↑ Parent Menu⌂ Main Menu
← Chapter 2.3 Track Substructure: Ballast, Subballast and Subgrade
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.3.12 Representative Data Table

Formerly Geo Rail Chapter 6.3 — Railroad Track Subgrade: Special Topics

The track subgrade is the engineered foundation upon which the entire superstructure — rail, ties, ballast, and subballast — rests.
Authors: Daniel P. Colwell and Mario Ruel
2.3.12 Representative Data Table
Table 2.3-8. Track Subgrade Data Summary — Illustrative Values (hypothetical stations; σ_s static from Section 2.3.2.1 with an 11-in. concrete tie; σ_allow = 5.14 s_u / 3)
StationClientSubgrade USCSs_u (psf)CBRFId_total (in.)σ_s static (psf)σ_allow/σ_sGPR Anomaly
A+00Class ICH3501.8N/A249520.63Mud pocket
B+50Class ISC6204.218.0249521.12Moderately fouled
C+00Class IML4803.127.8249520.86Fouled zone
D+25Class ICL2901.5N/A181,2510.40Wet subgrade
E+75PassengerSP7508.59.7307551.70Moderately clean
F+00Short lineSM9006.813.7249521.62Moderately fouled
G+50Class IML4202.8N/A181,2510.58Frost lens

Material parameters and typical European cross-sections

Table 2.3-17. Average mechanical parameters used in UIC finite-element track models
MaterialE (psi)Poisson’s νc (psi)φ (°)
Poor subgrade (S1)1,7800.42.110
Medium subgrade (S2)3,5600.31.420
Good subgrade (S3)11,4000.3035
Rock subgrade (R)427,0000.221020
Ballast18,5000.2045
Gravel subballast28,4000.3035
Sand14,2000.3030

Values converted from kp/cm² by the authors (1 kp/cm² = 14.22 psi). These are model inputs from UIC test programs, not design values for a specific site.

The cross-sections below show the European layering in practice: 3–5% crossfall on the subballast and subgrade, 2:3 ballast and fill side slopes, and 12 ft track centers to the edge of the formation on a double track with drains and signal/electrification foundations at the shoulder.

Figure 2.3-40. Single track with steel ties: ballast, subballast and subgrade with 3–5% crossfall. Profillidis Fig. 12.7.
Figure 2.3-40. Single track with steel ties: ballast, subballast and subgrade with 3–5% crossfall. Profillidis Fig. 12.7.
Figure 2.3-41. Double track with monoblock concrete ties (Vmax = 155 mph). Profillidis Fig. 12.9.
Figure 2.3-41. Double track with monoblock concrete ties (Vmax = 155 mph). Profillidis Fig. 12.9.

After Profillidis (2014), §8.4.6, Table 8.2, §12.6, Figs. 12.7, 12.9. Full reference under Supplemental References.

← Previous · 2.0 The Underworld Chapter 2.2 — Soil and Rock Classification
Next · 2.0 The Underworld → Chapter 2.4 — Silts: Properties, Typical Values and Liquefaction