↑ Parent Menu⌂ Main Menu
← Chapter 2.3 Track Substructure: Ballast, Subballast and Subgrade
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

Empirical Equations — Use and Limitations

Formerly Geo Rail Chapter 6.3 — Railroad Track Subgrade: Special Topics

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests.
Authors: Daniel P. Colwell and Mario Ruel
Empirical Equations — Use and Limitations

The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.

IDCorrelationGives
IS-18Shear-wave velocity from CPTVₛ
RK-10UCS from point load indexσ꜀
IX-13Small-strain shear modulus (Hardin)G_max
IS-07Undrained shear strength of clay from SPTSᵤ
IX-05Secondary compression ratioC_α
← Previous · 2.0 The Underworld Chapter 2.2 — Soil and Rock Classification
Next · 2.0 The Underworld → Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction