Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way —…
The three examples cover a flexible pavement, a rigid pavement and the seasonal subgrade modulus in a frost climate, for intermodal yards. Each is laid out as Given, Required, Equations, a flow chart of the steps with a spot check at each, and the Solution.
Example 7.3-1: Flexible Pavement for Reach Stacker Lanes
New reach stacker lanes at an intermodal yard expansion on a Class I railroad located in Kansas City, Missouri. The AASHTO 1993 equation gives the structural number the subgrade needs for the design traffic; the layers are then chosen to supply it. The example then shows how much a treated subgrade saves.
Given and required for Example 7.3-1.
Given
Variable
Value
Description
W18
8,000,000 ESALs
20-year design (assumed for illustration)
Subgrade
CL; soaked CBR = 4%; Mr = 1,500 × 4 = 6,000 psi
ZR, S0
−1.645 (R = 95%); 0.45
ΔPSI
4.2 − 2.0 = 2.2
m2, m3
0.90
Fair drainage
Treated Mr
9,000 psi
5% lime, top 12 in.
Required
Required SN
A layer section that supplies it, with and without lime treatment
Spot check: Saves 2 in. of base and 3 in. of subbase, about 56 lb/ft² of aggregate.
↓
Solution
SN = 5.07: 6 in. HMA, 10 in. base, 12 in. subbase; or 6-8-9 on lime-treated subgrade.
Solution
Required SN = 5.07. On the untreated subgrade use 6 in. HMA, 10 in. base and 12 in. subbase (SN 5.09). With the top 12 in. lime-treated, 6 in. HMA, 8 in. base and 9 in. subbase (SN 4.54) suffice.
The aggregate saved is worth roughly $0.50/ft² at an assumed $18/ton, which must be weighed against the cost of the lime treatment. Treatment also lifts the subgrade CBR above an assumed 8% minimum, which matters for construction traffic as much as for the design.
Example 7.3-2: Rigid Pavement for a Crane Runway
An RTG crane runway and reach stacker lanes at an intermodal terminal on a Class I railroad located in Winnipeg. The silty sand subgrade is frost-susceptible to a design frost depth of 8 ft and is replaced with granular material, which also raises the support for the slab.
Given and required for Example 7.3-2.
Given
Variable
Value
Description
W18
12,000,000 ESALs
ZR, S0
−1.645; 0.35
ΔPSI, pt
2.5; 2.5
Subgrade
SM, CBR 7%, F3: replaced to 8.0 ft with granular subbase
(Ec/k)0.25 = 11.76; ratio term log(3,580/3,494) = 0.0105
W18 ≈ 18.5M ≥ 12M
↓
Step 2 · D = 10 in.
W18 ≈ 10.1M < 12M
↓
Step 3 · Thickness
D = 11 in. governs
↓
Solution
11-in. doweled JPCP.
Solution
An 11-in. doweled jointed plain concrete slab (about 18.5M ESAL capacity); 10 in. carries only about 10M.
Use #5 dowels at 12 in. across transverse joints spaced at 15 ft. Replace the F3 subgrade to 8.0 ft with non-frost-susceptible granular fill (no more than 3% passing the No. 200 sieve) over a geotextile separator; without it, frost heave would break the slab regardless of its thickness.
Example 7.3-3: Frost Depth and Effective Seasonal Resilient Modulus
Access roads at a terminal on a Class I railroad located in Winnipeg. The subgrade is stiff when frozen and very soft during the spring thaw. Averaging the moduli would hide the thaw; the AASHTO relative damage method weights each month by the damage it does.
Spot check: The harmonic mean would give 3,440 psi; the two thaw months carry 83% of the damage.
↓
Solution
Zf = 7.8 ft; design Mr = 2,590 psi.
Solution
Frost penetrates about 7.8 ft, and the effective design Mr is about 2,590 psi, less than half the summer value of 5,500 psi.
Recompute SN with this value. Replacing the frost-susceptible subgrade with granular material through the frost depth removes most of the thaw weakening at the depths that matter.