Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way —…
Each question is worked in the same five parts as the examples.
Question 7.3-1: Structural Number for a Florida Yard
Problem Statement
A Class I railroad located in Florida is paving a new intermodal yard on a lean clay subgrade with a soaked CBR of 5%. The design traffic from trucks and container handlers is 10 million ESALs. The engineer must find the resilient modulus and the required structural number and select a flexible pavement section.
SN = 4.87: 6 in. HMA, 10 in. base, 10 in. subbase.
Solution
Mr = 7,500 psi; required SN = 4.87; use 6 in. HMA, 10 in. base and 10 in. subbase (SN 4.89).
A 6-8-10 section (SN 4.64) is about 5% short. Lime treatment of the subgrade to an assumed 8% CBR would reduce the required SN and is worth pricing.
Question 7.3-2: Frost Depth in a Silt Subgrade
Problem Statement
A railroad intermodal terminal located in Regina, Saskatchewan has a silt subgrade with the water content, density and thermal conductivity shown, and a design freezing index of 3,200 °F-days. The engineer must estimate the frost penetration depth and frost group and recommend how to protect the yard pavement.
The method of Example 7.3-3.
Given and required for Question 7.3-2.
Given
Variable
Value
Description
FI
3,200 °F-days
Regina, Saskatchewan
Soil
ML; w = 18%; γd = 102 pcf
kf
1.05 BTU/hr·ft·°F
Required
Frost depth and frost group
Equations
Eq. 1: L = 144 w γd; Zf = √(48 kf FI / L)
Steps
Step 1 · L
144 × 0.18 × 102
2,644 BTU/ft³
↓
Step 2 · Zf
√(161,280/2,644)
7.8 ft
↓
Step 3 · Frost group
Silt: F4
↓
Solution
Zf = 7.8 ft; F4.
Solution
Frost depth about 7.8 ft; the silt is group F4, the most susceptible.
Replace the silt to the frost depth with non-frost-susceptible granular material (no more than 3% fines) over a drainage blanket at the subgrade interface.
Question 7.3-3: ESALs From a Reach Stacker
Problem Statement
Reach stackers will move containers at a railroad intermodal yard about 300 times a day, with the loaded and empty tandem loads shown. The pavement designer needs the traffic in equivalent loads. The engineer must estimate the ESALs per move and per year by the fourth-power rule and compare them with a typical yard pavement design life.
Equivalent loads from heavy container handlers by the fourth-power rule.
Given and required for Question 7.3-3.
Given
Variable
Value
Description
Loaded tandem
110,000 lb
Empty tandem
66,000 lb (60% assumed)
Reference
32,000-lb tandem = 1 equivalent (simplified)
Traffic
300 moves/day
Required
ESALs per move and per year
Equations
Eq. 1: ESAL = (P/Pref)4 — fourth-power rule
Steps
Step 1 · Loaded
(110/32)4 = 3.43754
139.6
↓
Step 2 · Empty
(66/32)4
18.1
↓
Step 3 · Annual
157.7 × 300 × 365
About 17.3 million
↓
Solution
About 158 ESALs per move; 17.3M per year.
Solution
About 158 ESALs per move and 17.3 million per year.
One year of this traffic exceeds a typical 8M-ESAL design life, so either the traffic estimate must be refined or the pavement should be rigid. The fourth-power rule with a 32-kip tandem reference is a simplification; use the AASHTO load equivalency tables for design.
Question 7.3-4: Slab Thickness From a Laboratory Mr
Problem Statement
A crane runway slab is planned at a railroad intermodal terminal on a subgrade with the laboratory resilient modulus shown. The design traffic is 15 million ESALs, with the other design inputs listed. The engineer must find the modulus of subgrade reaction and the required thickness of a jointed concrete slab.
The method of Example 7.3-2.
Given and required for Question 7.3-4.
Given
Variable
Value
Description
Mr
4,500 psi
W18
15M ESALs
Other
R = 95%, S0 = 0.35, S′c = 650 psi, J = 3.2, Cd = 1.0, pt = 2.5
k ≈ 232 pci; an 11-in. slab is required (10.5 in. carries only about 14.4M).
Use 11-in. doweled JPCP on a 6-in. base, with #5 dowels at transverse joints spaced at 15 ft.
Question 7.3-5: Group Index and Treatment of a Fat Clay Subgrade
Problem Statement
A subgrade sample from a railroad intermodal yard located in Thunder Bay, Ontario has the Atterberg limits, fines and CBR shown. The engineer must classify the soil in the AASHTO system with its group index and decide whether it can support the yard pavement or must be treated or replaced.
Remove and replace the clay to the frost depth with non-frost-susceptible granular fill over a drainage blanket, or, where the removal depth exceeds about 8 ft and crane rail settlement governs, consider deep soil mixing (Chapter 7.2). With Mr of only about 3,000 psi, any pavement placed directly on it would be very thick.