Subsections
23Primary Reference: USACE EM 1110-1-1804, Geotechnical Investigations (January 2001); FHWA NHI-06-019 (superseded by GEC 13 Ground Modification Methods, FHWA-NHI-16-027 (2017)) "Ground Improvement Methods" (2006); Barron (1948); Priebe (1995); AREMA MRE Chapter 1 (Roadway and Ballast); Kirsch & Bell (2012) "Ground Improvement"; ASTM D698 (Standard Proctor); ASTM D1557 (Modified Proctor).
- 7.2.0Executive Summaryopen →
- ·Empirical Equations β Use and Limitationsopen →
- 7.2.1Background and Railroad Contextopen →
- 7.2.2Compaction Methodsopen →
- 7.2.3Prefabricated Vertical Drains (PVDs) with Staged Loadingopen →
- 7.2.4Stone Columnsopen →
- 7.2.5Deep Soil Mixing (DSM)open →
- 7.2.6Grouting Methodsopen →
- 7.2.7Lime and Cement Stabilizationopen →
- 7.2.8Geosynthetic Reinforcementopen →
- 7.2.9Worked Examplesopen →
- 7.2.10Representative Data Tableopen →
- 7.2.11Reference Photographsopen →
- 7.2.12Practical Recommendationsopen →
- 7.2.13Ground Improvement Checklistopen →
- 7.2.14Practice Questionsopen →
- 7.2.15Cross-Referencesopen →
- 7.2.16Ground Improvement Technology Libraryopen →
- 7.2.17Case Studiesopen →
- 7.2.18Research to Practice: Findings for Railroad Ground Improvementopen →
- 7.2.19Thermal Methods: Ground Freezing and Heat Treatmentopen →
- ·Author and Sourcesopen →
- ·Supplemental Referencesopen →
Apps
2 appsChapter 7.2 · Section 7.2.7.3Lime Slurry Pressure Injection PlannerInjection holes and stages, slurry, water and hydrated lime quantities, tank loads and track time for a treated length.Chapter 7.2 · Section 7.2.3.4Wick Drain Spacing and Time RateBarron equal-strain radial consolidation with a smear zone, combined with vertical drainage, settlement with and without drains, the spacing needed to reach a target degree of consolidation, and the time to reach it.