Supplemental References

Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way —…
Authors: Daniel P. Colwell and Mario Ruel
Supplemental References

Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S9 for railroad clients; tables are condensed from the book and its figures are not reproduced. The Case Studies section summarizes case studies from item S10 by Burt G. Look; its figures are reproduced from the book for internal reference use, and the closing “For railroad work” note in each case study is added by the authors of this manual. Blocks tagged “Project management” summarize methods, examples and figures from the project-management, estimating and construction-management books listed here, applied to railroad work; the closing “For railroad work” note in each block is added by the authors of this manual.

  1. Huang, Y. H., Rose, J. G. and Khoury, C. J. (c. 1987). “Thickness Design for Hot-Mix Asphalt Railroad Trackbeds.” Proc. Association of Asphalt Paving Technologists, pp. 427–453 (scanned; text recovered by OCR)Find source ↗
  2. Limburg, A. and Nielsen, D. (2019). “Fast-Tracked Pavement Maintenance Using Concrete Rubblization.” AREMA 2019 Annual Conference ProceedingsFind source ↗
  3. SHRP2 R02 / GeoTechTools (2012). Geosynthetic Separation in Pavement Systems — fact sheet, design guidance and photographsFind source ↗
  4. SHRP2 R02 / GeoTechTools (2012). Geocell Confinement in Pavement Systems — fact sheet, design guidance and photographsFind source ↗
  5. U.S. Army Corps of Engineers (2010). PCASE 2.09 User Manual. Transportation Systems Center / ERDCFind source ↗
  6. Mauduit, C., Livet, J. and Piau, J-M. (2007). “Frost Design Method for Roadways and Railways – State of the Art in France.” In Gomes Correia, A., Momoya, Y. and Tatsuoka, F. (eds.), Design and Construction of Pavements and Rail Tracks. Taylor & Francis/BalkemaFind source ↗
  7. Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
  8. Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
  9. Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: ch. 10Find source ↗Library entry
  10. Look, B. G. (2023). Earthworks: Theory to Practice – Design and Construction. Leiden: CRC Press/Balkema (Taylor & Francis). ISBN 978-1-032-10470-6. Case studies used on this page: §6.11, §10.16, §11.7Find source ↗Library entry
  11. Bull, J. W. (ed.) (2015). Life Cycle Costing for the Analysis, Management and Maintenance of Civil Engineering Infrastructure. Dunbeath, Scotland: Whittles Publishing. Used on this page for project-management materialFind source ↗

Photograph credits

The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.

  1. Photo 7.3.3-1 — Test section design, numbering scheme, and number of passes to failure. From Crockford, Grogan, and Chill (1993), Transportation Research Record 1418, Figure 4, p. 63. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  2. Photo 7.3.3-2 — Fiber-reinforced soil sample prepared for laboratory testing. From the US Army Corps of Engineers. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  3. Photo 7.3.3-3 — Fiber-soil field mixing. From the US Army Corps of Engineers. The Fact Sheet document's own cover image is a closely related photograph of the same mixing operation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  4. Photo 7.3.6-1 — Excavation of unsuitable soil using hydraulic excavator in Columbus, Mississippi. Photograph courtesy of David M. Coleman. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  5. Photo 7.3.6-2 — Typical use of excavation and replacement methods for improving site conditions. Rollings and Rollings (1996). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  6. Photo 7.3.6-3 — After excavation, geogrid and granular replacement fill, Columbus, Mississippi. From the files of David M. Coleman. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  7. Photo 7.3.6-4 — Area requiring excavation and replacement, Sandlake-Galloway Road Project. From Tillamook County, Oregon. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  8. Photo 7.3.6-5 — Excavation and geosynthetic placement prior to replacement, Sandlake-Galloway Road Project. From Tillamook County, Oregon. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  9. Photo 7.3.6-6 — Self-propelled pan scraper on Stage C of Highway 14, Waseca, MN. From EquipmentImages.net. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  10. Photo 7.3.6-7 — Towed scrapers on Stage C of Highway 14, Waseca, MN. From EquipmentImages.net. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  11. Photo 7.3.6-8 — Placement of geosynthetic in roadway. Courtesy of National Highway Institute. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  12. Photo 7.3.6-9 — Placement of geosynthetic in roadway. Courtesy of Kansas Department of Transportation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  13. Photo 7.3.6-10 — Placement of geosynthetic in roadway. From Kansas Department of Transportation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  14. Photo 7.3.6-11 — Placement of geosynthetic in roadway. From Kansas Department of Transportation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  15. Photo 7.3.6-12 — Geocell infilled with soil. From the files of Jie Han, University of Kansas. A closely related crop of this same photograph appears as the Fact Sheet document's own cover image. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  16. Photo 7.3.6-13 — Geocell-reinforced road construction. From the files of Jie Han, University of Kansas. A closely related crop of this same photograph appears as the Fact Sheet document's own cover image. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  17. Photo 7.3.6-14 — Geosynthetic-reinforced temporary, unpaved road. From a National Highway Institute lecture. The Fact Sheet document's own cover image reuses this same photograph at higher resolution, reproduced here. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  18. Photo 7.3.6-15 — Placement of geotextile during roadway construction. From the Kansas Department of Transportation. The Fact Sheet document's own cover image reuses this same photograph at higher resolution, reproduced here. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  19. Photo 7.3.6-16 — Straightedge rut-depth measurement on a test section. From the project case history document; caption not provided in the source. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  20. Photo 7.3.6-17 — Definition of blinding, clogging, and caking. Black and Holtz (1999); with permission from ASCE. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  21. Photo 7.3.6-18 — Placement of base course materials over the geotextile in roadway. From Minnesota Department of Transportation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  22. Photo 7.3.6-19 — Placement of geotextile in roadway. From National Highway Institute Lecture notes. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  23. Photo 7.3.6-20 — Grading of rock cap aggregate. From Uhlmeyer et al. (2003), Transportation Research Record 1821, Figure 5(c), p. 45. Copyright, National Academy of Sciences. Reproduced with permission of the Transportation Research Board. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  24. Photo 7.3.6-21 — Rock cap overlaid with crushed stone subbase (cross-section). From Uhlmeyer et al. (2003), Transportation Research Record 1821, Figure 2(a), p. 41. Copyright, National Academy of Sciences. Reproduced with permission of the Transportation Research Board. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  25. Photo 7.3.6-22 — Placement of rock cap with belly dump trucks. From Uhlmeyer et al. (2003), Transportation Research Record 1821, Figure 5(b), p. 45. Copyright, National Academy of Sciences. Reproduced with permission of the Transportation Research Board. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  26. Photo 7.3.6-23 — Placement of base material on top of the geotextile. Photograph from www.tencate.com, courtesy of TenCate Geosynthetics North America. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  27. Photo 7.3.6-24 — Compaction of base material on top of the geogrid. Photograph courtesy of North Dakota DOT. This same photograph is also used as the Fact Sheet document's cover image. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  28. Photo 7.3.11-1 — Rubblization using RMI Resonant Breaker. Photograph courtesy of Resonant Machines, Inc., 2005. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  29. Photo 7.3.11-2 — Particle distribution of the recycled pavement material (RPM). Li et al. (2007); with permission from ASCE. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  30. Photo 7.3.11-3 — Hot In-place Recycling (HIR) train. Photograph courtesy of ARRA (2001). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  31. Photo 7.3.11-4 — Multi-unit Cold In-place Recycling train. Photograph courtesy of ARRA (2001). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  32. Photo 7.3.11-5 — Full-Depth Reclamation (FDR). From FHWA-SA-98-042; Kandhal and Mallick (1997). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  33. Photo 7.3.11-6 — Cold milling. From FHWA-SA-98-042; Kandhal and Mallick (1997). Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  34. Photo 7.3.11-7 — Break and seat operation. Photograph courtesy of Antigo Construction, Inc. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗
  35. Photo 7.3.11-8 — Rubblization using MHB Badger Breaker. Photograph courtesy of Antigo Construction, Inc. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.GeoTechTools.org ↗