↑ Parent Menu⌂ Main Menu
← Chapter 7.3 Pavement Subgrade Evaluation
GHRM
Railway Ground Hazard Risk Management · 7.0 · Design
Sections · click a car to open it

7.3.4 AASHTO 1993 Rigid Pavement Design

Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way —…
Authors: Daniel P. Colwell and Mario Ruel
7.3.4 AASHTO 1993 Rigid Pavement Design

For jointed plain concrete pavement (JPCP), the AASHTO 1993 rigid pavement design equation is:

DLC (Dry Lean Concrete)
DLC (Dry Lean Concrete)
log W18 = ZR S0 + 7.35 log(D+1) - 0.06 + log[Δ PSI4.5-1.5]1 + 1.624 × 107(D+1)8.46 + (4.22 - 0.32 pt) log[S'c ⋅ Cd (D0.75 - 1.132)215.63 ⋅ J (D0.75 - 18.42(Ec/k)0.25)]

Where:

  • D = slab thickness (in.)
  • S'_c = concrete modulus of rupture (psi); typically 600–700 psi for 4,000-psi concrete
  • C_d = drainage coefficient (0.80–1.20)
  • J = load transfer coefficient (3.2 for doweled joints; 4.4 for undoweled)
  • E_c = elastic modulus of concrete (psi); E_c = 57,000√f'_c ≈ 3.6 × 10⁶ psi for f'_c = 4,000 psi
  • k = effective modulus of subgrade reaction (pci)
  • p_t = terminal serviceability (typically 2.5 for heavy industrial)
← Previous · 7.0 Design Chapter 7.2 — Ground Improvement Methods
Next · 7.0 Design → Chapter 7.4 — Earthworks Asset Management and Remedial Design