↑ Parent Menu⌂ Main Menu
← Chapter 7.3 Pavement Subgrade Evaluation
GHRM
Railway Ground Hazard Risk Management · 7.0 · Design
Sections · click a car to open it

7.3.9 Representative Data Table

Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way —…
Authors: Daniel P. Colwell and Mario Ruel
7.3.9 Representative Data Table
Table 7.3-7: Laboratory Subgrade Testing Results — Class I railroad Intermodal Expansion located in Kansas City
Sample IDDepth (ft)USCSLLPLPIP-200 (%)γ_d (pcf)w_opt (%)CBR soaked (%)M_r (psi)FS Class
TP-1 / 0–20.5CL3819196898163.55,250F3
TP-1 / 2–43.0CL4120217296183.04,500F3
TP-2 / 0–20.5ML3224874100144.06,000F3
TP-2 / 2–43.0CL4422227895192.53,750F3
TP-3 / 0–20.5SM2821738108128.512,750F2
TP-3 / 2–43.0SC35181752102155.58,250F3
TP-4 / 0–20.5GC30181218118101827,000F2
TP-4 / 2–43.0GM26161022116111522,500F2

All CBR values at Modified Proctor 95% RC, soaked 4 days per ASTM D1883. M_r estimated from CBR using Heukelom & Klomp (CBR ≤ 10) and NCHRP 1-37A (MEPDG) (CBR > 10).

← Previous · 7.0 Design Chapter 7.2 — Ground Improvement Methods
Next · 7.0 Design → Chapter 7.4 — Earthworks Asset Management and Remedial Design