Subsections
21Primary Reference: USACE EM 1110-1-1804, Geotechnical Investigations (January 2001); AASHTO Guide for Design of Pavement Structures (1993); AASHTO M 145-91; ASTM D1883 (CBR); ASTM D4318 (Atterberg Limits); NCHRP Project 1-37A (M_r); AREMA MRE Chapter 1 (Roadway and Ballast); FRA Track Safety Standards 49 CFR Part 213.
- 7.3.0Executive Summaryopen →
- ·Empirical Equations — Use and Limitationsopen →
- 7.3.1Background and Railroad Contextopen →
- 7.3.2Subgrade Strength Testingopen →
- 7.3.3AASHTO 1993 Flexible Pavement Designopen →
- 7.3.4AASHTO 1993 Rigid Pavement Designopen →
- 7.3.5Frost Designopen →
- 7.3.6Subgrade Preparation and Compaction Criteriaopen →
- 7.3.7Intermodal Yard Crane Rail Foundation Subgradeopen →
- 7.3.8Worked Examplesopen →
- 7.3.9Representative Data Tableopen →
- 7.3.10Reference Photographsopen →
- 7.3.11Practical Recommendationsopen →
- 7.3.12Pavement Subgrade Evaluation Checklistopen →
- 7.3.13Practice Questionsopen →
- 7.3.14Cross-Referencesopen →
- 7.3.15Case Studiesopen →
- 7.3.16Apps and Tools 21open →
- 7.3.18AASHTO 1993 Pavement Design for Crossings, Access Roads and Yardsopen →
- ·Author and Sourcesopen →
- ·Supplemental Referencesopen →
Apps
3 appsChapter 7.3 · Section 7.3.3.4HMA Trackbed Thickness CheckAllowable tensile strain and subgrade stress from the design repetitions, and the check of chart values for a trial thickness after correction factors.Chapter 7.3 · Section 7.3.18AASHTO 1993 Flexible PavementRequired structural number and layered asphalt, base and subbase thicknesses for crossings, access roads and yards.Chapter 7.3 · Section 7.3.18AASHTO 1993 Rigid PavementConcrete slab thickness from ESALs, reliability, serviceability, concrete properties, load transfer, drainage and k.