Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way — intermodal container yards, locomotive servicing facilities, maintenance-of-way (MOW) vehicle access roads, classification yard roadways, and fueling pads; and (2) the granular track substructure system — ballast, subballast, and subgrade — which functions as an engineered pavement system for track loading. Both domains require rigorous characterization of subgrade support capacity, compressibility, moisture sensitivity, and frost behavior.
This chapter provides methods for characterizing subgrade strength (CBR, M_r, k modulus), designing flexible and rigid pavement structural numbers using AASHTO 1993 methodology, evaluating frost penetration and heave potential for Class I railroad northern operations, and developing subgrade improvement recommendations for intermodal yard heavy container crane trackage. All equations are presented in English units. Railroad-client-specific pavement standards are integrated throughout.
