Formerly Geo Rail Chapter 6.3 — Railroad Track Subgrade: Special Topics
| Topic | See Also |
|---|---|
| CBR and subgrade M_r testing | Chapter 7.3 |
| Frost blanket design (Modified Berggren) | Chapter 7.3, Section 7.3.6 |
| Ground improvement for soft subgrade | Chapter 7.2 |
| Undrained shear strength from VST/CPT | Chapter 5.1 |
| Consolidation settlement of subgrade | Chapter 6.2 |
| Bearing capacity of subgrade layer | Chapter 6.1 |
| Geotechnical Special Provisions (subgrade) | Appendix C |
| Lab testing for subgrade soils | Chapter 5.2 |