↑ Parent Menu⌂ Main Menu
← Chapter 2.3 Track Substructure: Ballast, Subballast and Subgrade
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.3.5 Subgrade Failure Modes

Formerly Geo Rail Chapter 6.3 — Railroad Track Subgrade: Special Topics

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests.
Authors: Daniel P. Colwell and Mario Ruel
2.3.5 Subgrade Failure Modes
2.3.5.1 Progressive Shear Failure

Progressive shear occurs when σ_s exceeds the undrained shear strength of the subgrade, typically in saturated fine-grained soils under repeated loading. Manifests as pumping, subgrade mud, and progressive track settlement.

Figure 2.3-55. A subgrade cavity, invisible until it fails.
Figure 2.3-55. A subgrade cavity, invisible until it fails.

FS against progressive shear:

FS_shear = (π + 2) × s_u / (DLF × σ_s_static) ≥ 3.0 (this manual's target for cyclic loading; not an AREMA requirement)

where s_u = undrained shear strength of subgrade (psf); σ_s_static = static stress at top of subgrade (psf).

Progressive shear (cess heave): signs, monitoring and repair

Mechanism. Repeated overstress at the top of a soft, fine-grained subgrade remolds the soil and squeezes it sideways and upward beside the track. It heaves the cess (the area beside the track) and leaves a depression under the ties. The heave then walls off the side drainage, raises the water table under the track and speeds up the failure. Segmented tubing columns installed through the shoulder show whether the heave is still active.

Massive shear needs much higher stress than progressive failure. It usually happens when strength drops because of water, such as heavy rain or flooding, sometimes with no train present.

What does not work.

  • Dumping ballast into the sag deepens the granular layer locally, but the depression in the subgrade stays and becomes a water trap.
  • A general ballast lift, where clearances allow, adds stability for heavier axles. It does not restore a site that has already failed, because the deformed subgrade surface keeps ponding water.

Repair. Remove the ballast and excavate the failed subgrade to a lower, regular surface sloped to drain. Rebuild with subballast or blanket and clean ballast to the depth from Section 2.3.4.2, and restore the side drainage. The two preventive measures are adequate granular depth and drainage that keeps the water table low.

After Selig & Waters (1994), ch. 10. Full reference under Supplemental References.

Inputs for the equations in this section (2)
SymbolWhat it isComes fromHow to get itTypical range
σsstaticstatic stress at top of subgrade (psf).Another equationStress increase from the applied load: Boussinesq influence factor or 2:1 distribution (settlement chapter), or the track load-spread equations.project-specific
suundrained shear strengthLab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
2.3.5.2 Ballast Pocket Formation

Ballast pockets form when fine-grained subgrade material is pumped upward through ballast voids under dynamic loading. Indicators:

  • Clay smear on ballast particles
  • Rapid track geometry degradation
  • High fouling index (see Section 2.3.6)
  • Positive mud in standpipe piezometers

Prevention: Properly designed subballast filter layer; maintain drainage; GPR monitoring.

2.3.5.3 Differential Frost Heave

Ice lens formation in frost-susceptible subgrade causes differential heave across a cross-section or along the track. Railroads in seasonal-frost regions commonly experience frost heave problems.

Differential heave threshold: FRA 49 CFR Part 213 (§213.63) limits the deviation from uniform profile on either rail to 2 in. at the midordinate of a 62-ft chord for Class 4 track (1¼ in. for Class 5).

Design mitigation:

  • Use non-frost-susceptible blanket layer (USACE FS-0 or FS-1 material) of sufficient thickness to keep the 32°F isotherm above natural subgrade
  • Required blanket thickness determined from modified Berggren equation (see Chapter 7.3, Section 7.3.6)

Frost: three conditions, and the subballast fines limit

Frost heave needs freezing temperatures, a supply of water and a frost-susceptible soil, all at once. Remove any one and heave stops. Ice lenses can heave the ground by much more than the roughly 10% volume increase of freezing water alone. On thaw, the released water softens the subgrade and geometry is lost quickly.

How susceptible the soil is depends on its type:

  • Silts are the most susceptible.
  • Clays are next.
  • Clean sands and gravels are not susceptible.

Ballast and subballast insulate the subgrade, and the required thickness is usually set by local experience. Where frost and water reach the subballast, keep its fines below about 5%. On a frost-susceptible embankment over a shallow water table, a geomembrane placed above the water table and below the maximum frost depth can cut off capillary supply (Chapter 7.2).

After Selig & Waters (1994), chs. 9 and 12. Full reference under Supplemental References.

2.3.5.4 Subgrade Attrition

Repeated cyclic loading degrades the subgrade surface through abrasion, generating fines that contaminate ballast. Most common in granular subgrades under high-axle-load traffic. Prevent with properly graded subballast and geotextile separator.

Attrition and pumping: diagnose correctly, and do not rely on fabric alone

Where it occurs. Selig and Waters tie subgrade attrition to ballast bearing on hard fine-grained soil (stiff clay) or soft rock (chalk, mudstone, shale) with standing water at the subgrade surface. The ballast grinds the surface into a slurry, and traffic pumps the slurry up to the tie, often at rail joints. The slurry then blocks the drains. This is a narrower setting than the general description above, and it matters when choosing the remedy.

Look-alikes. Ballast and tie wear in wet conditions, and plain dirty ballast, also produce mud at the surface. Before choosing a fix, compare the fines in the slurry with the subgrade, checking plasticity, color and mineralogy.

What fixes it. Two measures together:

  • A sand blanket or subballast that meets the filter criteria in Section 2.3.4.1.
  • Drainage that keeps water below the ballast–subgrade interface.

Ballast cleaning alone gives only temporary relief. British Rail made attrition failures rare by blanketing.

The record on geotextiles.

  • In laboratory pumping tests, clay pumped through every geotextile tested, including fabrics sold for this purpose.
  • At Conrail’s Pottstown site (clay-rich mudstone, water at tie bottom), slurry came through the fabric and mud boils reached the surface within 2 years at about 15 MGT per year.
  • At British Rail’s Fenny Compton trial, 2 in. of sand under geotextile and geogrid kept the ballast clean for 3 years. A geotextile plus geomembrane with no sand was the worst performer.

Design point: a sand blanket stops clay pumping, and fabric alone does not.

After Selig & Waters (1994), chs. 10 and 12. Full reference under Supplemental References.

Supplemental reference

The full family of subgrade problems

Sections 2.3.5.1–2.3.5.4 cover four subgrade problems; Li et al. recognize ten. Li et al. group them by what drives them — dead load, live (train) load, or the environment — which is a useful way to tie field symptoms back to a cause before selecting a remedy.

Figure 2.3-50. A mud hole is a substructure symptom; the cause lies below.
Figure 2.3-50. A mud hole is a substructure symptom; the cause lies below.

Table 2-S6. Characteristics of track subgrade problems (Li et al., 2016, Table 3.9)

CauseTypeContributing factorsField features
Dead loadMassive shear failureWeight of train, track and subgrade; inadequate soil strengthHigh embankments and cut slopes; often triggered by a rise in water content
Dead loadConsolidation settlementEmbankment weight; saturated fine-grained soilsIncreased static stress vs. pre-construction
Live loadSubgrade attritionBallast bearing directly on hard subgrade; clay-rich rock or soil; waterMuddy ballast; missing or inadequate subballast
Live loadCyclic mobility / liquefactionRepeated loading of saturated silt and fine sandLarge displacement; worse with vibration; can occur in subballast
Live loadProgressive shear failureRepeated overstressing of wet fine-grained soilSqueezing at subgrade surface; heave in crib or shoulder; depression under ties
Live loadCumulative plastic deformationRepeated loading of soft or loose soilDifferential settlement; ballast pockets
EnvironmentFrost actionFreezing temperatures, free water, frost-susceptible soilRough surface in winter/spring
EnvironmentSwelling / shrinkageHigh-plasticity soil with changing moistureRough track surface
EnvironmentSlope erosionSurface and subsurface water; windSoil washed or blown away
EnvironmentSoil collapseWater inundation of loose depositsGround settlement
Figure 2.3-51. Subgrade deformation beneath track.
Figure 2.3-51. Subgrade deformation beneath track.
Figure 2.3-57. End of winter: a series of ice lenses at the base of the embankment.
Figure 2.3-57. End of winter: a series of ice lenses at the base of the embankment.
Figure 2.3-59. A water-filled ballast pocket, the source of about 25% of frost heaves.
Figure 2.3-59. A water-filled ballast pocket, the source of about 25% of frost heaves.
Figure 2.3-60. Spring silt liquefaction: pale wet silt pushed up through the ballast.
Figure 2.3-60. Spring silt liquefaction: pale wet silt pushed up through the ballast.

Usman et al. (2015) add a drainage-focused view: most live-load failures on fine-grained subgrade start with water retained in the track section (fouled ballast, blocked ditches, clogged pipe drains), which softens the clay, lowers its strength and bearing capacity, and leads to shear/plastic deformation and ballast pockets. Their cause-and-effect chart (Figure 2-S4) is a practical checklist for tracing a wet spot back to the drainage element that failed. UK surveys cited in the paper found an average of about five wet spots per mile of track.

Cause-and-effect chart linking flooding, precipitation, fouling and drainage deficiencies to clay subgrade softening and progressive shear / plastic deformation.
Supplemental Figure 2-S4. Cause-and-effect chart linking flooding, precipitation, fouling and drainage deficiencies to clay subgrade softening and progressive shear / plastic deformation. Source: Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0), p. 551.

Source: Li, D., Hyslip, J., Sussmann, T. and Chrismer, S. (2016). Railway Geotechnics. CRC Press / Taylor & Francis · Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0)

Progressive shear failure: the subgrade surface is sheared and remolded by cyclic overstress and squeezes outward and upward along the path of least resistance (after Li and Selig).
Supplemental Figure 2-S1. Progressive shear failure: the subgrade surface is sheared and remolded by cyclic overstress and squeezes outward and upward along the path of least resistance (after Li and Selig). Source: Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0), p. 548.
Excessive subgrade plastic deformation forming a ballast pocket that traps water beneath the track.
Supplemental Figure 2-S2. Excessive subgrade plastic deformation forming a ballast pocket that traps water beneath the track. Source: Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0), p. 549.
Wet spot with mud pumping through the ballast — the typical surface expression of subgrade attrition and fouling.
Supplemental Figure 2-S3. Wet spot with mud pumping through the ballast — the typical surface expression of subgrade attrition and fouling. Source: Usman, K., Burrow, M. and Ghataora, G. (2015). “Railway track subgrade failure mechanisms using a fault chart approach.” Procedia Engineering 125, 547–555 (open access, CC BY-NC-ND 4.0), p. 549.

Cyclic loading: when subgrade plastic strain stops stabilizing

For soils, fatigue shows up as accumulating plastic strain rather than sudden fracture. Repeated-load triaxial tests on clays (Figure 2.3-25) use R, the ratio of the first-cycle deviator stress to the deviator stress that causes failure. Above R ≈ 0.9, plastic strain increases very rapidly with the number of cycles. Below it, strain grows roughly with log N and levels off. The runaway behavior was observed in S0 and S1 subgrades.

Figure 2.3-25. Plastic strain εp in clay vs. number of loading cycles N for stress ratios R = 0.67 to 1.03. Profillidis Fig. 9.7.
Figure 2.3-25. Plastic strain εp in clay vs. number of loading cycles N for stress ratios R = 0.67 to 1.03. Profillidis Fig. 9.7.

For the effect of traffic on subgrade stress the book uses Dormon’s rule from highway practice: σ1/σ2 = (N2/N1)λ, with λ ≈ 0.2. For two lines with the same axle load, the allowable subgrade stress therefore scales with (T2/T1)0.2: doubling tonnage lowers the allowable stress by about 13%.

Subgrade fines can also migrate upward. Figure 2.3-26 shows the combinations of plasticity index and liquid limit for which strong infiltration of subgrade fines into a gravel subballast was observed. It is a useful screen when deciding whether a separation geotextile or sand blanket is needed.

Figure 2.3-26. PI–LL zone in which strong infiltration of subgrade fines into the gravel subballast was observed. Profillidis Fig. 9.19.
Figure 2.3-26. PI–LL zone in which strong infiltration of subgrade fines into the gravel subballast was observed. Profillidis Fig. 9.19.

After Profillidis (2014), §9.8, §9.10, §9.15.2, Figs. 9.7, 9.19. Full reference under Supplemental References.

Frost index and frost-protection thickness

The frost index is the time integral of below-freezing temperature (°F × hours or °F × days). A railway must choose whether to design for the coldest winter or for an average winter and accept occasional frost penetration. Silt is very frost-susceptible, clay is susceptible, and sand and gravel are not.

Table 2.3-14. Frost index design level and expected exceedance
Frost indexProbability of freezing throughExpected number of underratings
F250%1 in a 2-year period
F520%1 in a 5-year period
F1010%1 in a 10-year period
F1001%1 in a 100-year period

The required frost-protection layer under 14 in. of ballast increases with frost index and depends on the material (gravel needs the most, peat/bark the least; Figure 2.3-27). A foam-plastic insulation board 2–4 in. thick sharply reduces the required thickness (Figure 2.3-28). On existing track, frost protection is normally installed at renewal using one of four details: a gravel or cinder layer, stone with a peat filter, foam plastic, or insulation over a frost-storage bottom layer.

Figure 2.3-27. Thickness of frost-protection layer under 14 in. of ballast vs. frost index, for gravel, cinders and peat/bark. Profillidis Fig. 9.8.
Figure 2.3-27. Thickness of frost-protection layer under 14 in. of ballast vs. frost index, for gravel, cinders and peat/bark. Profillidis Fig. 9.8.
Figure 2.3-28. Thickness of frost-protection layer under 10 in. of ballast with 50- or 4-in. foam-plastic insulation. Profillidis Fig. 9.9.
Figure 2.3-28. Thickness of frost-protection layer under 10 in. of ballast with 50- or 4-in. foam-plastic insulation. Profillidis Fig. 9.9.
Figure 2.3-30. Frost protection on existing track: gravel or cinder layer (min. 31 in., 13 ft wide). Profillidis Fig. 9.10.
Figure 2.3-30. Frost protection on existing track: gravel or cinder layer (min. 31 in., 13 ft wide). Profillidis Fig. 9.10.
Figure 2.3-31. Frost protection with foam plastic. Profillidis Fig. 9.12.
Figure 2.3-31. Frost protection with foam plastic. Profillidis Fig. 9.12.
Figure 2.3-32. Insulation combined with a drainage layer and frost-storage bottom layer. Profillidis Fig. 9.13.
Figure 2.3-32. Insulation combined with a drainage layer and frost-storage bottom layer. Profillidis Fig. 9.13.

After Profillidis (2014), §9.11, §12.5.2, Table 9.6, Figs. 9.8–9.13, 12.6. Full reference under Supplemental References.

Mud spots, cavities and silt pumping: diagnosing what is below

Before touching a mud spot, ask what kind it is and how deep the problem goes. The cause is usually ballast degradation, subgrade liquefaction and pumping, plastic deformation, subgrade failure, or poor drainage. The fix ranges from tamping (temporary) to undercutting or reinforcing the subgrade (durable). One railroad spent nearly $10M in a year on mud spots and wasted about 90% of it treating symptoms. On another system, over 95% of a $200M+/year ballast budget went into the upper 20 in. of the structure.

Figure 2.3-54. Excavation showing a mud-spot failure zone far larger than the surface symptom.
Figure 2.3-54. Excavation showing a mud-spot failure zone far larger than the surface symptom.

On a steep embankment, uncorrected ballast pockets can become a slope failure. In one silt-pumping case, an investigation trench beside sinking track showed silt rising as the track went down. The fix was filter cloth, gravel backfill and deeper ditches, which addressed the water path rather than the sinking.

Figure 2.3-53. Investigation trench with silt rising as the track sank.
Figure 2.3-53. Investigation trench with silt rising as the track sank.

After Geotechnology for Railroaders Program, Module 3; §02, §09, §11. Full reference under Supplemental References.

Frost heave and spring silt liquefaction: field mechanism and remedies

Frost heave needs five conditions at once: saturated soil, frost-susceptible soil (silt), sub-zero temperature, a slowly advancing freezing front, and a water supply from below. Remove any one and it cannot occur. About 75% of heave problems trace to poorly maintained ditches and about 25% to poor ballast drainage (ballast pockets), even on high fills. In spring, ice lenses can push the rail up several inches over 10–40 ft of track, usually by different amounts on each rail. Shimming is reactive; treat the cause.

Figure 2.3-56. Capillary water rising to the frost front, freezing into ice lenses and pushing the ground up.
Figure 2.3-56. Capillary water rising to the frost front, freezing into ice lenses and pushing the ground up.
Figure 2.3-58. Spring: rail pushed up several inches over a 10–40 ft stretch.
Figure 2.3-58. Spring: rail pushed up several inches over a 10–40 ft stretch.

Marking and salting is the most practical remedy once drainage alone is not enough. Mark the start and end of the heave tie by tie in spring, then salt in the fall; salting earlier lets rain carry the salt too deep. Provide a transition between salted and unsalted ground so a depression does not form. Other options are drainage and subdrainage, shimming, excavating and replacing silty soil, insulation and injection.

Figure 2.3-63. Salting completed: typically good for several years.
Figure 2.3-63. Salting completed: typically good for several years.

Spring silt liquefaction happens when the thawed top of a silt layer is squeezed by traffic against still-frozen ground below. Pore pressure cannot drain down, so it fractures upward and carries silt onto the shoulder. In one case cross-level moved 3–4 in. under a train. The condition clears once the frost is out. A lateral trench drain speeds recovery:

  • excavate at the point of bulging silt, down to the soft silt at the frost front, and drain any water pocket;
  • place nonwoven geotextile in direct contact with the silt;
  • backfill with free-draining angular stone compacted in lifts, which acts as a shear key; wrap the fabric over the trench about 2 ft below base of rail; finish with clean ballast sloped to a clean ditch;
  • space trenches about 15–20 ft along the weak zone; use a vacuum truck where cables are buried; record locations, since trenches may need redoing in 2–6 years.
Figure 2.3-61. Lateral trench excavated to the soft silt at the frost front.
Figure 2.3-61. Lateral trench excavated to the soft silt at the frost front.
Figure 2.3-62. Geotextile wrapped over the trench before the final ballast layer.
Figure 2.3-62. Geotextile wrapped over the trench before the final ballast layer.

After Geotechnology for Railroaders Program, Module 6.6; §02–05. Full reference under Supplemental References.

Subgrade stability first, and a screening bearing check for light-density track

If the subgrade is not stable, the track will not hold alignment, surface or cross level, however much maintenance is spent on it. Settle the subgrade before the track section. Investigate the alignment (Chapter 3.9). Design cuts, fills and subgrade preparation to AREMA Chapter 1, Part 2. Confirm soil suitability against the AREMA table of soil types and their suitability as railroad subgrade.

For cohesive subgrades, UFC 4-860-01FA sets the design bearing capacity of the track structure from the unconfined compressive strength, qu, measured at natural water content:

Table 2-S9. UFC design bearing capacity for cohesive subgrade
Annual trafficDesign bearing capacityApproximate equivalent
Less than 5 MGTqu2 su
5 MGT or more0.8 qu1.6 su

Use as a screening check only. The UFC rule was written for low-tonnage installation track. The progressive-shear check in Section 2.3.5.1 (FS ≥ 3 on (π + 2) s u ) allows a stress of about 1.7 su divided by the dynamic load factor, so the UFC rule is less conservative. Use it to screen industry, yard and light-density branch-line track. For mainline and heavy-haul track, design to Section 2.3.5.1 and the granular layer methods in Section 2.3.4.

Chemical stabilization in frost areas. Use lime or cement stabilized subgrade under track with caution in seasonal-frost areas, and only after laboratory testing that includes frost susceptibility and freeze–thaw durability (Chapter 7.2).

Figure 2.3-52. A mud “volcano”: subgrade pumping, common in cuts and high-water-table areas.
Figure 2.3-52. A mud “volcano”: subgrade pumping, common in cuts and high-water-table areas.

After UFC 4-860-01FA (2004), ch. 6, §8. Comparison with Section 2.3.5.1 added by the authors. Full reference under Supplemental References.

← Previous · 2.0 The Underworld Chapter 2.2 — Soil and Rock Classification
Next · 2.0 The Underworld → Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction