The AASHTO 1993 design equation for flexible pavement structural number (SN) is:

Where:
Solve iteratively for SN given W₁₈, R, S₀, and M_r.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| W₁₈ | design ESAL (Equivalent Single 18-kip Axle Loads) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| ZR | standard normal deviate for reliability R (Z_R = −1.645 for R = 95% | Design criterion | Set by the owner railroad's standards, AREMA, AASHTO, USACE or the project specification. | project-specific |
| S₀ | combined standard error (typically 0.45 for flexible, 0.35 for rigid) | Design criterion | Set by the owner railroad's standards, AREMA, AASHTO, USACE or the project specification. | typically 0.45 for flexible, 0.35 for rigid |
| ΔPSI | change in present serviceability index (PSI_i − PSI_f | Design criterion | Set by the owner railroad's standards, AREMA, AASHTO, USACE or the project specification. | typically 4.2 − 2.0 = 2.2 for heavy industrial |
| Mr | subgrade resilient modulus (psi) | Lab test (or correlation) | Repeated-load triaxial (AASHTO T 307), or Mr ≈ 2,555·CBR0.64 (MEPDG). | fine-grained 3,000–14,000 psi · by USCS group |
| SN | structural number (in.) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
Where:
| Layer Material | a_i | Typical D_i (in.) | Notes |
|---|---|---|---|
| Dense-graded HMA (surface/binder) | 0.44 | 4–8 | AASHTO M 320; PG 76-22 for heavy truck |
| Emulsified asphalt treated base | 0.34 | 4–8 | Used as intermediate base layer |
| Crushed aggregate base (CAB) | 0.14 | 6–12 | AASHTO M 147; CBR ≥ 80% |
| Granular subbase (GSB) | 0.11 | 6–18 | CBR ≥ 20%; used for frost protection |
| Portland cement concrete (JPCP) | — | 8–14 | Rigid design uses k/slab thickness method |
| Cement-treated base (CTB) | 0.23 | 6–10 | Unconfined compressive strength ≥ 300 psi |
| Lime-stabilized subgrade | 0.10 | 6–12 | PI reduction to < 12 |



| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| ai | layer coefficient for each pavement layer | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| Di | layer thickness (in.) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| mi | drainage coefficient for unbound layers (1.0 for good drainage | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
Loaded container handler (reach stacker): 180,000 lb GVW; tandem steer axle ~50,000 lb; drive axle ~130,000 lb.
Treating the 130,000-lb drive axle as a tandem: ESAL_factor = (130,000/32,000)^4.0 ≈ 272 ESALs per pass (about 2,700 if treated as a single axle). A terminal handling 500 loaded container moves per day generates approximately:
The fourth-power law is unreliable this far outside the AASHO Road Test loads, so do not rely on a 10–15M ESAL total for an active terminal. Design container-handler areas with heavy-industrial methods (for example, the PCA heavy industrial or port pavement methods) using the actual wheel loads and repetitions.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| ESALfactor | intermediate value computed on this page | Another equation | Computed: ESAL_factor = ( P 18,000 )^4 (4th power law, simplified) | project-specific |
Where yard tracks, grade crossings or intermodal loading tracks share a paved area, the same layered-elastic logic used for pavements applies to the track. Huang, Rose and Khoury (University of Kentucky) developed a thickness method using the KENTRACK program and two criteria: horizontal tensile strain at the bottom of the HMA (fatigue cracking) and vertical compressive stress — not strain, as in highway practice — on top of the subgrade (permanent deformation).
Source: Huang, Y. H., Rose, J. G. and Khoury, C. J. (c. 1987). “Thickness Design for Hot-Mix Asphalt Railroad Trackbeds.” Proc. Association of Asphalt Paving Technologists, pp. 427–453 (scanned; text recovered by OCR)
Hot-mix asphalt (HMA) has been used under track since the late 1960s, first in test sections and later at turnouts, crossings, tunnels and bridge approaches. It is placed either as an underlayment, a mat beneath the ballast in place of granular subballast (the more common and usually more economical choice, because the mat can be thinner and normal surfacing still works), or as an overlayment, with ties set directly on the mat and held by cribbing aggregate (suited to light traffic, limited clearance, crossings and yards, and only on a good or improved subgrade). The thickness design by Huang, Rose and Khoury applies the same two criteria as a highway pavement.
Equation 7.3-1. Failure criteria
εt = horizontal tensile strain at the bottom of the HMA; σc = vertical stress on the subgrade (psi); E1, Es = HMA and subgrade moduli (psi); Es ≈ 1,500 CBR.
| Item | Recommendation |
|---|---|
| Load repetitions | Freight: one per loaded car, about one per 160 gross tons with empties included; transit: two per car |
| Design life | Overlayment 30 years for both criteria; underlayment 30 years fatigue, 5 years deformation (surfacing corrects it) |
| HMA modulus | From the October ground temperature at 12 in. depth (national map in the paper) |
| Subgrade modulus | Weakest (spring) condition; raise it only where a thick granular layer is placed |
| Chart corrections | Wheel load (P/33 kips), rail section, tie spacing and moduli |
The allowable strain and stress follow from the design repetitions. The strain and stress for a trial thickness are read from the charts in the paper, which were computed with the KENTRACK program for a standard case, and are multiplied by the correction factors. The trial thickness is increased until both are within the allowables. The authors present the method as conservative and as a guide until more field performance data are available.
| Case | Allowable strain | Allowable stress | Trial result |
|---|---|---|---|
| Freight, 100,000 repetitions per year, E1 200,000 psi, Es 15,000 psi | 2.11 x 10-4 | 13.1 psi | 14 in. required (paper) |
| Transit, 12.5-kip wheels, 150,000 per year, 5 in. trial | 1.86 x 10-4 | 11.7 psi | strain 1.78 x 10-4, stress 9.59 psi: 5 in. adequate |
Both allowables match the paper (2.1 and 1.86 × 10−4; 13.1 and 11.7 psi), and the 5 in. transit check reproduces 1.78 × 10−4 and 9.59 psi.
Open the HMA trackbed calculator →
Allowable tensile strain and subgrade stress from the design repetitions, and the check of chart values for a trial thickness after correction factors.
These documents are in the reference library. The method summaries above are paraphrased; equations are standard or published forms.