↑ Parent Menu⌂ Main Menu
← Chapter 6.2 Settlement Analysis
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · click a car to open it

6.2.17 Apps and Analytical Tools 18

Settlement analysis is the serviceability companion to the bearing capacity calculations developed in Chapter 6.1.
Authors: Daniel P. Colwell and Mario Ruel
6.2.17 Apps and Analytical Tools18

The web apps and the Geotechnical Analysis Suite calculators and workbook guides for this part of the analysis, gathered here from across the manual in the November 2026 restructure: 18 tools (12 interactive calculators). Where a tool applies to a particular section of this chapter it is also placed in that section in an orange tools strip. Each row lists the chapters and sections where the tool is used. Calculators open on dirtbert.com (sign-in required).

Apps

Each app runs in a web browser on a desktop or a phone, with nothing to install. How to use the apps (1.0.3).

Tools

Data Templates
DTData — Culvert SettlementUsed in Chapter 2.1, 2.1.5 Drainage Elements; Chapter 6.2, 6.2.7 Total Settlement and Angular DistortionCalculator ▸Guide
Field Forms & Logs
FFField Observation DataUsed in Chapter 3.8, 3.8.14 Monitoring and Early-Warning Indicators; Chapter 5.3, 5.3.6 Settlement Monitoring; Chapter 6.2, 6.2.7 Total Settlement and Angular DistortionCalculator ▸Guide
Pavements, Subgrade & Frost
PVFrost Penetration — Berggren EquationUsed in Chapter 2.3, 2.3.5 Subgrade Failure Modes; Chapter 7.3, 7.3.5 Frost DesignCalculator ▸Guide
PVFrost Penetration — Stefan EquationUsed in Chapter 2.3, 2.3.5 Subgrade Failure Modes; Chapter 7.3, 7.3.5 Frost DesignCalculator ▸Guide
PVPercent Saturation — Subgrade SamplesUsed in Chapter 2.3, 2.3.5 Subgrade Failure Modes; Chapter 5.2, 5.2.3 Test Methods — ASTM Standards and English Unit OutputsCalculator ▸Guide
PVRR Train Loads on SubgradeUsed in Chapter 2.3, 2.3.2 Load Distribution — Talbot MethodCalculator ▸Guide
Soil & Rock Properties
SPAtterberg Limits — Plasticity ChartUsed in Chapter 2.2, 2.2.3 Atterberg Limits (ASTM D4318); Chapter 5.2, 5.2.3 Test Methods — ASTM Standards and English Unit OutputsCalculator ▸Guide
SPGradationUsed in Chapter 2.2, 2.2.2 Grain-Size Analysisguide onlyGuide
Settlement & Heave
STConsolidation Index CorrelationsUsed in Chapter 2.2, 2.2.3 Atterberg Limits (ASTM D4318); Chapter 5.2, 5.2.3 Test Methods — ASTM Standards and English Unit Outputsguide onlyGuide
STConsolidation Settlement — Strip FootingUsed in Chapter 6.2, 6.2.4 Primary Consolidation SettlementCalculator ▸Guide
STHS20-44 Influence Pressuresneeds workUsed in Chapter 2.1, 2.1.7 Structural Foundations Supporting or Adjacent to the TrackCalculator ▸Guide
STHeave CalculationsUsed in Chapter 3.8, 3.8.2 Track Substructure Failure Mechanisms; Chapter 6.2, 6.2.7 Total Settlement and Angular DistortionCalculator ▸Guide
STSettlement — Fill + Cut over CulvertUsed in Chapter 2.1, 2.1.5 Drainage Elementsguide onlyGuide
STSettlement — Fill + Cut, InfiniteUsed in Chapter 6.2, 6.2.4 Primary Consolidation Settlementguide onlyGuide
STSettlement — Fill + Cut, Non-symmetric TrapezoidUsed in Chapter 2.1, 2.1.2 Embankments; Chapter 6.2, 6.2.4 Primary Consolidation Settlement; Chapter 7.2, 7.2.3 Prefabricated Vertical Drains (PVDs) with Staged LoadingCalculator ▸Guide
STSettlement — Rectangular FootingUsed in Chapter 6.2, 6.2.3 Immediate (Elastic) Settlementguide onlyGuide
STVertical Induced Pressures (Influence Factors)Used in Chapter 2.1, 2.1.7 Structural Foundations Supporting or Adjacent to the Track; Chapter 3.9, 3.9.5 Boring Depth Planning — Criteria and Equations (English Units); Chapter 6.2, 6.2.2 Stress Increase in Soil — Boussinesq DistributionCalculator ▸Guide
STWick Drain SpacingUsed in Chapter 6.2, 6.2.8 Preloading and Surcharge Design; Chapter 7.2, 7.2.3 Prefabricated Vertical Drains (PVDs) with Staged Loadingguide onlyGuide
Foundation Failure - Excessive Settlement
Foundation Failure - Excessive Settlement

Calculator: Consolidation Settlement and Time Rate (Section 6.2.4.3)

Calculator: Precompression Surcharge (Section 6.2.8.1)

← Previous · 6.0 Analysis Chapter 6.1 — Foundation Engineering: Bearing Capacity
Next · 6.0 Analysis → Chapter 6.3 — Slope Stability Analysis