The CBR test (ASTM D1883 — laboratory; ASTM D4429, withdrawn 2018 — field) measures resistance of a compacted soil to penetration by a standard cylindrical piston at a rate of 0.05 in./min. The CBR value is expressed as a percentage of the standard force required to penetrate a standard aggregate:

Where:
Soaked CBR (4-day immersion) is used for pavement design to simulate worst-case seasonal saturation. Unsoaked CBR may be used for check only.
| USCS Symbol | Soil Description | Typical CBR Range (%) | AASHTO Class | Suitability |
|---|---|---|---|---|
| GW, GP | Clean gravels | 40–80 | A-1-a | Excellent |
| GM, GC | Silty/clayey gravels | 20–60 | A-1-b | Good–Excellent |
| SW, SP | Clean sands | 10–40 | A-1-b, A-3 | Good |
| SM | Silty sands | 5–20 | A-2-4, A-2-6 | Fair–Good |
| SC | Clayey sands | 4–12 | A-2-6, A-2-7 | Fair |
| ML | Silt, sandy silt | 3–8 | A-4 | Poor–Fair |
| CL | Low-plasticity clay | 2–6 | A-6 | Poor |
| OL | Organic silt/clay | 1–4 | A-4, A-5 | Very Poor |
| MH | Elastic silt | 2–6 | A-5 | Poor |
| CH | High-plasticity clay | 1–4 | A-7-5, A-7-6 | Very Poor |
| OH, Pt | Organic clay/peat | < 2 | A-8 | Unsuitable |
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| CBR | California Bearing Ratio = F_measured F_standard × 100% | Lab or field test | Lab CBR (ASTM D1883, soaked) on compacted samples; field CBR (D4429); or from DCP (ASTM D6951) correlation. | CL/CH ≤ 15; sands 10–40; gravels 20–80 · by USCS group |
| Fmeasured | load required to produce 0.1-in | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| Fstandard | 1,000 psi at 0.1-in | Constant | Physical constant or standard value. | project-specific |
CBR is cheap to estimate and slow to measure. Early in a project, the boring logs and index tests are often all there is, and a defensible estimate of CBR sets the first pavement or trackbed section and decides how many CBR tests to schedule. Every correlation below is a screening tool: each was fitted to a particular soil population and test procedure, and none replaces a soaked CBR on the actual subgrade.
Why measured CBR values differ. The same soil can give very different CBR values depending on how the test was run. Before comparing a laboratory result with a correlation, or with another laboratory’s result, check the items in Table 7.3-12.
| Variable | What to check |
|---|---|
| Density | CBR is reported at an assumed in-place density, typically 90, 95 or 100% of maximum dry density from the standard (5.5-lb rammer, AASHTO T 99) or modified (10-lb rammer, AASHTO T 180) test. State which. |
| Moisture | The specimen should represent the worst likely subgrade condition: compacted at optimum or at the expected worst field moisture, then tested at once or after a 4-day soak, depending on the design method. |
| Surcharge weights | Weights on the specimen represent the overlying pavement or track section. The number used varies, and the effect is largest in granular soils. |
| Face tested | US practice tests the bottom face, because soaking softens the top. Practice that averages the top and bottom faces gives lower values. |
| Compaction method | AASHTO requires dynamic (rammer) compaction. Static or vibrating-hammer compaction, allowed elsewhere, gives different specimens. |
| In-place tests | Field tests on finished subgrade lack the mould’s confinement, and a dried surface reads high. |
CBR from plasticity. In cohesive soils CBR depends on plasticity, density and, above all, moisture. A widely used chart (Black 1962) gives saturated CBR from the plasticity index and the consistency index, CI = (LL − w)/PI. At a given PI, CBR rises steeply as CI rises, that is, as the soil gets drier relative to its liquid limit. For a partly saturated soil the chart value is multiplied by a correction factor K, where unsaturated CBR = K × saturated CBR at the same moisture content (Table 7.3-14). K is less than 1, because at the same moisture content a partly saturated soil is less dense. Regression equations from other soil populations are summarized in Table 7.3-13.
| Correlation | Soils and conditions | Use and limits |
|---|---|---|
| CBR = 21 − 16 log(OMC) + 0.07 LL | 48 fine-grained soils, all CBR < 9; OMC and LL in % | Standard deviation 1.8 CBR points. Preliminary identification only (Agarwal and Ghanekar 1970). |
| CBR = 6.54 − 0.077 OMC − 0.1 PI | Fine-grained soils, 4-day soak; OMC and PI in % | Screening (Shirur and Hiremath 2014). The same study’s equations in MDD give implausible values for typical inputs as printed and are not reproduced. |
| Suitability index S = A / (LL · log PI); soaked CBR ≈ 34.3 S − 7.15, with more than 90% of values within ±16 | Lateritic gravels compacted to maximum dry density with a 10-lb rammer; A = % passing the 2.4-mm sieve (about the No. 8) | Granular fill and borrow with fines only (de Graft-Johnson and Bhatia 1969). Wide scatter. |
| CBR ≈ 0.62 su (su in psi) | Cohesive soils; the CBR plunger treated as a small circular footing, qu = 1.2 × 5.14 su = 6.2 su, divided by the 1,000-psi standard | Close to field CBR. Laboratory values run a little higher because of the mould. Equal to CBR ≈ 0.09 su with su in kPa, or about 0.1 su as a rule of thumb. |
| CBR = 0.099 su1.7 (su in psi) | Well-graded cohesive fill (Jenkins and Kerr 1998; 0.0037 su1.7 with su in kPa) | Non-linear: about 0.076 su at 11 psi, 0.12 su at 22 psi and 0.20 su at 44 psi in the kPa form. Lower than the linear rule below about 2,000 psf (14 psi), higher above it. |
| Ev = 51 log(CBR) MPa (× 145 for psi) | Silty and clayey sands and cohesive subgrade | Plate-bearing modulus from CBR (UK airfield guidance, Defence Estates 2006; curve fit by Carter & Bentley). For comparing with plate-load or light-weight deflectometer results. |
| Ev = 3.6 CBR − 0.088 CBR1.73 + 3 MPa | Coarse-grained non-plastic subgrade | As above. The book labels the axis in MN/m²/m; the modulus from a plate test (DIN 18134) is in MN/m² (MPa), which is how it is used here. |
| Effective degree of saturation (%) | 100 | 90 | 80 | 70 | 60 | about 53 |
|---|---|---|---|---|---|---|
| K = unsaturated CBR / saturated CBR at the same moisture content | 1.0 | about 0.75 | about 0.6 | about 0.43 | about 0.3 | about 0.2 |
Values read from the published curve, fitted to London clay, brick earth and two Kenyan clays; read to about ±0.05.
Classification charts relating CBR to USCS and AASHTO groups (Carter & Bentley Figs. 7.6 and 7.7) agree broadly with Table 7.3-2 and are not repeated here.
For railroad work: Use these correlations to plan, not to design. Estimate CBR from the index tests and any shear strength measured in the borings, then schedule soaked CBR tests where the estimate is near a design threshold or where the estimates disagree. For clay subgrade under yard pavements and track, the strength-based estimate is often the most useful, because a hand vane or pocket penetrometer reading can be taken at every test pit and at proof-roll locations. Use the linear and non-linear strength relations together: where they straddle the design CBR, test before accepting the subgrade (Example 7.3-5). The plate-modulus relations let a light-weight deflectometer or plate-load test be checked against a CBR-based design; use one set of units throughout.
Source: Carter, M. and Bentley, S. P. (2016). Soil Properties and their Correlations, 2nd ed., Ch. 7, Table 7.1, Eqs. 7.2–7.10, Figs. 7.1–7.3, 7.8. Summarized and paraphrased; equations converted to US units where noted; K values read from the figure. Full reference under Supplemental References.
An intermodal yard expansion for a Class I railroad located in Ohio has a lean clay (CL) subgrade. The reach-stacker pavement was designed for a subgrade CBR of 5. Soaked CBR results will take two weeks, but the grading contractor wants to know now whether the exposed subgrade is acceptable. Hand-vane readings at the proof-roll stations average an undrained shear strength of 1,250 psf. The engineer must estimate the CBR from the strength, find the plate modulus that the light-weight deflectometer should show, and decide whether the subgrade can be accepted before the CBR results arrive.
| Variable | Value | Description |
|---|---|---|
| su | 1,250 psf = 8.68 psi | Average hand-vane undrained shear strength at the proof-roll stations |
| CBRdesign | 5 | Subgrade CBR assumed in the pavement design |
| Soil | Lean clay (CL) | Cohesive subgrade |
(a) CBR ≈ 5.4. (b) CBR ≈ 3.9. (c) Ev ≈ 37 MPa (5,400 psi) or 30 MPa (4,400 psi). (d) CBR 5 needs su of about 1,160 psf by the linear relation or 1,450 psf by the non-linear one. (e) The subgrade is borderline and should not be accepted on hand-vane strength alone.
Below about 2,000 psf the non-linear relation gives the lower CBR, and here it falls below the design value while the linear rule just passes. The practical answer is to run light-weight deflectometer tests at the proof-roll stations now, accept areas that reach about 5,400 psi, and hold the rest for the soaked CBR results. Hand-vane strength on a freshly exposed surface is also an upper bound: a wet spell before paving will lower it, and soaked CBR represents that worst case. If the soaked results come in below 5, the options are to redesign for the measured value, or to add a stabilized or granular layer (Section 7.3.6.2). Plate-modulus targets from other sources, such as the desiccated-clay case study in Section 7.3.6 that pairs CBR about 5 with 7,200 psi, use different correlations; agree one correlation with the contractor before testing starts.
The resilient modulus is the fundamental subgrade input for AASHTO 1993 pavement design and NCHRP 1-37A (Mechanistic-Empirical Pavement Design):
Where:
AASHTO T 307 laboratory testing applies a sequence of conditioning and test cycles at varying confining and deviator stresses. For preliminary design, M_r is estimated from CBR:
From Atterberg Limits (rough screening relation, not a standard; confirm by AASHTO T 307 testing):
Fine-grained resilient modulus depends on stress state, soil type and structure (compaction method), moisture and dry density. Selig and Waters give two relations for the modulus wet of optimum, with Δw = w − wopt in percentage points:
At 2 points wet of optimum these give about 0.54 and 0.63 (authors' evaluation). That is roughly a 40–45% loss of stiffness. Use a wet-season moisture when selecting design Mr for track and yard subgrade.
After Selig & Waters (1994), ch. 10. Full reference under Supplemental References.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Mr | resilient modulus = σ_d ε_r (psi) | Lab test (or correlation) | Repeated-load triaxial (AASHTO T 307), or Mr ≈ 2,555·CBR0.64 (MEPDG). | fine-grained 3,000–14,000 psi · by USCS group |
| σd | applied deviator stress (psi) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| εr | recoverable (resilient) axial strain (in./in.) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| Mr (psi) | resilient modulus = 1,500 × CBR (for CBR ≤ 10, Heukelom & Klomp 1962) | Lab test (or correlation) | Repeated-load triaxial (AASHTO T 307), or Mr ≈ 2,555·CBR0.64 (MEPDG). | fine-grained 3,000–14,000 psi · by USCS group |
| PI | plasticity index | Lab test | PI = LL − PL from Atterberg limits (ASTM D4318). | CL 7–30, CH 25–80 · by USCS group |
| w | water content | Lab test | Oven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938). | gravels/sands 3–25%, clays 15–70% · by USCS group |
| CBR | California Bearing Ratio | Lab or field test | Lab CBR (ASTM D1883, soaked) on compacted samples; field CBR (D4429); or from DCP (ASTM D6951) correlation. | CL/CH ≤ 15; sands 10–40; gravels 20–80 · by USCS group |
For rigid pavement (Portland cement concrete) design, the Westergaard modulus of subgrade reaction k (pci — lb/in.³) characterizes the support provided by the subgrade beneath the slab:
Plate load test (ASTM D1196): Apply load via 30-in. diameter bearing plate; record settlement at 0.05-in. increments:

Where p = applied pressure (psi) and δ = plate settlement (in.) at 0.05 in. of settlement (30-in. plate).
Approximate correlation from CBR (used for Table 7.3-3; not a PCA equation, and lower than k = M_r/19.4):
Correlation from M_r:
| Soil Type | USCS | CBR (%) | k (pci) | M_r (psi) | Pavement Suitability |
|---|---|---|---|---|---|
| Gravel/gravel-sand | GW, GP | 40–80 | 535–1,070 | 15,000–30,000 | Excellent |
| Sandy gravel | GM, GC | 20–50 | 267–667 | 8,000–20,000 | Good |
| Sand, gravelly sand | SW, SP | 10–40 | 133–535 | 5,000–15,000 | Fair–Good |
| Silty sand | SM | 5–20 | 67–267 | 3,500–8,000 | Fair |
| Clayey sand | SC | 4–12 | 53–160 | 3,000–5,500 | Fair |
| Silt, sandy silt | ML | 3–8 | 40–107 | 2,500–4,500 | Poor–Fair |
| Low-plasticity clay | CL | 2–6 | 27–80 | 1,500–3,500 | Poor |
| High-plasticity clay | CH | 1–4 | 13–53 | 1,000–2,500 | Very Poor |
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| p | applied pressure (psi) and δ = plate settlement (in.) at 0.1-in | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| k (pci) | CBR 0.075 (approximate for design purposes) | Field test (or correlation) | Plate load test (ASTM D1196 / AASHTO T 222), or correlation with CBR or Mr. | clays 50–200, gravels 250–500 pci · by USCS group |
The USACE PCASE desktop implements the Unified Facilities Criteria for pavements, including UFC 3-250-01 (roads, streets, walks and open storage areas) and UFC 3-250-09 (aggregate-surfaced roads). It is useful for container yards and laydown areas that fall outside AASHTO traffic assumptions. Its modules cover traffic (a vehicle database that can be edited for handlers and cranes), design by CBR or layered-elastic methods with seasonal sets and frost design, evaluation, FWD back-calculation, and a DCP module. The DCP module converts blows and penetration to CBR, k or modulus for a 17.6-lb or 10.1-lb hammer, with “all soils”, lean-clay or heavy-clay correlations. It breaks the profile into layers automatically, and the resulting layer structure can be imported directly into the evaluation module.
Source: U.S. Army Corps of Engineers (2010). PCASE 2.09 User Manual. Transportation Systems Center / ERDC
UIC links its subgrade quality classes (S0–S3) to ranges of modulus of elasticity and CBR (Figure 7.3-11). This lets CBR results from yard or access-road work be read against the track-subgrade classification in Chapter 2.3. Rock subgrades have moduli of the order of 430,000 psi. Profillidis defines CBR as the load producing 0.1 in. of penetration in the sample, divided by the load producing the same penetration in a standard reference material.

He adapts Dormon’s rule from highway engineering for the effect of traffic on subgrade stress: σ1/σ2 = (N2/N1)λ, with λ ≈ 0.2.
After Profillidis (2014), §9.6, §9.8, Fig. 9.5. Full reference under Supplemental References.
| Feel | Field indication | SPT (blows) | Shear strength (psf) | CBR |
|---|---|---|---|---|
| Very soft | Person standing sinks > 3 in. | < 2 | < 250 | < 0.4 |
| Soft | Person walking sinks 2–3 in. | 2–4 | 250–500 | 0.4–0.8 |
| Medium | Person walking sinks ~1 in. | 4–8 | 500–1,000 | 0.8–1.6 |
| Stiff | Pickup ruts 0.47–1 in. | 8–15 | 1,000–2,000 | 1.6–3.2 |
| Very stiff | Loaded dump truck ruts 1–3 in. | 15–30 | 2,000–4,000 | 3.2–6.4 |
| Hard | Insignificant ruts under loaded dump truck | > 30 | > 4,000 | > 6.4 |
Values as given in the course reference; use for screening, not design.

After Geotechnology for Railroaders Program, Module 2; §10. Full reference under Supplemental References.
Case study: 7.3.15.1 Chasing a CBR of 7% into competent rock (Look 2023), in §19.15 Case Studies.