2.3.10 Client-Specific Subgrade Requirements

Formerly Geo Rail Chapter 6.3 — Railroad Track Subgrade: Special Topics

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests.
Authors: Daniel P. Colwell and Mario Ruel
2.3.10 Client-Specific Subgrade Requirements
Table 2.3-7. Track Subgrade Design Requirements
RailroadMin. Ballast Depth (in.)Min. Subballast (in.)Blanket LayerGPR Required?FI ThresholdGoverning Std.
AREMA Min.106Per designCase-by-caseFI > 20AREMA MRE Ch. 1

Owner railroads may set different values. Confirm them against the owner railroad's current standards when the work is scoped.