Rail-mounted gantry cranes (RMG) impose wheel loads of 75–150 kips per wheel on crane rail foundation beams. The geotechnical design challenge is controlling differential settlement between adjacent crane rail beam pile caps:
Differential settlement criterion:
For a 50-ft span between crane rail beam pile caps: ΔS_allow = 50 × 12 in. / 500 = 1.2 in. maximum differential. Some owners tighten this to L/750 (0.80 in.) for high-cycle operations. Rubber-tired gantries (RTG) run on paved runways rather than rails, so their runways are designed as heavy-duty pavement.
Crane rail foundation design is addressed in Chapter 6.1 (bearing capacity) and Chapter 6.2 (settlement). The subgrade evaluation output for crane rail areas includes: