↑ Parent Menu⌂ Main Menu
← Chapter 7.3 Pavement Subgrade Evaluation
GHRM
Railway Ground Hazard Risk Management · 7.0 · Design
Sections · click a car to open it

Author and Sources

Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way —…
Authors: Daniel P. Colwell and Mario Ruel
Author and Sources

Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.

Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.

Primary sources

Supplemental references

  • Huang, Y. H., Rose, J. G. and Khoury, C. J. (c. 1987). “Thickness Design for Hot-Mix Asphalt Railroad Trackbeds.” Proc. Association of Asphalt Paving Technologists, pp. 427–453 (scanned; text recovered by OCR)Find source ↗
  • Limburg, A. and Nielsen, D. (2019). “Fast-Tracked Pavement Maintenance Using Concrete Rubblization.” AREMA 2019 Annual Conference ProceedingsFind source ↗
  • SHRP2 R02 / GeoTechTools (2012). Geosynthetic Separation in Pavement Systems — fact sheet, design guidance and photographsFind source ↗
  • SHRP2 R02 / GeoTechTools (2012). Geocell Confinement in Pavement Systems — fact sheet, design guidance and photographsFind source ↗
  • U.S. Army Corps of Engineers (2010). PCASE 2.09 User Manual. Transportation Systems Center / ERDCFind source ↗
  • Mauduit, C., Livet, J. and Piau, J-M. (2007). “Frost Design Method for Roadways and Railways – State of the Art in France.” In Gomes Correia, A., Momoya, Y. and Tatsuoka, F. (eds.), Design and Construction of Pavements and Rail Tracks. Taylor & Francis/BalkemaFind source ↗
  • Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. CRC Press/Balkema. Case studies §6.11, §10.16, §11.7Find source ↗Library entry

File locations for these documents are listed under Supplemental References.

Project management sources

  • Bull, J. W. (ed.) (2015). Life Cycle Costing for the Analysis, Management and Maintenance of Civil Engineering Infrastructure. Dunbeath, Scotland: Whittles PublishingFind source ↗
← Previous · 7.0 Design Chapter 7.2 — Ground Improvement Methods
Next · 7.0 Design → Chapter 7.4 — Earthworks Asset Management and Remedial Design