 0.427 ftbottom ballast tb = 0.492 ftw = 10.34 ft (3.15 m)s = 2.46 ftL = 492.1 ft (150 m), planBottom and top ballast volumes = ? Ties = ?GivenSingle straight track L = 492.1 ftBallast width w = 10.34 ftBottom ballast 0.492 ftTop ballast 0.427 ftTie spacing 2.46 ftRequiredBottom and top ballast volumesNumber of tiesBlack = given; red = required
Given and required for Example 2.3-4.

Given

VariableValueDescription
L150 m = 492.1 ftLength of straight single track
w3.15 m = 10.34 ftBallast width
tb0.15 m = 0.492 ftBottom ballast thickness
tt0.13 m = 0.427 ftTop ballast thickness
s0.75 m = 2.46 ftTie spacing

Required

  • Bottom and top ballast volumes
  • Number of ties

Equations

  1. Eq. 1: V = L × w × t / 27 — ballast volume in cubic yards; no deduction for ties
  2. Eq. 2: N = L / s + 1 — number of ties

Steps

Step 1 · Bottom ballast (Eq. 1)
492.1 × 10.34 × 0.492 / 27
92.7 CY
↓
Step 2 · Top ballast (Eq. 1)
492.1 × 10.34 × 0.427 / 27
80.3 CY
Spot check: Metric check: 150 × 3.15 × 0.13 = 61.4 m³ = 80.3 CY.
↓
Step 3 · Ties (Eq. 2)
492 / 2.46 + 1
201 ties
↓
Solution
92.7 CY bottom ballast, 80.3 CY top ballast, 201 ties.

Solution

Bottom ballast 92.7 CY; top ballast 80.3 CY; 201 ties.

Rounded US dimensions (0.49 and 0.43 ft) give slightly different volumes; carry the unrounded conversions when checking a converted example. Top ballast is measured without deducting the ties, because the rate includes boxing and tamping around them.

For railroad work: when a geotechnical design calls for undercutting and new subballast and ballast, give the quantities in the same structure that the track contractor and the railroad’s material desk use. List separately:

  • subballast, as a compacted neat volume converted to tons
  • bottom ballast placed before the track panel goes down
  • top ballast placed after it
  • surfacing passes
  • track lift or slew, with its maximum value

State whether the ballast volume deducts the ties, and convert to tons with a unit weight measured for the actual quarry source. That way the engineer’s tonnage and the tonnage the railroad orders are computed on the same basis.

Source: Seeley, I. H. (1993). Civil Engineering Quantities, 5th ed. Basingstoke: The Macmillan Press, pp. 237–241. Summarized and paraphrased. Full reference under Supplemental References.

← Previous · 2.0 The Underworld Chapter 2.2 — Soil and Rock Classification
Next · 2.0 The Underworld → Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction