The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.
| ID | Correlation | Gives |
|---|---|---|
| RK-10 | UCS from point load index | σ꜀ |
| IX-10 | Undrained strength from liquidity index | Sᵤ (remolded) |
| IS-21 | Soil unit weight from CPT | γ |