Secondary compression occurs after primary consolidation is essentially complete (U ≈ 95–100%) as the clay skeleton continues to creep under sustained load. It is particularly significant for organic soils (Pt) and highly plastic clays (CH) — common in coastal Georgia swamps, Manitoba peatlands and Louisiana.
Ss = Cα / (1 + ep) · H · log(t₂ / t₁)
Where:
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Cα | secondary compression index (dimensionless) | Lab test | Slope of e vs log time after primary consolidation in the consolidation test (ASTM D2435). | Cα/Cc 0.03–0.08 · by USCS group |
| ep | void ratio at end of primary consolidation (≈ e₀ − ΔeP for primary compression) | Another equation | e = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435). | sands 0.35–0.85, clays 0.5–2.0 · by USCS group |
| H | layer thickness (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| t₁ | time at end of primary consolidation (days) | Time | Elapsed test time (recorded) or the analysis time chosen for design. | project-specific |
| t₂ | design service life or evaluation time (days) | Design criterion | Set by the owner railroad's standards, AREMA, AASHTO, USACE or the project specification. | project-specific |
| Cc | compression index | Lab test | Slope of the virgin e–log σ' curve from a consolidation test (ASTM D2435). Screening: Cc ≈ 0.009(LL − 10). | CL 0.10–0.40, CH 0.35–0.90 · by USCS group |
Cα/Cc ≈ 0.04 ± 0.01 (for inorganic clays)
Cα/Cc ≈ 0.05 to 0.07 (for organic clays and peats)
For a 50-year railroad service life (t₂ = 18,250 days) with primary consolidation completing at t₁ = 500 days, log(18,250/500) = log(36.5) = 1.562. Even a modest C_α = 0.010 over a 10 ft clay layer produces S_s = 0.010/(1 + 1.8) × 10 × 1.562 = 0.056 ft = 0.67 in — significant on a Class 5 mainline with a 0.75 in. tolerance.
USACE EM 1110-1-1904 (Table 3-14, after Mesri) extends the ratios in Eq. 6.2-15 to other materials encountered on railroad alignments:
Table 12-S1. Ratio of secondary compression index to compression index
| Soil | Cα/Cc |
|---|---|
| Inorganic soils | 0.025–0.060 |
| Clay | 0.025–0.085 |
| Silt | 0.030–0.075 |
| Peat | 0.030–0.085 |
| Muskeg | 0.090–0.100 |
For a first approximation before tests are available, USACE (after NAVFAC DM-7.1) gives Cα ≈ 0.0001 wn for natural water contents 10–3,000%. The manual cautions that sample disturbance lowers the measured Cα in the virgin range and that secondary-compression predictions “have often not been reliable” — one more reason to confirm long-term behavior with settlement plates rather than rely on the calculation alone.
Source: U.S. Army Corps of Engineers (1990). Settlement Analysis. EM 1110-1-1904
Lea and Brawner’s British Columbia highway experience gives practical guidance for the peat and muskeg crossings noted above:
Source: Lea, N. D. and Brawner, C. O. Highway Design and Construction Over Peat Deposits in Lower British Columbia. Highway Research Board
A fill settles under its own weight as well as compressing the ground beneath it. A coarse fill compresses mostly as it is placed and then creeps at constant effective stress; a saturated clay fill first consolidates as construction pore pressures dissipate and then creeps (Skinner, 2012, Section 58.5, p. 905).
Equation 6.2-23. Creep compression rate of a fill
Skinner (2012), Eq. 58.2. Δs = settlement between times t1 and t2 after placement; H = fill thickness; α is a strain per log cycle of time.
| Fill | Compaction | α (% per log cycle of time) |
|---|---|---|
| Sandy gravel | Heavy vibrating roller | 0.04 σ′v |
| Mudstone | Heavy vibrating roller | 0.12 σ′v |
| Sandstone or mudstone rockfill | Heavy vibrating roller | 0.13 σ′v |
| Sandstone or mudstone rockfill | No systematic compaction | 0.9 to 1.5 |
| Stiff clay fill | Heavy systematic compaction | 0.5 |
Skinner (2012), Table 58.3, p. 905, from Charles and Watts (2001). For the first three rows σ′v is in MPa (1 MPa = 20.9 ksf); those rows come from embankment dam case histories.
Equation 6.2-24. Self-weight settlement of an embankment
Nowak (2012), Eq. 70.7, p. 1062, after Trenter (2001). D* = equivalent constrained modulus of the fill. For a 33-ft (10-m) embankment Charles (1993) gives D* of 50 for well-compacted sandy gravel and 6 for low-plasticity clay; Vol. II does not print the unit, and MPa (about 1,040 ksf and 125 ksf) gives strains consistent with the next sentence. Confirm against Charles (1993) before design use.
Charles (2008) reports self-weight settlement of less than 0.5% of the height for well-graded granular embankments and less than 1% for clay embankments (Nowak, 2012, p. 1062). Much of it happens during construction; the creep term is what continues under track.
A 25-ft embankment of stiff clay fill is built with heavy systematic compaction for a new connection track. Estimate the creep settlement between one year and 30 years after completion, and the self-weight settlement of the fill.
| Variable | Value | Description |
|---|---|---|
| H | 25 ft | Fill height |
| α | 0.5% per log cycle | Stiff clay fill, heavy compaction (Table 6.2-9) |
| t1, t2 | 1 yr, 30 yr | Period after completion |
| γ | 125 pcf | Fill unit weight |
| D* | 125 ksf | Low-plasticity clay fill (6 MPa) |
The creep settlement continues after the track is laid and is the part that needs a surfacing allowance. It adds to any consolidation of the foundation (Section 6.2.4.3 calculator).
Build the embankment early or surcharge it if the schedule allows, and plan for one or two surfacing cycles in the first years. Use a granular fill near structures, where its creep rate is an order of magnitude lower.
Open the consolidation settlement calculator →
Now adds fill creep and self-weight settlement to the foundation consolidation result.
Paraphrased from the published sources below; values are converted to English units. Individual railroads, clients and projects are not named.