↑ Parent Menu⌂ Main Menu
← Chapter 7.3 Pavement Subgrade Evaluation
GHRM
Railway Ground Hazard Risk Management · 7.0 · Design
Sections · click a car to open it

7.3.5 Frost Design

Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way —…
Authors: Daniel P. Colwell and Mario Ruel
7.3.5 Frost Design
7.3.5.1 Frost Penetration Depth

For facilities in northern climates, frost penetration depth Z_f (ft) is estimated using the modified Berggren equation:

Zf = √48 kf FIL    (Stefan form; modified Berggren with λ = 1)

Where:

  • k_f = thermal conductivity of frozen soil (BTU/hr·ft·°F); typically 0.75–1.50
  • F_I = freezing index (°F-days); defined as cumulative degree-days below 32°F
  • L = volumetric latent heat of fusion (BTU/ft³) = 144 × w × γ_d; 144 BTU/lb = latent heat of water; w = water content (decimal); γ_d = dry unit weight (pcf)

Z_f is in feet. The full modified Berggren equation multiplies the right-hand side by the correction coefficient λ (≤ 1, from the thermal ratio and fusion parameter), so this simplified form is conservative (deeper).

Figure 7.3-14. Ice lenses forming as the cold front deepens.
Figure 7.3-14. Ice lenses forming as the cold front deepens.

Source: Aldrich, H.P. and Paynter, H.M. (1953), Analytical Studies of Freezing and Thawing of Soils, ACFEL Tech. Rep. 42; UFC 3-130-06 / TM 5-852-6, Calculation Methods for Determination of Depths of Freeze and Thaw in Soils; Pavement Interactive, "Modified Berggren Formula."

Design freezing indices by location (99% confidence level):

LocationDesign F_I (°F-days)Typical Z_f (ft)
Winnipeg, MB3,8007.5–9.0
Edmonton, AB3,2006.5–8.0
Thunder Bay, ON3,0006.0–7.5
Chicago, IL1,2003.5–4.5
Minneapolis, MN1,8004.5–5.5
Kansas City, MO8002.5–3.5
Atlanta, GA1500.5–1.0
Inputs for the equations in this section (5)
SymbolWhat it isComes fromHow to get itTypical range
kfthermal conductivity of frozen soil (BTU/hr·ft·°F)Published dataKersten charts in UFC 3-130-06 (TM 5-852-6) for the measured γd and w.fine-grained 0.8–1.4 BTU/hr·ft·°F · by USCS group
FIfreezing index (°F-days)Published hazard / climate dataDesign freezing index from NOAA climate records per UFC 3-130-06 (average of the 3 coldest winters in 30 years).project-specific
Lvolumetric latent heat of fusion (BTU/ft³)Another equationComputed: L = 144 × w × γ_d; 144 BTU/lb = latent heat of waterproject-specific
wwater content (decimal)Lab testOven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938).gravels/sands 3–25%, clays 15–70% · by USCS group
γddry unit weight (pcf)Lab or field testLab: ASTM D7263 on tube samples. Field: nuclear gauge (ASTM D6938), sand cone (D1556) or drive cylinder (D2937). Or γd = γ/(1 + w).sands 90–125, clays 80–115 pcf · by USCS group
7.3.5.2 Frost Heave and Frost Susceptibility

Frost susceptibility is classified per the USACE system (modified for pavement applications):

Table 7.3-5: Frost Susceptibility Classification
GroupFrost SusceptibilitySoil TypesApprox. lab heave rate class (in./day)Design Action
NFSNegligibleClean gravels and sands (< 3% finer than 0.02 mm)< 0.02No frost protection needed
F1LowGravelly soils with 3–10% finer than 0.02 mm0.02–0.08Minimal protection; monitor
F2MediumGravelly soils with 10–20% finer than 0.02 mm; sands with 3–15%0.08–0.16Partial replacement with non-frost-susceptible material
F3HighGravelly soils > 20% finer than 0.02 mm; sands > 15% (except very fine silty sands); clays with PI > 120.16–0.31Full replacement to Z_f or frost protection layer
F4Very HighAll silts; very fine silty sands > 15% finer than 0.02 mm; clays with PI < 12; varved clays> 0.31Full replacement; subgrade stabilization; drainage mandatory

In cold regions, replace F3 and F4 subgrade materials within the frost depth with granular material meeting: P-200 ≤ 3%, CBR ≥ 40%, non-plastic.

7.3.5.3 Reduced Subgrade Strength During Spring Thaw

During spring thaw, subgrade strength may be reduced to as low as 20–30% of the non-frozen value due to saturated, softened conditions. Owner railroads may apply a seasonal correction factor:

Mr,thaw = fthaw × Mr,design

Where f_thaw = 0.20 to 0.35 (conservative range during thaw period). The AASHTO 1993 finds the effective M_r from the average relative damage over the 12 months:

uf = 1.18 × 108 × Mr−2.32;   Mr,eff = (ūf / 1.18 × 108)−1/2.32

Because u_f rises steeply as M_r falls, the low-strength thaw months govern the design.

Inputs for the equations in this section (2)
SymbolWhat it isComes fromHow to get itTypical range
fthaw0.20 to 0.35 (conservative range during thaw period)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
Mrresilient modulusLab test (or correlation)Repeated-load triaxial (AASHTO T 307), or Mr ≈ 2,555·CBR0.64 (MEPDG).fine-grained 3,000–14,000 psi · by USCS group
Supplemental reference

How a railway frost check differs from a pavement check (SNCF practice)

Mauduit, Livet and Piau summarize the French approach, which is useful where track and paved yard areas share frost-susceptible subgrade:

  • Frost susceptibility is classed from the frost-swelling test (NF P 98-234-2) by the slope of the swelling curve: SGn (frost-resistant) ≤ 0.0015, SGp (slightly susceptible) 0.0015–0.012, SGt (highly susceptible) > 0.012 in./(°F·h)1/2. Without a test, the class comes from the soil classification or the grading of the fraction passing the No. 10 sieve.
  • Roads compare a reference atmospheric frost index (e.g., the exceptional winter since 1951, or a 10-year winter) with the index the structure can withstand. They may accept a shortfall if thaw barriers (load restrictions) will be imposed.
  • Track (current SNCF method): the thickness of frost-resistant layers (ballast, sub-ballast, non-susceptible capping) must exceed the frost depth of a 20-year winter so that the first frost-susceptible layer is penetrated no more than 2 in.. Otherwise a resistant layer is thickened in 2-in. steps. The frost depth may be multiplied by 0.9 only where soils are not highly susceptible and drainage is very good. A frost-swelling test is recommended where the frost front could penetrate a susceptible layer by 2 in..
  • Why railways are stricter: track evenness tolerates little heave; railways cannot impose thaw barriers or add material at the surface; rain passes through the ballast; and ballast attrition keeps changing material properties. A statistical review of 1,600 frost-swelling tests found that the existing SNCF sub-layer and capping specification (ST590B) was not severe enough to guarantee frost-resistant soils.

Source: Mauduit, C., Livet, J. and Piau, J-M. (2007). “Frost Design Method for Roadways and Railways – State of the Art in France.” In Gomes Correia, A., Momoya, Y. and Tatsuoka, F. (eds.), Design and Construction of Pavements and Rail Tracks. Taylor & Francis/Balkema

Frost index and required protection thickness

The frost index is the integral of below-freezing temperature over time (°F-days or °F-hours). It is chosen for a design return period: F2, F5, F10 or F100 correspond to a 50%, 20%, 10% or 1% chance of freezing through in a given winter. For track, the required ballast-plus-subballast thickness rises from about 20 in. at 360°F-days to over 6.6 ft at 2,900°F-days, depending on mean annual temperature (Figure 7.3-12). The same chart is a reasonable cross-check for granular protection under yard pavements built on frost-susceptible silts. Chapter 2.3, §2.5 has the full frost discussion.

Figure 7.3-12. Required ballast + subballast thickness against frost penetration vs. frost index and mean annual temperature. Profillidis Fig. 12.6.
Figure 7.3-12. Required ballast + subballast thickness against frost penetration vs. frost index and mean annual temperature. Profillidis Fig. 12.6.

After Profillidis (2014), §9.11.1, §12.5.2, Table 9.6, Fig. 12.6. Full reference under Supplemental References.

The five conditions for frost heave

Heave requires saturated soil, frost-susceptible soil (silt), sub-zero temperature, a slowly advancing freezing front, and a water supply from below. Remove any one and it stops. For yards and access roads, that means drainage that keeps the water table down and clean, low-fines granular base. Fines-rich material compacts well dry but heaves and loses strength when wet.

After Geotechnology for Railroaders Program, Module 6.6, Module 2; Module 6.6 §02; Module 2 §09. Full reference under Supplemental References.

← Previous · 7.0 Design Chapter 7.2 — Ground Improvement Methods
Next · 7.0 Design → Chapter 7.4 — Earthworks Asset Management and Remedial Design