| Topic | Refer To |
|---|---|
| Soil classification (USCS and AASHTO) | Chapter 2.2, Sections 2.2.2–2.2.5 |
| In situ testing for M_r (PLT, DCP) | Chapter 5.1, Section 5.1.3 |
| Groundwater depth and seasonal variation | Chapter 2.8, Sections 2.8.2–2.8.4 |
| Bearing capacity under crane rail loads | Chapter 6.1, Sections 6.1.2–6.1.4 |
| Settlement under surcharge / crane loads | Chapter 6.2, Sections 6.2.3–6.2.5 |
| Ground improvement for subgrade upgrade | Chapter 7.2 |
| Subgrade compaction testing | Chapter 5.3, Sections 5.3.1–5.3.2 |
| Laboratory CBR, Proctor, Atterberg Limits | Chapter 5.2, Sections 5.2.2, 5.2.5, 5.2.6 |
| Report format for geotechnical pavement data | Chapter 8.4, Section 8.4.4 |
End of Chapter 7.3 — Pavement Subgrade Evaluation