Formerly Geo Rail Chapter 6.3 — Railroad Track Subgrade: Special Topics
A Class I railroad main line on concrete ties carries Cooper E-80 loading. The track section has 14 in. of ballast over 8 in. of subballast, and the railroad uses a dynamic load factor of 1.3. The engineer must find the dynamic wheel load, the effective loaded area at the top of subgrade and the vertical stress on the subgrade.
The same spreading method as Example 2.3-1, for a thinner section and a lower dynamic factor.
| Variable | Value | Description |
|---|---|---|
| Pw | 40,000 lb | Cooper E-80 wheel load |
| DLF | 1.3 | Dynamic load factor |
| d | 14 in. + 8 in. = 1.833 ft | Ballast plus subballast |
| Bt | 0.917 ft (11 in.) | Concrete tie width |
| Lt | 8.5 ft | Tie length |
| θ | 35° (tanθ = 0.700) | Load spread angle through the granular layers |
(a) Pd = 52,000 lb. (b) Aeff = 38.5 ft². (c) σs = 1,349 psf (0.67 tsf).
Whether 1,349 psf is acceptable depends on the subgrade strength, which is the subject of the next question.
A Class I railroad main line has been losing surface over a clay subgrade where vane tests found the undrained strength shown. Under the existing section the effective area at subgrade level is 42 ft². The engineer must check whether the subgrade is adequate for cyclic loading and, if not, find the granular thickness that would make it adequate.
A stiffer subgrade than Example 2.3-1, with the same section. The question runs the adequacy check and, because the check fails, solves for the thickness that would pass.
| Variable | Value | Description |
|---|---|---|
| su | 500 psf | Undrained strength from vane tests |
| Pw | 40,000 lb | Static wheel load |
| Aeff | 42.0 ft² | Effective area for the existing section |
| FS | 3.0 | For cyclic loading |
| Bt | 0.917 ft (11 in.) | Concrete tie width |
| Lt | 8.5 ft | Tie length |
| θ | 35° (tanθ = 0.700) | Load spread angle through the granular layers |
(a) 952 psf. (b) 857 psf. (c) Not adequate. (d) d = 2.22 ft (27 in.); use 30 in.
Rounding up to 30 in. allows for placement tolerance and for ballast that will foul over time. The required thickness grows fast as the subgrade weakens: at su = 350 psf (Example 2.3-1) it was 37 in.
Track geometry has been deteriorating on a Class I railroad main line, and a ballast sample was taken from the crib. The gradation gave the percentages passing the No. 4 and No. 200 sieves shown. The engineer must compute the Fouling Index, classify the ballast and recommend maintenance action.
| Variable | Value | Description |
|---|---|---|
| P4 | 17.5% | Passing the No. 4 sieve |
| P200 | 4.2% | Passing the No. 200 sieve |
| Classes | Table 2.3-5 | Fouled: FI 20 to 40 |
(a) FI = 21.7. (b) Fouled. (c) Schedule ballast cleaning (undercutter-cleaner), and investigate the subgrade with borings if track geometry defects are present.
Cleaning restores drainage, but if the fines are coming up from a pumping subgrade they will return. Fines that match the subgrade soil, rather than ballast breakdown, are the sign to look below.
A Class I railroad main line with 136 RE rail runs on soft track with a modulus of 2,500 psi. The engineer must find the characteristic length of the rail and the maximum bending moment under a 40,000-lb wheel, and explain what soft track does to rail stress.
| Variable | Value | Description |
|---|---|---|
| I | 95.0 in.4 | 136 RE rail |
| E | 30 × 106 psi | Steel |
| u | 2,500 psi | Track modulus |
| Pw | 40,000 lb | Wheel load |
(a) l = 46.2 in. (b) Mmax = 462,000 in.-lb (38,500 ft-lb).
Softer track (lower u) gives a longer characteristic length and so a larger moment: the rail spans further between effective supports. Compare Example 2.3-7, where u = 3,000 gives l = 44.1 in.
A hi-rail GPR survey on a Class I railroad main line recorded a strong reflector at a two-way travel time of 8.5 ns, and the ballast is estimated to have the dielectric constant shown. The design section has the ballast and subballast interface at 24 in. The engineer must convert the travel time to depth and say whether the result agrees with the design section.
GPR measures travel time, not depth. The depth depends on the wave velocity, which depends on the dielectric constant of the ballast, and the dielectric constant rises as the ballast fouls and holds water.
| Variable | Value | Description |
|---|---|---|
| t | 8.5 ns | Two-way travel time to the reflector |
| εr | 6.5 | Estimated relative dielectric constant of the ballast |
| c | 0.984 ft/ns | Speed of light |
| Design | 24 in. (2.0 ft) | Expected ballast/subballast interface depth |
(a) v = 0.386 ft/ns. (b) d = 1.64 ft (19.7 in.). (c) The reflector is about 4 in. shallower than the design interface.
Either the ballast has settled or the section was built thin. The depth also depends on the assumed dielectric constant: had the ballast been more fouled than assumed, the true depth would be shallower still. A correlation boring or test pit at the station calibrates the dielectric constant and confirms the layer thicknesses.