7.3.18 AASHTO 1993 Pavement Design for Crossings, Access Roads and Yards

Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way —…
Authors: Daniel P. Colwell and Mario Ruel
7.3.18 AASHTO 1993 Pavement Design for Crossings, Access Roads and Yards

Railroads own a surprising amount of highway-type pavement: approaches to grade crossings, maintenance and access roads, yard and intermodal driveways, and parking areas at facilities. These are designed with the AASHTO Guide for Design of Pavement Structures (1993), which most state DOTs and railroads still accept for this work. The Guide turns traffic in 18-kip equivalent single axle loads (ESALs), a reliability level, the allowable loss of serviceability and the subgrade resilient modulus into a required structural number (flexible pavement) or slab thickness (rigid pavement). The nomographs in the Guide solve two equations; the calculators below solve the equations directly, which is more precise than reading the charts.

7.3.18.1 Method

Equation 7.3-2. AASHTO flexible pavement design equation (Guide Figure 3.1)

log10W18 = ZRS0 + 9.36 log10(SN + 1) − 0.20 + log10[ΔPSI/(4.2 − 1.5)] / [0.40 + 1094/(SN + 1)5.19] + 2.32 log10MR − 8.07;   SN = a1D1 + a2m2D2 + a3m3D3

ZR = standard normal deviate for reliability R; S0 = overall standard deviation (0.40 to 0.50); ΔPSI = p0 − pt; MR = effective roadbed resilient modulus (psi); ai = layer coefficients (a2 = 0.249 log EBS − 0.977; a3 = 0.227 log ESB − 0.839); mi = drainage coefficients; Di = layer thicknesses (in.).

Equation 7.3-3. AASHTO rigid pavement design equation (Guide Figure 3.7)

log10W18 = ZRS0 + 7.35 log10(D + 1) − 0.06 + log10[ΔPSI/(4.5 − 1.5)] / [1 + 1.624×107/(D + 1)8.46] + (4.22 − 0.32pt) log10{{S′cCd(D0.75 − 1.132) / [215.63J(D0.75 − 18.42/(Ec/k)0.25)]}}

D = slab thickness (in.); S′c = modulus of rupture (psi); Cd = drainage coefficient; J = load transfer coefficient; Ec = concrete modulus (psi); k = effective modulus of subgrade reaction (pci), or MR/19.4 with no subbase.

In layered flexible design (Guide Section 4.1.5) the equation is solved three times: with the base modulus in place of MR to find the structural number the asphalt must provide above the base (SN1), with the subbase modulus for SN2, and with the roadbed modulus for the total SN3. Each layer is then sized from the remaining structural number and rounded up, subject to the Guide’s minimum thicknesses (asphalt 1.0 to 4.0 in. and base 4 to 6 in., increasing with traffic).

Table 7.3-11. Calculator against the AASHTO nomograph examples
CaseInputsGuide (chart)Calculator (equation)
Flexible, Figure 3.1W18 = 5×106, R = 95%, S0 = 0.35, MR = 5,000 psi, ΔPSI = 1.9SN = 5.0SN = 4.98
Rigid, Figure 3.7W18 = 5.1×106, R = 95%, S0 = 0.29, ΔPSI = 1.7, S′c = 650 psi, Cd = 1.0, J = 3.2, Ec = 5×106 psi, k = 72 pciD = 10.0 in.D = 9.72 in. (10.0 in. rounded up)

The small differences are the reading precision of the nomographs; the Guide notes that the equations are the more precise solution.

7.3.18.2 Worked example

Example 7.3-4: Flexible Pavement for a Grade-Crossing Approach

A public road crossing on a Class I railroad located in Michigan is being reconstructed, and the road authority asks for a flexible pavement on the approaches matching the AASHTO 1993 Guide. The design traffic is 5 million ESALs; the subgrade is a silty clay with an effective resilient modulus of 5,000 psi.

D1 = ?D2 = ?D3 = ?roadbed MR = 5,000 psiasphalt, a1 = 0.44base EBS 30,000 psisubbase ESB 15,000 psiW18 = 5 × 10⁶GivenW18 = 5,000,000 ESALsR = 95%, S0 = 0.35; ΔPSI = 1.9MR = 5,000 psia1 0.44; EBS 30,000; ESB 15,000; m = 1.0RequiredRequired SND1, D2, D3
Flexible pavement section for the crossing approach: asphalt, crushed base and granular subbase over the roadbed soil.

Given

VariableValueDescription
W185,000,000 ESALsDesign lane, performance period
R, S095% (ZR = −1.645); 0.35Urban arterial
p0, pt4.2; 2.3 (ΔPSI = 1.9)
MR5,000 psiRoadbed, seasonally adjusted
Asphalta1 = 0.44Dense-graded
BaseEBS = 30,000 psi, m2 = 1.0Crushed aggregate, fair drainage
SubbaseESB = 15,000 psi, m3 = 1.0Granular

Required

  • Required structural number
  • Layer thicknesses by the layered procedure
  • Check of the structural number provided

Equations

  1. Eq. 7.3-2: log W18 = ZRS0 + 9.36 log(SN + 1) − 0.20 + … + 2.32 log MR − 8.07 — solved for SN
  2. Eq. 7.3-2: a2 = 0.249 log EBS − 0.977; a3 = 0.227 log ESB − 0.839
  3. Eq. 7.3-2: D1 ≥ SN1/a1; D2 ≥ (SN2 − a1D1)/(a2m2); D3 ≥ (SN3 − a1D1 − a2m2D2)/(a3m3) — layered design

Steps

Step 1 · Total SN (roadbed MR = 5,000 psi)
Solve with log W18 = 6.699
SN3 = 4.98
Spot check: The Guide’s Figure 3.1 example with these inputs reads SN = 5.0.
↓
Step 2 · SN above base and subbase
Same equation with MR = 30,000 psi, then 15,000 psi
SN1 = 2.63; SN2 = 3.40
↓
Step 3 · Layer coefficients
0.249 log 30,000 − 0.977; 0.227 log 15,000 − 0.839
a2 = 0.138; a3 = 0.109
↓
Step 4 · Asphalt
2.63/0.44 = 5.99 in.
D1 = 6.0 in. (minimum 3.5 in.)
↓
Step 5 · Base
(3.40 − 0.44 × 6.0)/(0.138 × 1.0) = 5.5 in.
D2 = 6.0 in. (minimum 6 in.)
↓
Step 6 · Subbase
(4.98 − 2.64 − 0.138 × 6.0)/(0.109 × 1.0) = 13.9 in.
D3 = 14.0 in.
Spot check: SN provided = 0.44(6.0) + 0.138(6.0) + 0.109(14.0) = 2.64 + 0.83 + 1.53 = 4.99 ≥ 4.98.
↓
Solution
6.0 in. asphalt on 6.0 in. crushed base on 14.0 in. granular subbase (SN = 4.99).

Solution

The approaches need SN = 4.98: 6 in. of asphalt on 6 in. of crushed aggregate base on 14 in. of granular subbase.

At a crossing the pavement meets the crossing surface and the track structure, so match the road authority’s section to the crossing panels, carry the subbase drainage away from the track ballast, and keep the subgrade under the approaches at least as stiff as under the track to avoid a bump at the panels.

Open the AASHTO flexible pavement calculator →
Required structural number from the 1993 equation, layer coefficients from moduli, the layered design of asphalt, base and subbase with minimum thicknesses, and an SN-versus-ESAL chart.

Open the AASHTO rigid pavement calculator →
Slab thickness from the 1993 rigid equation for the design ESALs, reliability, serviceability, concrete properties, load transfer, drainage and k-value, with a sensitivity check on k.

7.3.18.3 Sources

The summaries above are paraphrased in original wording; equations and tabulated values are standard or published. Individual railroads, clients, companies and projects are not named.

  • AASHTO, Guide for Design of Pavement Structures (1993): Part II, Chapter 2 (design requirements, Tables 2.2 to 2.6) and Chapter 3 (Figures 3.1 and 3.7, layered design and minimum thicknesses).Find source ↗
  • T.G. Hicks (ed.), Handbook of Civil Engineering Calculations, McGraw-Hill (2000): Section 5, highway pavement design procedures.Find source ↗Library entry