| Boring | Sample | Depth (ft) | USCS | LL (%) | PI | e₀ | C_c | C_s | C_α | c_v (ft²/day) | OCR | σ'_p (psf) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B-01 | S-3 | 8–10 | CH | 72 | 45 | 1.82 | 0.56 | 0.07 | 0.022 | 0.0032 | 1.0 | 820 |
| B-01 | S-5 | 14–16 | CH | 68 | 41 | 1.71 | 0.52 | 0.065 | 0.021 | 0.0051 | 1.1 | 1,080 |
| B-02 | S-3 | 8–10 | OH | 105 | 63 | 2.45 | 0.88 | 0.11 | 0.062 | 0.0018 | 1.0 | 750 |
| B-02 | S-5 | 14–16 | CH | 74 | 47 | 1.88 | 0.59 | 0.074 | 0.024 | 0.0028 | 1.0 | 1,040 |
| B-03 | S-4 | 11–13 | CL | 48 | 25 | 1.35 | 0.31 | 0.039 | 0.012 | 0.0120 | 1.4 | 1,750 |
| B-03 | S-6 | 18–20 | CH | 69 | 43 | 1.77 | 0.53 | 0.066 | 0.021 | 0.0044 | 1.0 | 1,500 |
Design values selected: C_c = 0.56 (average CH); C_s = 0.07; C_α = 0.022; c_v = 0.004 ft²/day; e₀ = 1.82; one-way drainage to the surface (rock below the clay); H_dr = clay thickness.
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.