Particle-Size Analysis: Sieve and Hydrometer
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources
- B.M. Das, Soil Mechanics Laboratory Manual, 6th ed. (2002): Chapters 4 and 5.
- ASTM D6913 and D7928.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell