7.3.12 Pavement Subgrade Evaluation Checklist

Pavement subgrade evaluation for railroad facilities encompasses two distinct but related infrastructure domains: (1) paved surfaces within railroad right-of-way —…
Authors: Daniel P. Colwell and Mario Ruel
7.3.12 Pavement Subgrade Evaluation Checklist

Checklist · Part VIII · Pavements

Pavement Subgrade Evaluation Checklist

Site Investigation Phase0 of 6
Laboratory Testing Phase0 of 7
Design Phase0 of 8
Deliverable Phase0 of 6
Ticks are saved in this browser.
Plain text version

Site Investigation Phase

  • [ ] Confirm finished-grade elevation from grading plan before scheduling test pits
  • [ ] Excavate test pits to Z_f + 3 ft depth at northern facilities
  • [ ] Collect undisturbed (Shelby tube) or bulk samples at 1-ft intervals to subbase depth
  • [ ] Measure depth to groundwater and document seasonal high-water table records
  • [ ] Test for sulfate content (ASTM D4327) at all sites where lime stabilization is planned
  • [ ] Photograph and log each test pit with USCS classification and frost susceptibility group noted

Laboratory Testing Phase

  • [ ] Run Modified Proctor (ASTM D1557) for all subgrade materials intended for compaction
  • [ ] Perform soaked CBR at 95% Modified Proctor RC (ASTM D1883)
  • [ ] Run Atterberg Limits (ASTM D4318) on all fine-grained samples
  • [ ] Run grain size analysis (ASTM D7928 / D6913) with P-200 determination on all samples
  • [ ] Confirm frost susceptibility classification per Table 7.3-5 for all samples in frost zones
  • [ ] Test lime or cement-stabilized specimens for CBR at 7-day cure (if stabilization is proposed)
  • [ ] Conduct sulfate test if PI > 20 or existing lime treatment has shown distress
5 Major Pavement Distress
5 Major Pavement Distress

Design Phase

  • [ ] Calculate design ESAL for target traffic (reach stackers, truck tractors, service vehicles)
  • [ ] Select reliability R and S₀ per the owner railroad's standard
  • [ ] Confirm design M_r from soaked CBR; apply the AASHTO seasonal effective M_r if frost zone
  • [ ] Calculate SN (flexible) or D (rigid) per AASHTO 1993
  • [ ] Design layer thicknesses using layer coefficients (Table 7.3-4) and drainage coefficients
  • [ ] Check crane runway differential settlement criteria separately from pavement SN
  • [ ] Specify compaction criteria per Table 7.3-6 for client
  • [ ] Specify subgrade stabilization scope and method if CBR < client minimum

Deliverable Phase

  • [ ] Provide test pit logs with CBR, M_r, FS class, and USCS symbol for each sample
  • [ ] Include pavement design calculation summary (AASHTO inputs and SN/D result)
  • [ ] Include typical pavement cross-section detail with annotated layer materials and thicknesses
  • [ ] Provide subgrade improvement specification (lime, cement, geosynthetic) if applicable
  • [ ] Provide frost design calculations (Z_f, seasonal M_r) for all northern facility sites
  • [ ] Provide subgrade baseline data table formatted for client's pavement management system