Subsections
11A railroad's earthworks (its cuts, embankments, sidehill fills and the drainage that serves them) are among its largest and oldest assets, and they are usually the least recorded. Asset management treats them like bridges or rail: an inventory, a condition rating, an understanding of how they deteriorate, and a ranked program of interventions chosen to reduce risk most for the money available. This chapter sets out that framework and links it to the GHRM risk ratings and remedial design.
- 7.4.0Purpose and Overviewopen →
- 7.4.1Inventoryopen →
- 7.4.2Condition Examinationopen →
- 7.4.3Deterioration and Triggersopen →
- 7.4.4Prioritizing Interventionsopen →
- 7.4.5Remedial Optionsopen →
- 7.4.6Worked Exampleopen →
- 7.4.7Cross-Referencesopen →
- 7.4.8Concrete Culverts, Walls and Abutments: Deterioration, Assessment and Repairopen →
- 7.4.9Recycled Plastic Pins for Shallow Slope Failuresopen →
- 7.4.10Carbon Footprint of Remedial Optionsopen →
Apps
No apps yet for this chapter.