↑ Parent Menu⌂ Main Menu
← Chapter 7.3 Pavement Subgrade Evaluation
GHRM
Railway Ground Hazard Risk Management · 7.0 · Design
Sections · click a car to open it

7.3.16 Apps and Tools 21

Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way —…
Authors: Daniel P. Colwell and Mario Ruel
7.3.16 Apps and Tools21

The web apps and the Geotechnical Analysis Suite calculators and workbook guides for this chapter, gathered here from across the manual in the November 2026 restructure: 21 tools (21 interactive calculators). Where a tool applies to a particular section of this chapter it is also placed in that section in an orange tools strip. Each row lists the chapters and sections where the tool is used. Calculators open on dirtbert.com (sign-in required).

Apps

Each app runs in a web browser on a desktop or a phone, with nothing to install. How to use the apps (1.0.3).

Tools

Pavements, Subgrade & Frost
PVAASHTO AC OverlayUsed in Chapter 7.3, 7.3.3 AASHTO 1993 Flexible Pavement DesignCalculator ▸Guide
PVAASHTO Equivalent Axle Load FactorsUsed in Chapter 7.3, 7.3.3 AASHTO 1993 Flexible Pavement DesignCalculator ▸Guide
PVAASHTO Flexible PavementUsed in Chapter 7.3, 7.3.3 AASHTO 1993 Flexible Pavement DesignCalculator ▸Guide
PVAASHTO PCCVBA errorUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVAASHTO Rigid PavementUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVAsphalt Institute Flexible Pavement — HeavyUsed in Chapter 7.3, 7.3.3 AASHTO 1993 Flexible Pavement DesignCalculator ▸Guide
PVCBR CorrelationsUsed in Chapter 2.2, 2.2.5 AASHTO M 145 Classification; Chapter 1.4, Applies to the chapter as a whole; Chapter 5.2, Applies to the chapter as a whole; Chapter 7.3, 7.3.2 Subgrade Strength TestingCalculator ▸Guide
PVCBR Statistical ValuesUsed in Chapter 5.2, 5.2.3 Test Methods — ASTM Standards and English Unit Outputs; Chapter 6.3, 7.3.2 Subgrade Strength TestingCalculator ▸Guide
PVContainer Handler Wheel LoadsUsed in Chapter 7.3, 7.3.7 Intermodal Yard Crane Rail Foundation SubgradeCalculator ▸Guide
PVDowel Bar DesignUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVDowel Bar Design — IntermodalUsed in Chapter 7.3, 7.3.7 Intermodal Yard Crane Rail Foundation SubgradeCalculator ▸Guide
PVFAA P-501 Random SamplingUsed in Chapter 5.3, 5.3.2 Compaction TestingCalculator ▸Guide
PVFinished Subgrade ElevationUsed in Chapter 7.3, 7.3.6 Subgrade Preparation and Compaction CriteriaCalculator ▸Guide
PVGRDSLAB — Concrete Slab on GradeUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVILDOT (no precore)Used in Chapter 7.3, 7.3.6 Subgrade Preparation and Compaction CriteriaCalculator ▸Guide
PVOptimized Aggregate Gradation (HWS)Used in Chapter 7.3, 7.3.6 Subgrade Preparation and Compaction CriteriaCalculator ▸Guide
PVOptimized Aggregate Gradation (TxDOT)Used in Chapter 7.2, 7.2.4 Stone Columns; Chapter 7.3, 7.3.6 Subgrade Preparation and Compaction CriteriaCalculator ▸Guide
PVPCA Heavy Industrial PCC PavementUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVRCC Thickness DesignUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVRoller Compacted Concrete (RCC) DesignUsed in Chapter 7.3, 7.3.4 AASHTO 1993 Rigid Pavement DesignCalculator ▸Guide
PVWheel Load Conversion — Dual to SingleUsed in Chapter 7.3, 7.3.3 AASHTO 1993 Flexible Pavement DesignCalculator ▸Guide
← Previous · 7.0 Design Chapter 7.2 — Ground Improvement Methods
Next · 7.0 Design → Chapter 7.4 — Earthworks Asset Management and Remedial Design